메뉴 건너뛰기




Volumn 7, Issue 1, 2016, Pages 21-32

Off-line and dynamic production scheduling - A comparative case study

Author keywords

Constraint programming; Dispatching rules; Dynamic scheduling; Flexible job shop; Lot streaming; Multi agent systems; Off line scheduling; Petri nets; Tabu search

Indexed keywords


EID: 84965081697     PISSN: 20808208     EISSN: 20821344     Source Type: Journal    
DOI: 10.1515/mper-2016-0003     Document Type: Article
Times cited : (9)

References (38)
  • 1
    • 84930512464 scopus 로고    scopus 로고
    • Scheduling
    • Systems Springer-Verlag New York
    • Pinedo M.L., Scheduling. Theory, Algorithms, and Systems, Springer-Verlag, New York, 2012.
    • (2012) Theory Algorithms
    • Pinedo, M.L.1
  • 2
    • 84889808975 scopus 로고    scopus 로고
    • A dispatching algorithm for flexible job-shop scheduling with transfer batches: An industrial application
    • Calleja G., Pastor R., A dispatching algorithm for flexible job-shop scheduling with transfer batches: An industrial application, Prod. Plan. Control, 25, 2, 93-109, 2014.
    • (2014) Prod. Plan. Control , vol.25 , Issue.2 , pp. 93-109
    • Calleja, G.1    Pastor, R.2
  • 3
    • 84865353852 scopus 로고    scopus 로고
    • Mathematical model and parallel genetic algorithm for hybrid flexible flowshop lot streaming problem
    • Defersha F.M., Chen M., Mathematical model and parallel genetic algorithm for hybrid flexible flowshop lot streaming problem, Int. J. Adv. Manuf. Tech., 62, 1, 249-265, 2012.
    • (2012) Int. J. Adv. Manuf. Tech. , vol.62 , Issue.1 , pp. 249-265
    • Defersha, F.M.1    Chen, M.2
  • 4
    • 84902836669 scopus 로고    scopus 로고
    • An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations
    • Demir Y., Isleyen S.K., An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations, Int. J. Prod. Res., 52, 13, 3905-3921, 2014.
    • (2014) Int. J. Prod. Res. , vol.52 , Issue.13 , pp. 3905-3921
    • Demir, Y.1    Isleyen, S.K.2
  • 6
    • 79957742860 scopus 로고    scopus 로고
    • Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm
    • Al-Hinai N., ElMekkawy T.Y., Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm, Int. J. Prod. Econ., 132, 2, 279-291, 2011.
    • (2011) Int. J. Prod. Econ. , vol.132 , Issue.2 , pp. 279-291
    • Al-Hinai, N.1    ElMekkawy, T.Y.2
  • 7
    • 79960511352 scopus 로고    scopus 로고
    • Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns
    • Hasan S.M.K., Sarker R., Essam D., Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns, Int. J. Prod. Res., 49, 16, 4999-5015, 2011.
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.16 , pp. 4999-5015
    • Hasan, S.M.K.1    Sarker, R.2    Essam, D.3
  • 8
    • 84875448680 scopus 로고    scopus 로고
    • Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies
    • He W., Sun D.-h., Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies, Int. J. Adv. Manuf. Tech, 66, 1, 501-514, 2013.
    • (2013) Int. J. Adv. Manuf. Tech , vol.66 , Issue.1 , pp. 501-514
    • He, W.1    Sun, D.-H.2
  • 9
    • 84894900480 scopus 로고    scopus 로고
    • A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
    • Li J.-Q., Pan Q.-K., Tasgetiren M.F., A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities, Appl. Math. Model., 38, 3, 1111-1132, 2014.
    • (2014) Appl. Math. Model. , vol.38 , Issue.3 , pp. 1111-1132
    • Li, J.-Q.1    Pan, Q.-K.2    Tasgetiren, M.F.3
  • 10
    • 77955473840 scopus 로고    scopus 로고
    • An effective heuristic for flexible job-shop scheduling problem with maintenance activities
    • Wang S., Yu J., An effective heuristic for flexible job-shop scheduling problem with maintenance activities, Comput. Ind. Eng., 59, 3, 436-447, 2010.
    • (2010) Comput. Ind. Eng. , vol.59 , Issue.3 , pp. 436-447
    • Wang, S.1    Yu, J.2
  • 11
    • 26844532556 scopus 로고    scopus 로고
    • Hybrid genetic algorithm for the flexible job-shop problem under maintenance constraints
    • Wang L., Chen K., Ong Y. [Eds.], LNCS 3612 Springer Berlin Heidelberg
    • Zribi N., Borne P., Hybrid Genetic Algorithm for the Flexible Job-Shop Problem Under Maintenance Constraints, Advances in Natural Computation, Wang L., Chen K., Ong Y. [Eds.], LNCS 3612, Springer Berlin Heidelberg, 259-268, 2005.
    • (2005) Advances in Natural Computation , pp. 259-268
    • Zribi, N.1    Borne, P.2
  • 13
    • 80051694264 scopus 로고    scopus 로고
    • The flexible blocking job shop with transfer and set-up times
    • Gröflin H., Pham D.N., Bürgy R., The flexible blocking job shop with transfer and set-up times, J. Comb. Optim., 22, 2, 121-144, 2011.
    • (2011) J. Comb. Optim. , vol.22 , Issue.2 , pp. 121-144
    • Gröflin, H.1    Pham, D.N.2    Bürgy, R.3
  • 15
    • 84880236885 scopus 로고    scopus 로고
    • Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness
    • Mousakhani M., Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness, Int. J. Prod. Res., 51, 12, 3476-3487, 2013.
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.12 , pp. 3476-3487
    • Mousakhani, M.1
  • 16
    • 84916623290 scopus 로고    scopus 로고
    • Simultaneous lot-sizing and scheduling in flexible job shop problems
    • Rohaninejad M., Kheirkhah A., Fattahi P., Simultaneous lot-sizing and scheduling in flexible job shop problems, Int. J. Adv. Manuf. Tech., 78, 1, 1-18, 2015.
    • (2015) Int. J. Adv. Manuf. Tech. , vol.78 , Issue.1 , pp. 1-18
    • Rohaninejad, M.1    Kheirkhah, A.2    Fattahi, P.3
  • 17
    • 84900466232 scopus 로고    scopus 로고
    • Flexible job shop scheduling with sequencedependent setup and transportation times by ant colony with reinforced pheromone relationships
    • Rossi A., Flexible job shop scheduling with sequencedependent setup and transportation times by ant colony with reinforced pheromone relationships, Int. J. Prod. Econ., 152, 253-267, 2014.
    • (2014) Int. J. Prod. Econ. , vol.152 , pp. 253-267
    • Rossi, A.1
  • 19
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug H., Lawley M. A., McKay K., Mohan S., Uzsoy R., Executing production schedules in the face of uncertainties: A review and some future directions, Eur. J. Oper. Res., 161, 1, 86-110, 2005.
    • (2005) Eur. J. Oper. Res. , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 20
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • Ouelhadj D., Petrovic S., A survey of dynamic scheduling in manufacturing systems, J. Sched., 12, 4, 417-431, 2009.
    • (2009) J. Sched. , vol.12 , Issue.4 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 22
    • 84857782251 scopus 로고    scopus 로고
    • Multiagent-based proactive-reactive scheduling for a job shop
    • Lou P., Liu Q., Zhou Z., Wang H., Sun S.X., Multiagent-based proactive-reactive scheduling for a job shop, Int. J. Adv. Manuf. Tech., 59, 1-4, 311-324, 2012.
    • (2012) Int. J. Adv. Manuf. Tech. , vol.59 , Issue.1-4 , pp. 311-324
    • Lou, P.1    Liu, Q.2    Zhou, Z.3    Wang, H.4    Sun, S.X.5
  • 24
    • 84965000627 scopus 로고    scopus 로고
    • Quintiq
    • [accessed on December 14 2015]
    • Quintiq. World records: Flexible job shop scheduling problem, http://www.quintiq.com/optimization/fjssp-worldrecords. html [accessed on December 14, 2015].
    • World Records: Flexible Job Shop Scheduling Problem
  • 25
    • 84883172513 scopus 로고    scopus 로고
    • [accessed on December 14 2015]
    • CPN Tools Homepage, http://cpntools.org, [accessed on December 14, 2015].
    • CPN Tools Homepage
  • 28
    • 69649092723 scopus 로고    scopus 로고
    • Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods
    • Aized T., Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods, Comput. Ind. Eng., 57, 3, 822-831, 2009.
    • (2009) Comput. Ind. Eng. , vol.57 , Issue.3 , pp. 822-831
    • Aized, T.1
  • 30
    • 30544441225 scopus 로고    scopus 로고
    • Adacor: A holonic architecture for agile and adaptive manufacturing control
    • Leit?ao P., Restivo F., ADACOR: A holonic architecture for agile and adaptive manufacturing control, Comput. Ind., 57, 2, 121-130, 2006.
    • (2006) Comput. Ind. , vol.57 , Issue.2 , pp. 121-130
    • Leitao, P.1    Restivo, F.2
  • 31
    • 84922120859 scopus 로고    scopus 로고
    • An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem
    • [published online
    • Nouiri M., Bekrar A., Jemai A., Niar S., Ammari A.C., An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem, J. Intell. Manuf., 1-13, 2015 [published online, DOI: 10.1007/s10845-015-1039-3].
    • (2015) J. Intell. Manuf. , pp. 1-13
    • Nouiri, M.1    Bekrar, A.2    Jemai, A.3    Niar, S.4    Ammari, A.C.5
  • 34
    • 0037302910 scopus 로고    scopus 로고
    • Problem difficulty for tabu search in job-shop scheduling
    • Watson J.-P., Beck J.C., Howe A.E., Whitley L.D., Problem difficulty for tabu search in job-shop scheduling, Artif. Intell., 143, 2, 189-217, 2003.
    • (2003) Artif. Intell. , vol.143 , Issue.2 , pp. 189-217
    • Watson, J.-P.1    Beck, J.C.2    Howe, A.E.3    Whitley, L.D.4
  • 36
    • 84870248520 scopus 로고    scopus 로고
    • Evaluation of mathematical models for flexible job-shop scheduling problems
    • Demir Y., ? I?sleyen S.K., Evaluation of mathematical models for flexible job-shop scheduling problems, Appl. Math. Model., 37, 3, 977-988, 2013.
    • (2013) Appl. Math. Model. , vol.37 , Issue.3 , pp. 977-988
    • Demir, Y.1    Isleyen, S.K.2
  • 37
    • 70149094122 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing control: A state-of-the-art survey
    • Leit?ao P., Agent-based distributed manufacturing control: A state-of-the-art survey, Eng. Appl. Artif. Intel., 22, 7, 979-991, 2009.
    • (2009) Eng. Appl. Artif. Intel. , vol.22 , Issue.7 , pp. 979-991
    • Leitao, P.1
  • 38
    • 0032096675 scopus 로고    scopus 로고
    • Multiagent systems
    • Sycara K.P., Multiagent systems, AI Magazine, 19, 2, 79-92, 1998.
    • (1998) AI Magazine , vol.19 , Issue.2 , pp. 79-92
    • Sycara, K.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.