메뉴 건너뛰기




Volumn 159, Issue 1, 2008, Pages 275-292

Fuzzy job shop scheduling with lot-sizing

Author keywords

Batching; Dispatching rules; Fuzzy multi objective genetic algorithm; Fuzzy rule based system; Job shop scheduling; Lot sizing; Real world application

Indexed keywords


EID: 38749112986     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-007-0287-9     Document Type: Article
Times cited : (56)

References (35)
  • 2
    • 3242724127 scopus 로고    scopus 로고
    • A heuristic approach to batching and scheduling a single machine to minimise setup costs
    • 2
    • Agnetis, A., Alfieri, A., & Nicosia, G. (2004). A heuristic approach to batching and scheduling a single machine to minimise setup costs. Computers & Industrial Engineering, 46(2), 793-802.
    • (2004) Computers & Industrial Engineering , vol.46 , pp. 793-802
    • Agnetis, A.1    Alfieri, A.2    Nicosia, G.3
  • 11
    • 0029638856 scopus 로고
    • Single machine scheduling problem with fuzzy precedence relation
    • 2
    • Ishii, H., & Tada, M. (1995). Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research, 87(2), 284-288.
    • (1995) European Journal of Operational Research , vol.87 , pp. 284-288
    • Ishii, H.1    Tada, M.2
  • 12
    • 0000996580 scopus 로고
    • Two scheduling problems with fuzzy due-dates
    • 3
    • Ishii, H., Tada, M., & Masuda, T. (1992). Two scheduling problems with fuzzy due-dates. Fuzzy Sets and Systems, 6(3), 336-347.
    • (1992) Fuzzy Sets and Systems , vol.6 , pp. 336-347
    • Ishii, H.1    Tada, M.2    Masuda, T.3
  • 18
    • 0027964028 scopus 로고
    • Fuzzy optimization-based scheduling of identical machines with possible breakdown
    • San Diego, USA, May 1994
    • Li, Y., Luh, P. B., & Guan, X. (1994). Fuzzy optimization-based scheduling of identical machines with possible breakdown. In Proceedings-IEEE international conference on robotics and automation (pp. 3447-3452). San Diego, USA, May 1994.
    • (1994) Proceedings-IEEE International Conference on Robotics and Automation , pp. 3447-3452
    • Li, Y.1    Luh, P.B.2    Guan, X.3
  • 19
    • 0032050798 scopus 로고    scopus 로고
    • Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach
    • 4
    • Ouenniche, J., & Boctor, F. (1998). Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach. International Journal of Production Research, 36(4), 1125-1140.
    • (1998) International Journal of Production Research , vol.36 , pp. 1125-1140
    • Ouenniche, J.1    Boctor, F.2
  • 21
    • 0026393398 scopus 로고
    • Decision support for improving systems reliability by redundancy
    • Petrovic, D. (1991). Decision support for improving systems reliability by redundancy. European Journal of Operational Research, 55, 357-367.
    • (1991) European Journal of Operational Research , vol.55 , pp. 357-367
    • Petrovic, D.1
  • 24
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • 5
    • Potts, C. N., & Van Wassenhove, L. N. (1995). Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity. Journal of Operational Research Society, 43(5), 395-406.
    • (1995) Journal of Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 26
    • 0029224965 scopus 로고
    • A genetic algorithm for flowshop sequencing
    • 1
    • Reeves, C. (1995b). A genetic algorithm for flowshop sequencing. Computers and Operations Research, 22(1), 5-13.
    • (1995) Computers and Operations Research , vol.22 , pp. 5-13
    • Reeves, C.1
  • 28
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
    • 2
    • Sakawa, M., & Kubota, R. (2000). Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research, 120(2), 393-407.
    • (2000) European Journal of Operational Research , vol.120 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2
  • 29
    • 0037061441 scopus 로고    scopus 로고
    • A genetic algorithm for solving economic lot size scheduling problem
    • Sarker, R., & Newton, C. (2002). A genetic algorithm for solving economic lot size scheduling problem. Computers & Industrial Engineering, 42, 189-198.
    • (2002) Computers & Industrial Engineering , vol.42 , pp. 189-198
    • Sarker, R.1    Newton, C.2
  • 32
    • 0039705378 scopus 로고
    • An efficient method for solving flow shop problem with fuzzy processing times
    • Tsujimura, Y., Park, S., Change, I. S., & Gen, M. (1993). An efficient method for solving flow shop problem with fuzzy processing times. Computer and Industrial Engineering, 25, 239-242.
    • (1993) Computer and Industrial Engineering , vol.25 , pp. 239-242
    • Tsujimura, Y.1    Park, S.2    Change, I.S.3    Gen, M.4
  • 34
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management Science, 5, 89-96.
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 35
    • 0001631854 scopus 로고
    • A scientific routine for stock control
    • Wilson, R. H. (1934). A scientific routine for stock control. Harvard Business Review, 13, 116-128.
    • (1934) Harvard Business Review , vol.13 , pp. 116-128
    • Wilson, R.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.