메뉴 건너뛰기




Volumn 48, Issue 6, 2010, Pages 1705-1726

A hybrid genetic algorithm for flowshop lot streaming with setups and variable sublots

Author keywords

Hybrid genetic algorithm; Lot streaming; Variable sublots

Indexed keywords

COMPUTATIONAL RESULTS; EFFICIENT SOLUTION PROCEDURE; FLOW-SHOPS; HYBRID GENETIC ALGORITHMS; LEADTIME; LOT STREAMING; MANUFACTURING LEAD-TIME; MATHEMATICAL PROGRAMMING MODELS; MULTI-STAGE MANUFACTURING SYSTEMS; OPTIMALITY; OPTIMISATIONS; SET-UP TIME;

EID: 74549175886     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802660544     Document Type: Article
Times cited : (33)

References (20)
  • 1
    • 84985818856 scopus 로고
    • Solution procedures for the lot-streaming problem
    • Baker, K.R and Pyke, D.F., 1990. Solution procedures for the lot-streaming problem. Decision Sciences, 21 (3), 475-491.
    • (1990) Decision Sciences , vol.21 , Issue.3 , pp. 475-491
    • Baker, K.R.1    Pyke, D.F.2
  • 2
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • Baker, K.R., 1995. Lot streaming in the two-machine flow shop with setup times. Annals of Operations Research, 57 (1), 1-11.
    • (1995) Annals of Operations Research , vol.57 , Issue.1 , pp. 1-11
    • Baker, K.R.1
  • 3
    • 33644634541 scopus 로고    scopus 로고
    • Lot streaming with variable sublots: An integer programming formulation
    • Biskup, D. and Feldmann, M., 2006. Lot streaming with variable sublots: an integer programming formulation. Journal of Operational Research Society, 57 (3), 296-303.
    • (2006) Journal of Operational Research Society , vol.57 , Issue.3 , pp. 296-303
    • Biskup, D.1    Feldmann, M.2
  • 4
    • 0004026826 scopus 로고
    • Time-based competition
    • IL: Business One Irwin
    • Blackburn, J., 1991. Time-based competition. Burr Ridge, IL: Business One Irwin.
    • (1991) Burr Ridge
    • Blackburn, J.1
  • 7
    • 36249032554 scopus 로고    scopus 로고
    • Lot streaming in a multiple product permutation flow shop with intermingling
    • Feldmann, M. and Biskup, D., 2008. Lot streaming in a multiple product permutation flow shop with intermingling. International Journal ofProduction Research, 46 (1), 197-216.
    • (2008) International Journal ofProduction Research , vol.46 , Issue.1 , pp. 197-216
    • Feldmann, M.1    Biskup, D.2
  • 9
    • 3543079267 scopus 로고    scopus 로고
    • Scheduling and lot streaming in flow shops with no-wait in process
    • Hall, N.G., et al. , 2003. Scheduling and lot streaming in flow shops with no-wait in process. Journal of Scheduling, 6 (4), 339-354.
    • (2003) Journal of Scheduling , vol.6 , Issue.4 , pp. 339-354
    • Hall, N.G.1
  • 10
    • 2942516562 scopus 로고    scopus 로고
    • ILOG Inc, Mountain View, CA: ILOG. Available from:, Accessed 1 August
    • ILOG Inc., 2003. CPLEX 9.0 users manual. Mountain View, CA: ILOG. Available from: http://www.ilog.com [Accessed 1 August 2008].
    • (2003) CPLEX 9.0 users manual
  • 11
    • 0033708147 scopus 로고    scopus 로고
    • Lot streaming and scheduling heuristics or m-machine no-wait flow shop
    • Kumar, S., Bagchi, T., and Sriskandarajah, C., 2000. Lot streaming and scheduling heuristics or m-machine no-wait flow shop. Computers and Industrial Engineering, 38 (1), 149-172.
    • (2000) Computers and Industrial Engineering , vol.38 , Issue.1 , pp. 149-172
    • Kumar, S.1    Bagchi, T.2    Sriskandarajah, C.3
  • 12
    • 31744440102 scopus 로고    scopus 로고
    • Lindo Systems Inc, Chicago, IL: Lindo Systems
    • Lindo Systems Inc., 2002. LINGO: users guide. Chicago, IL: Lindo Systems.
    • (2002) LINGO: Users guide
  • 13
    • 0346243617 scopus 로고    scopus 로고
    • A heuristic method for discrete lot streaming with variable sublots in a flow shop
    • Liu, S.C., 2003. A heuristic method for discrete lot streaming with variable sublots in a flow shop. nternational Journal of Advanced Manufacturing Technology, 22 (9), 662-668.
    • (2003) nternational Journal of Advanced Manufacturing Technology , vol.22 , Issue.9 , pp. 662-668
    • Liu, S.C.1
  • 15
    • 44849088760 scopus 로고    scopus 로고
    • A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming
    • Martin, C.H., 2009. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. OMEGA International Journal of Management Sciences, 37 (1), 126-137.
    • (2009) OMEGA International Journal of Management Sciences , vol.37 , Issue.1 , pp. 126-137
    • Martin, C.H.1
  • 16
    • 0024925432 scopus 로고
    • Flow shop scheduling with lot streaming
    • Potts, C. and Baker, K., 1989. Flow shop scheduling with lot streaming. Operations Research Letters, 8 (6), 297-303.
    • (1989) Operations Research Letters , vol.8 , Issue.6 , pp. 297-303
    • Potts, C.1    Baker, K.2
  • 17
    • 0000659781 scopus 로고
    • A system for managing job shop production
    • Reiter, S., 1966. A system for managing job shop production. Journal of Business, 39 (3), 371-393.
    • (1966) Journal of Business , vol.39 , Issue.3 , pp. 371-393
    • Reiter, S.1
  • 18
    • 0033363409 scopus 로고    scopus 로고
    • Lot streaming and scheduling multiple products in two-machine no-wait flow shop
    • Sriskandarajah, C. and Wagneur, E., 1999. Lot streaming and scheduling multiple products in two-machine no-wait flow shop. IIE Transactions, 31 (8), 695-707.
    • (1999) IIE Transactions , vol.31 , Issue.8 , pp. 695-707
    • Sriskandarajah, C.1    Wagneur, E.2
  • 19
    • 0242328690 scopus 로고
    • Embedding of linear programming in a simulated annealing algorithm for solving a mixed integer production planning problem
    • Teghem, J., Pinot, M., and Antoniadis, C., 1995. Embedding of linear programming in a simulated annealing algorithm for solving a mixed integer production planning problem. Journal of Computational and Applied Mathematics, 64 (1-2), 91-102.
    • (1995) Journal of Computational and Applied Mathematics , vol.64 , Issue.1-2 , pp. 91-102
    • Teghem, J.1    Pinot, M.2    Antoniadis, C.3
  • 20
    • 0029378595 scopus 로고
    • Optimal lot streaming for multiple products in a two-machine flow shop
    • Vickson, R., 1995. Optimal lot streaming for multiple products in a two-machine flow shop. European Journal ofOperations Research, 85 (3), 556-575.
    • (1995) European Journal ofOperations Research , vol.85 , Issue.3 , pp. 556-575
    • Vickson, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.