-
1
-
-
84930512464
-
Scheduling
-
Systems Springer-Verlag New York
-
Pinedo M.L., Scheduling. Theory, Algorithms, and Systems, Springer-Verlag, New York, 2012.
-
(2012)
Theory Algorithms
-
-
Pinedo, M.L.1
-
2
-
-
84889808975
-
A dispatching algorithm for flexible job-shop scheduling with transfer batches: An industrial application
-
Calleja G., Pastor R., A dispatching algorithm for flexible job-shop scheduling with transfer batches: An industrial application, Prod. Plan. Control, 25, 2, 93-109, 2014.
-
(2014)
Prod. Plan. Control
, vol.25
, Issue.2
, pp. 93-109
-
-
Calleja, G.1
Pastor, R.2
-
3
-
-
84865353852
-
Mathematical model and parallel genetic algorithm for hybrid flexible flowshop lot streaming problem
-
Defersha F.M., Chen M., Mathematical model and parallel genetic algorithm for hybrid flexible flowshop lot streaming problem, Int. J. Adv. Manuf. Tech., 62, 1, 249-265, 2012.
-
(2012)
Int. J. Adv. Manuf. Tech.
, vol.62
, Issue.1
, pp. 249-265
-
-
Defersha, F.M.1
Chen, M.2
-
4
-
-
84902836669
-
An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations
-
Demir Y., Isleyen S.K., An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations, Int. J. Prod. Res., 52, 13, 3905-3921, 2014.
-
(2014)
Int. J. Prod. Res.
, vol.52
, Issue.13
, pp. 3905-3921
-
-
Demir, Y.1
Isleyen, S.K.2
-
5
-
-
70349490226
-
An improved pso algorithm for flexible job shop scheduling with lot-splitting
-
Jun-jie B., Yi-guang G., Ning-sheng W., Dun-bing T., An Improved PSO Algorithm for Flexible Job Shop Scheduling with Lot-Splitting, International Workshop on Intelligent Systems and Applications, 2009.
-
(2009)
International Workshop on Intelligent Systems and Applications
-
-
Jun-Jie, B.1
Yi-Guang, G.2
Ning-Sheng, W.3
Dun-Bing, T.4
-
6
-
-
79957742860
-
Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm
-
Al-Hinai N., ElMekkawy T.Y., Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm, Int. J. Prod. Econ., 132, 2, 279-291, 2011.
-
(2011)
Int. J. Prod. Econ.
, vol.132
, Issue.2
, pp. 279-291
-
-
Al-Hinai, N.1
ElMekkawy, T.Y.2
-
7
-
-
79960511352
-
Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns
-
Hasan S.M.K., Sarker R., Essam D., Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns, Int. J. Prod. Res., 49, 16, 4999-5015, 2011.
-
(2011)
Int. J. Prod. Res.
, vol.49
, Issue.16
, pp. 4999-5015
-
-
Hasan, S.M.K.1
Sarker, R.2
Essam, D.3
-
8
-
-
84875448680
-
Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies
-
He W., Sun D.-h., Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies, Int. J. Adv. Manuf. Tech, 66, 1, 501-514, 2013.
-
(2013)
Int. J. Adv. Manuf. Tech
, vol.66
, Issue.1
, pp. 501-514
-
-
He, W.1
Sun, D.-H.2
-
9
-
-
84894900480
-
A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
-
Li J.-Q., Pan Q.-K., Tasgetiren M.F., A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities, Appl. Math. Model., 38, 3, 1111-1132, 2014.
-
(2014)
Appl. Math. Model.
, vol.38
, Issue.3
, pp. 1111-1132
-
-
Li, J.-Q.1
Pan, Q.-K.2
Tasgetiren, M.F.3
-
10
-
-
77955473840
-
An effective heuristic for flexible job-shop scheduling problem with maintenance activities
-
Wang S., Yu J., An effective heuristic for flexible job-shop scheduling problem with maintenance activities, Comput. Ind. Eng., 59, 3, 436-447, 2010.
-
(2010)
Comput. Ind. Eng.
, vol.59
, Issue.3
, pp. 436-447
-
-
Wang, S.1
Yu, J.2
-
11
-
-
26844532556
-
Hybrid genetic algorithm for the flexible job-shop problem under maintenance constraints
-
Wang L., Chen K., Ong Y. [Eds.], LNCS 3612 Springer Berlin Heidelberg
-
Zribi N., Borne P., Hybrid Genetic Algorithm for the Flexible Job-Shop Problem Under Maintenance Constraints, Advances in Natural Computation, Wang L., Chen K., Ong Y. [Eds.], LNCS 3612, Springer Berlin Heidelberg, 259-268, 2005.
-
(2005)
Advances in Natural Computation
, pp. 259-268
-
-
Zribi, N.1
Borne, P.2
-
12
-
-
84872069456
-
Multimachine scheduling problem with setup times
-
Boejko W., Uchronski M., Wodecki M., Multimachine scheduling problem with setup times, Archives of Control Science, 22, 4, 441-449, 2012.
-
(2012)
Archives of Control Science
, vol.22
, Issue.4
, pp. 441-449
-
-
Boejko, W.1
Uchronski, M.2
Wodecki, M.3
-
13
-
-
80051694264
-
The flexible blocking job shop with transfer and set-up times
-
Gröflin H., Pham D.N., Bürgy R., The flexible blocking job shop with transfer and set-up times, J. Comb. Optim., 22, 2, 121-144, 2011.
-
(2011)
J. Comb. Optim.
, vol.22
, Issue.2
, pp. 121-144
-
-
Gröflin, H.1
Pham, D.N.2
Bürgy, R.3
-
15
-
-
84880236885
-
Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness
-
Mousakhani M., Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness, Int. J. Prod. Res., 51, 12, 3476-3487, 2013.
-
(2013)
Int. J. Prod. Res.
, vol.51
, Issue.12
, pp. 3476-3487
-
-
Mousakhani, M.1
-
16
-
-
84916623290
-
Simultaneous lot-sizing and scheduling in flexible job shop problems
-
Rohaninejad M., Kheirkhah A., Fattahi P., Simultaneous lot-sizing and scheduling in flexible job shop problems, Int. J. Adv. Manuf. Tech., 78, 1, 1-18, 2015.
-
(2015)
Int. J. Adv. Manuf. Tech.
, vol.78
, Issue.1
, pp. 1-18
-
-
Rohaninejad, M.1
Kheirkhah, A.2
Fattahi, P.3
-
17
-
-
84900466232
-
Flexible job shop scheduling with sequencedependent setup and transportation times by ant colony with reinforced pheromone relationships
-
Rossi A., Flexible job shop scheduling with sequencedependent setup and transportation times by ant colony with reinforced pheromone relationships, Int. J. Prod. Econ., 152, 253-267, 2014.
-
(2014)
Int. J. Prod. Econ.
, vol.152
, pp. 253-267
-
-
Rossi, A.1
-
19
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
Aytug H., Lawley M. A., McKay K., Mohan S., Uzsoy R., Executing production schedules in the face of uncertainties: A review and some future directions, Eur. J. Oper. Res., 161, 1, 86-110, 2005.
-
(2005)
Eur. J. Oper. Res.
, vol.161
, Issue.1
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
20
-
-
68249099005
-
A survey of dynamic scheduling in manufacturing systems
-
Ouelhadj D., Petrovic S., A survey of dynamic scheduling in manufacturing systems, J. Sched., 12, 4, 417-431, 2009.
-
(2009)
J. Sched.
, vol.12
, Issue.4
, pp. 417-431
-
-
Ouelhadj, D.1
Petrovic, S.2
-
21
-
-
34548209982
-
A complete multiagent framework for robust and adaptable dynamic job shop scheduling
-
Liu N., Abdelrahman M., Ramaswamy, S., A Complete Multiagent Framework for Robust and Adaptable Dynamic Job Shop Scheduling, IEEE Trans. Syst., Man, Cybern., Part C: Applications and Reviews, 37, 5, 904-916, 2007.
-
(2007)
IEEE Trans. Syst., Man, Cybern., Part C: Applications and Reviews
, vol.37
, Issue.5
, pp. 904-916
-
-
Liu, N.1
Abdelrahman, M.2
Ramaswamy, S.3
-
22
-
-
84857782251
-
Multiagent-based proactive-reactive scheduling for a job shop
-
Lou P., Liu Q., Zhou Z., Wang H., Sun S.X., Multiagent-based proactive-reactive scheduling for a job shop, Int. J. Adv. Manuf. Tech., 59, 1-4, 311-324, 2012.
-
(2012)
Int. J. Adv. Manuf. Tech.
, vol.59
, Issue.1-4
, pp. 311-324
-
-
Lou, P.1
Liu, Q.2
Zhou, Z.3
Wang, H.4
Sun, S.X.5
-
23
-
-
69849097830
-
-
Hoeve W.-J., Hooker J.N. [Eds.], LNCS 5547 Springer Berlin Heidelberg
-
Laborie P., IBM ILOG CP Optimizer for Detailed Scheduling Illustrated on Three Problems, Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, Hoeve W.-J., Hooker J.N. [Eds.], LNCS 5547, Springer Berlin Heidelberg, 148-162, 2009.
-
(2009)
IBM ILOG CP Optimizer for Detailed Scheduling Illustrated on Three Problems, Integration of AI and or Techniques in Constraint Programming for Combinatorial Optimization Problems
, pp. 148-162
-
-
Laborie, P.1
-
24
-
-
84965000627
-
Quintiq
-
[accessed on December 14 2015]
-
Quintiq. World records: Flexible job shop scheduling problem, http://www.quintiq.com/optimization/fjssp-worldrecords. html [accessed on December 14, 2015].
-
World Records: Flexible Job Shop Scheduling Problem
-
-
-
25
-
-
84883172513
-
-
[accessed on December 14 2015]
-
CPN Tools Homepage, http://cpntools.org, [accessed on December 14, 2015].
-
CPN Tools Homepage
-
-
-
27
-
-
50149094327
-
-
Zhang H., Gu M., Song X., Modeling and Analysis of Real-Life Job Shop Scheduling Problems by Petri nets, Simulation Symposium, ANSS 2008, 41st Annual, 279-285, 2008.
-
(2008)
Modeling and Analysis of Real-Life Job Shop Scheduling Problems by Petri Nets, Simulation Symposium, ANSS 2008, 41st Annual
, pp. 279-285
-
-
Zhang, H.1
Gu, M.2
Song, X.3
-
28
-
-
69649092723
-
Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods
-
Aized T., Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods, Comput. Ind. Eng., 57, 3, 822-831, 2009.
-
(2009)
Comput. Ind. Eng.
, vol.57
, Issue.3
, pp. 822-831
-
-
Aized, T.1
-
30
-
-
30544441225
-
Adacor: A holonic architecture for agile and adaptive manufacturing control
-
Leit?ao P., Restivo F., ADACOR: A holonic architecture for agile and adaptive manufacturing control, Comput. Ind., 57, 2, 121-130, 2006.
-
(2006)
Comput. Ind.
, vol.57
, Issue.2
, pp. 121-130
-
-
Leitao, P.1
Restivo, F.2
-
31
-
-
84922120859
-
An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem
-
[published online
-
Nouiri M., Bekrar A., Jemai A., Niar S., Ammari A.C., An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem, J. Intell. Manuf., 1-13, 2015 [published online, DOI: 10.1007/s10845-015-1039-3].
-
(2015)
J. Intell. Manuf.
, pp. 1-13
-
-
Nouiri, M.1
Bekrar, A.2
Jemai, A.3
Niar, S.4
Ammari, A.C.5
-
33
-
-
84986841321
-
-
Glover F., Artificial intelligence, heuristic frameworks and tabu search, Managerial & Decision Economics, 11, 365-378, 1990.
-
(1990)
Artificial Intelligence, Heuristic Frameworks and Tabu Search, Managerial & Decision Economics
, vol.11
, pp. 365-378
-
-
Glover, F.1
-
34
-
-
0037302910
-
Problem difficulty for tabu search in job-shop scheduling
-
Watson J.-P., Beck J.C., Howe A.E., Whitley L.D., Problem difficulty for tabu search in job-shop scheduling, Artif. Intell., 143, 2, 189-217, 2003.
-
(2003)
Artif. Intell.
, vol.143
, Issue.2
, pp. 189-217
-
-
Watson, J.-P.1
Beck, J.C.2
Howe, A.E.3
Whitley, L.D.4
-
35
-
-
33748706709
-
-
[Eds.] Elsevier, Pisa, Italy
-
Rossi F., Van Beek P., Walsh T. [Eds.], Handbook of Constraint Programming, Elsevier, Pisa, Italy, 2006.
-
(2006)
Handbook of Constraint Programming
-
-
Rossi, F.1
Van Beek, P.2
Walsh, T.3
-
36
-
-
84870248520
-
Evaluation of mathematical models for flexible job-shop scheduling problems
-
Demir Y., ? I?sleyen S.K., Evaluation of mathematical models for flexible job-shop scheduling problems, Appl. Math. Model., 37, 3, 977-988, 2013.
-
(2013)
Appl. Math. Model.
, vol.37
, Issue.3
, pp. 977-988
-
-
Demir, Y.1
Isleyen, S.K.2
-
37
-
-
70149094122
-
Agent-based distributed manufacturing control: A state-of-the-art survey
-
Leit?ao P., Agent-based distributed manufacturing control: A state-of-the-art survey, Eng. Appl. Artif. Intel., 22, 7, 979-991, 2009.
-
(2009)
Eng. Appl. Artif. Intel.
, vol.22
, Issue.7
, pp. 979-991
-
-
Leitao, P.1
-
38
-
-
0032096675
-
Multiagent systems
-
Sycara K.P., Multiagent systems, AI Magazine, 19, 2, 79-92, 1998.
-
(1998)
AI Magazine
, vol.19
, Issue.2
, pp. 79-92
-
-
Sycara, K.P.1
|