Volumn 39, Issue 12, 2014, Pages 9283-9300

A Study on Integration of Lot Sizing and Flow Shop Lot Streaming Problems

Author keywords

Intermingling; Lot sizing; Lot streaming; Preventive maintenance; Variable sublots

Indexed keywords


EID: 84916608027     PISSN: 2193567X     EISSN: 21914281     Source Type: Journal    
DOI: 10.1007/s13369-014-1416-9     Document Type: Article
Times cited : (11)

References (51)
  • 1
    • 77951098481 scopus 로고    scopus 로고
    • Production planning and scheduling integration through augmented lagrangian optimization
    • Li Z., Ierapetritou M.G.: Production planning and scheduling integration through augmented lagrangian optimization. Comput. Chem. Eng. 34(6), 996–1006 (2010)
    • (2010) Comput. Chem. Eng , vol.34 , Issue.6 , pp. 996-1006
    • Li, Z.1    Ierapetritou, M.G.2
  • 2
    • 33846297292 scopus 로고    scopus 로고
    • A case study on integrated production planning and scheduling in a three-stage manufacturing system
    • Yan H., Zhang X.: A case study on integrated production planning and scheduling in a three-stage manufacturing system. IEEE Trans. Autom. Sci. Eng. 4(1), 86–92 (2007)
    • (2007) IEEE Trans. Autom. Sci. Eng , vol.4 , Issue.1 , pp. 86-92
    • Yan, H.1    Zhang, X.2
  • 3
    • 0000429764 scopus 로고
    • An integrated model for job-shop planning and scheduling
    • Lasserre J.: An integrated model for job-shop planning and scheduling. Manag. Sci. 38(8), 1201–1211 (1992)
    • (1992) Manag. Sci , vol.38 , Issue.8 , pp. 1201-1211
    • Lasserre, J.1
  • 4
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity
    • Potts, C.N.; Van Wassenhove, L.N.: Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. J. Oper. Res. Soc. 43(5), 395–406 (1992)
    • (1992) J. Oper. Res. Soc , vol.43 , Issue.5 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 5
    • 84889762835 scopus 로고    scopus 로고
    • Multi-objective aggregate production planning model with fuzzy parameters and its solving methods
    • Mortezaei N., Zulkifli N., Hong T.S., Yusuff R.M.: Multi-objective aggregate production planning model with fuzzy parameters and its solving methods. Life Sci. J. 10(4), 2406–2414 (2013)
    • (2013) Life Sci. J , vol.10 , Issue.4 , pp. 2406-2414
    • Mortezaei, N.1    Zulkifli, N.2    Hong, T.S.3    Yusuff, R.M.4
  • 6
    • 0042204356 scopus 로고    scopus 로고
    • Integrated production planning and scheduling on automobile assembly lines
    • Yan H., Xia Q., Zhu M., Liu X., Guo Z.: Integrated production planning and scheduling on automobile assembly lines. Iie Trans. 35(8), 711–725 (2003)
    • (2003) Iie Trans , vol.35 , Issue.8 , pp. 711-725
    • Yan, H.1    Xia, Q.2    Zhu, M.3    Liu, X.4    Guo, Z.5
  • 7
    • 78649467567 scopus 로고    scopus 로고
    • A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly
    • Palaniappan P.K., Jawahar N.: A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly. Int. J. Prod. Res. 49(2), 375–400 (2011)
    • (2011) Int. J. Prod. Res , vol.49 , Issue.2 , pp. 375-400
    • Palaniappan, P.K.1    Jawahar, N.2
  • 8
    • 84875260385 scopus 로고    scopus 로고
    • MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints
    • Ramezanian R., Saidi-Mehrabad M., Fattahi P.: MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints. J. Manuf. Syst. 32(2), 392–401 (2013)
    • (2013) J. Manuf. Syst , vol.32 , Issue.2 , pp. 392-401
    • Ramezanian, R.1    Saidi-Mehrabad, M.2    Fattahi, P.3
  • 9
    • 0033702610 scopus 로고    scopus 로고
    • Evaluation of the potential benefits of lot streaming in flow-shop systems
    • Kalir A.A., Sarin S.C.: Evaluation of the potential benefits of lot streaming in flow-shop systems. Int. J. Prod. Econ. 66(2), 131–142 (2000). doi:10.1016/S0925-5273(99)00115-2
    • (2000) Int. J. Prod. Econ , vol.66 , Issue.2 , pp. 131-142
    • Kalir, A.A.1    Sarin, S.C.2
  • 10
    • 13444302670 scopus 로고    scopus 로고
    • Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
    • Zhang W., Yin C., Liu J., Linn R.J.: Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops. Int. J. Prod. Econ. 96(2), 189–200 (2005)
    • (2005) Int. J. Prod. Econ , vol.96 , Issue.2 , pp. 189-200
    • Zhang, W.1    Yin, C.2    Liu, J.3    Linn, R.J.4
  • 11
    • 0037372761 scopus 로고    scopus 로고
    • Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups
    • Kalir A.A., Sarin S.C.: Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups. J. Comb. Optim. 7(1), 23–44 (2003)
    • (2003) J. Comb. Optim , vol.7 , Issue.1 , pp. 23-44
    • Kalir, A.A.1    Sarin, S.C.2
  • 13
    • 84985818856 scopus 로고
    • Solution procedures for the lot-streaming problem
    • Baker K., Pyke D.: Solution procedures for the lot-streaming problem. Decis. Sci. 21(3), 475–491 (1990)
    • (1990) Decis. Sci , vol.21 , Issue.3 , pp. 475-491
    • Baker, K.1    Pyke, D.2
  • 14
    • 11844252552 scopus 로고    scopus 로고
    • On lot streaming in multistage production systems
    • Hoque M.A., Goyal S.K.: On lot streaming in multistage production systems. Int. J. Prod. Econ. 95(2), 195–202 (2005)
    • (2005) Int. J. Prod. Econ , vol.95 , Issue.2 , pp. 195-202
    • Hoque, M.A.1    Goyal, S.K.2
  • 15
    • 43849110246 scopus 로고    scopus 로고
    • A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
    • Tseng C., Liao C.: A discrete particle swarm optimization for lot-streaming flowshop scheduling problem. Eur. J. Oper. Res. 191(2), 360–373 (2008)
    • (2008) Eur. J. Oper. Res , vol.191 , Issue.2 , pp. 360-373
    • Tseng, C.1    Liao, C.2
  • 16
    • 0028769359 scopus 로고
    • Lot streaming in three-stage production processes
    • Glass C.A., Gupta J.N.D., Potts C.N.: Lot streaming in three-stage production processes. Eur. J. Oper. Res. 75(2), 378–394 (1994)
    • (1994) Eur. J. Oper. Res , vol.75 , Issue.2 , pp. 378-394
    • Glass, C.A.1    Gupta, J.N.D.2    Potts, C.N.3
  • 17
    • 36249032554 scopus 로고    scopus 로고
    • Lot streaming in a multiple product permutation flow shop with intermingling
    • Feldmann M., Biskup D.: Lot streaming in a multiple product permutation flow shop with intermingling. Int. J. Prod. Res. 46(1), 197–216 (2008)
    • (2008) Int. J. Prod. Res , vol.46 , Issue.1 , pp. 197-216
    • Feldmann, M.1    Biskup, D.2
  • 18
    • 0013356811 scopus 로고    scopus 로고
    • A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots
    • Kalir A.A., Sarin S.C.: A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots. Omega 29(6), 577–584 (2001)
    • (2001) Omega , vol.29 , Issue.6 , pp. 577-584
    • Kalir, A.A.1    Sarin, S.C.2
  • 19
    • 0000994184 scopus 로고
    • A comparative study of lot streaming procedures
    • Baker K.R., Jia D.: A comparative study of lot streaming procedures. Omega 21(5), 561–566 (1993)
    • (1993) Omega , vol.21 , Issue.5 , pp. 561-566
    • Baker, K.R.1    Jia, D.2
  • 20
    • 33644634541 scopus 로고    scopus 로고
    • Lot streaming with variable sublots: an integer programming formulation
    • Biskup D., Feldmann M.: Lot streaming with variable sublots: an integer programming formulation. J. Oper. Res. Soc. 57(3), 296–303 (2005)
    • (2005) J. Oper. Res. Soc , vol.57 , Issue.3 , pp. 296-303
    • Biskup, D.1    Feldmann, M.2
  • 21
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch D., Trietsch D., Trietsch D.: Basic techniques for lot streaming. Oper. Res. 41(6), 1065–1076 (1993)
    • (1993) Oper. Res , vol.41 , Issue.6 , pp. 1065-1076
    • Trietsch, D.1    Baker2    K.R3
  • 22
    • 2642565955 scopus 로고    scopus 로고
    • Lot streaming models with a limited number of capacitated transporters in multistage batch production systems
    • Chiu H., Chang J., Lee C.: Lot streaming models with a limited number of capacitated transporters in multistage batch production systems. Comput. Oper. Res. 31(12), 2003–2020 (2004)
    • (2004) Comput. Oper. Res , vol.31 , Issue.12 , pp. 2003-2020
    • Chiu, H.1    Chang, J.2    Lee, C.3
  • 23
    • 27744497229 scopus 로고    scopus 로고
    • A comprehensive review of lot streaming
    • Chang J.H., Chiu H.N.: A comprehensive review of lot streaming. Int. J. Prod. Res. 43(8), 1515–1536 (2005)
    • (2005) Int. J. Prod. Res , vol.43 , Issue.8 , pp. 1515-1536
    • Chang, J.H.1    Chiu, H.N.2
  • 24
    • 79951828643 scopus 로고    scopus 로고
    • Lot streaming multiple jobs in a flow shop
    • Glass C.A., Possani E.: Lot streaming multiple jobs in a flow shop. Int. J. Prod. Res. 49(9), 2669–2681 (2011)
    • (2011) Int. J. Prod. Res , vol.49 , Issue.9 , pp. 2669-2681
    • Glass, C.A.1    Possani, E.2
  • 25
    • 74549175886 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for flowshop lot streaming with setups and variable sublots
    • Defersha F.M., Chen M.: A hybrid genetic algorithm for flowshop lot streaming with setups and variable sublots. Int. J. Prod. Res. 48(6), 1705–1726 (2010)
    • (2010) Int. J. Prod. Res , vol.48 , Issue.6 , pp. 1705-1726
    • Defersha, F.M.1    Chen, M.2
  • 26
    • 84865353852 scopus 로고    scopus 로고
    • Mathematical model and parallel genetic algorithm for hybrid flexible flowshop lot streaming problem
    • Defersha F.M., Chen M.: Mathematical model and parallel genetic algorithm for hybrid flexible flowshop lot streaming problem. Int. J. Adv. Manuf. Technol. 62(1–4), 249–265 (2012)
    • (2012) Int. J. Adv. Manuf. Technol , vol.62 , Issue.1-4 , pp. 249-265
    • Defersha, F.M.1    Chen, M.2
  • 27
    • 84876449087 scopus 로고    scopus 로고
    • Earliness and tardiness minimizing on a realistic hybrid flowshop scheduling with learning effect by advanced metaheuristic
    • Behnamian J., Zandieh M.: Earliness and tardiness minimizing on a realistic hybrid flowshop scheduling with learning effect by advanced metaheuristic. Arab. J. Sci. Eng. 38(5), 1229–1242 (2013)
    • (2013) Arab. J. Sci. Eng , vol.38 , Issue.5 , pp. 1229-1242
    • Behnamian, J.1    Zandieh, M.2
  • 28
    • 84880726978 scopus 로고    scopus 로고
    • Scheduling a bi-objective hybrid flow shop with sequence-dependent family setup times using metaheuristics
    • Fadaei M., Zandieh M.: Scheduling a bi-objective hybrid flow shop with sequence-dependent family setup times using metaheuristics. Arab. J. Sci. Eng. 38(8), 2233–2244 (2013)
    • (2013) Arab. J. Sci. Eng , vol.38 , Issue.8 , pp. 2233-2244
    • Fadaei, M.1    Zandieh, M.2
  • 29
    • 3543079267 scopus 로고    scopus 로고
    • Scheduling and lot streaming in flowshops with no-wait in process
    • Hall N.G., Laporte G., Selvarajah E., Sriskandarajah C.: Scheduling and lot streaming in flowshops with no-wait in process. J. Sched. 6(4), 339–354 (2003)
    • (2003) J. Sched , vol.6 , Issue.4 , pp. 339-354
    • Hall, N.G.1    Laporte, G.2    Selvarajah, E.3    Sriskandarajah, C.4
  • 30
    • 70349267951 scopus 로고    scopus 로고
    • Flow shop scheduling with no-wait flexible lot streaming using an adaptive genetic algorithm
    • Kim K., Jeong I.: Flow shop scheduling with no-wait flexible lot streaming using an adaptive genetic algorithm. Int. J. Adv. Manuf. Technol. 44(11–12), 1181–1190 (2009)
    • (2009) Int. J. Adv. Manuf. Technol , vol.44 , Issue.11-12 , pp. 1181-1190
    • Kim, K.1    Jeong, I.2
  • 31
    • 34948883349 scopus 로고    scopus 로고
    • Evolutionary algorithms for scheduling m−1 machine flow shop with lot streaming
    • Marimuthu S., Ponnambalam S., Jawahar N.: Evolutionary algorithms for scheduling m−1 machine flow shop with lot streaming. Robot. Comput. Integr. Manuf. 24(1), 125–139 (2008)
    • (2008) Robot. Comput. Integr. Manuf , vol.24 , Issue.1 , pp. 125-139
    • Marimuthu, S.1    Ponnambalam, S.2    Jawahar, N.3
  • 32
    • 44849088760 scopus 로고    scopus 로고
    • A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming
    • Martin C.H.: A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. Omega 37(1), 126–137 (2009)
    • (2009) Omega , vol.37 , Issue.1 , pp. 126-137
    • Martin, C.H.1
  • 33
    • 84895920480 scopus 로고    scopus 로고
    • Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint
    • Nejati M., Mahdavi I., Hassanzadeh R., Mahdavi-Amiri N., Mojarad M.: Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint. Int. J. Adv. Manuf. Technol. 70(1–4), 501–514 (2014)
    • (2014) Int. J. Adv. Manuf. Technol , vol.70 , Issue.1-4 , pp. 501-514
    • Nejati, M.1    Mahdavi, I.2    Hassanzadeh, R.3    Mahdavi-Amiri, N.4    Mojarad, M.5
  • 34
    • 79953031480 scopus 로고    scopus 로고
    • A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem
    • Pan Q., Fatih Tasgetiren M., Suganthan P.N., Chua T.J.: A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem. Inf. Sci. 181(12), 2455–2468 (2011)
    • (2011) Inf. Sci , vol.181 , Issue.12 , pp. 2455-2468
    • Pan, Q.1    Fatih Tasgetiren, M.2    Suganthan, P.N.3    Chua, T.J.4
  • 35
    • 78650708894 scopus 로고    scopus 로고
    • A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem
    • Pan Q., Suganthan P.N., Liang J.J., Tasgetiren M.F.: A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem. Expert Syst. Appl. 38(4), 3252–3259 (2011)
    • (2011) Expert Syst. Appl , vol.38 , Issue.4 , pp. 3252-3259
    • Pan, Q.1    Suganthan, P.N.2    Liang, J.J.3    Tasgetiren, M.F.4
  • 36
    • 84888643125 scopus 로고    scopus 로고
    • A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers
    • Ventura J.A., Yoon S.: A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers. J. Intell. Manuf. 24(6), 1185–1196 (2013)
    • (2013) J. Intell. Manuf , vol.24 , Issue.6 , pp. 1185-1196
    • Ventura, J.A.1    Yoon, S.2
  • 37
    • 84899645194 scopus 로고    scopus 로고
    • Comparison of improved sheep flock heredity algorithm and artificial bee colony algorithm for lot streaming in m-machine flow shop scheduling
    • Vijaychakaravarthy G., Marimuthu S., Sait A.N.: Comparison of improved sheep flock heredity algorithm and artificial bee colony algorithm for lot streaming in m-machine flow shop scheduling. Arab. J. Sci. Eng. 39(5), 4285–4300 (2014)
    • (2014) Arab. J. Sci. Eng , vol.39 , Issue.5 , pp. 4285-4300
    • Vijaychakaravarthy, G.1    Marimuthu, S.2    Sait, A.N.3
  • 38
    • 84890039340 scopus 로고    scopus 로고
    • Mortezaei, N.; Zulkifli, N.: Integration of lot sizing and flow shop scheduling with lot streaming. J. Appl. Math., Article ID 216595, 9 pages (2013)
    • Mortezaei, N.; Zulkifli, N.: Integration of lot sizing and flow shop scheduling with lot streaming. J. Appl. Math., Article ID 216595, 9 pages. doi:10.1155/2013/216595 (2013)
  • 39
    • 84890556006 scopus 로고    scopus 로고
    • A review of lot streaming
    • Cheng M., Mukherjee N., Sarin S.: A review of lot streaming. Int. J. Prod. Res. 51(23–24), 7023–7046 (2013)
    • (2013) Int. J. Prod. Res , vol.51 , Issue.23-24 , pp. 7023-7046
    • Cheng, M.1    Mukherjee, N.2    Sarin, S.3
  • 40
    • 0034691446 scopus 로고    scopus 로고
    • Lot streaming in multistage production systems
    • Ramasesh R.V., Fu H., Fong D.K., Hayya J.C.: Lot streaming in multistage production systems. Int. J. Prod. Econ. 66(3), 199–211 (2000)
    • (2000) Int. J. Prod. Econ , vol.66 , Issue.3 , pp. 199-211
    • Ramasesh, R.V.1    Fu, H.2    Fong, D.K.3    Hayya, J.C.4
  • 41
    • 0035546054 scopus 로고    scopus 로고
    • An integrated production planning and scheduling system for hybrid flowshop organizations
    • Riane F., Artiba A., Iassinovski S.: An integrated production planning and scheduling system for hybrid flowshop organizations. Int. J. Prod. Econ. 74(1), 33–48 (2001)
    • (2001) Int. J. Prod. Econ , vol.74 , Issue.1 , pp. 33-48
    • Riane, F.1    Artiba, A.2    Iassinovski, S.3
  • 42
    • 84916637615 scopus 로고    scopus 로고
    • Hybrid Taguchi-based particle swarm optimization for flowshop scheduling problem
    • Yang C., Chou J.H, Chang C.K: Hybrid Taguchi-based particle swarm optimization for flowshop scheduling problem. Arab. J. Sci. Eng. 39(3), 2393–2412 (2014)
    • (2014) Arab. J. Sci. Eng , vol.39 , Issue.3 , pp. 2393-2412
    • Yang, C.1    Chou, J.H.2    Chang, C.K.3
  • 43
    • 84893126157 scopus 로고    scopus 로고
    • Single machine scheduling with aging effect and upper-bounded actual processing times
    • Yu X., Yulin Z.: Single machine scheduling with aging effect and upper-bounded actual processing times. Arab. J. Sci. Eng. 39(2), 1489–1495 (2014)
    • (2014) Arab. J. Sci. Eng , vol.39 , Issue.2 , pp. 1489-1495
    • Yu, X.1    Yulin, Z.2
  • 44
    • 84857642720 scopus 로고    scopus 로고
    • A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints
    • Hadda H.: A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints. Optim. Lett. 6(3), 559–569 (2012)
    • (2012) Optim. Lett , vol.6 , Issue.3 , pp. 559-569
    • Hadda, H.1
  • 45
    • 84865623344 scopus 로고    scopus 로고
    • Predicting order due date
    • Berlec T., Starbek M.: Predicting order due date. Arab. J. Sci. Eng. 37(6), 1751–1766 (2012)
    • (2012) Arab. J. Sci. Eng , vol.37 , Issue.6 , pp. 1751-1766
    • Berlec, T.1    Starbek, M.2
  • 46
    • 34249887362 scopus 로고    scopus 로고
    • Complexity of shop-scheduling problems with fixed number of jobs: a survey
    • Brucker P., Sotskov Y.N., Werner F.: Complexity of shop-scheduling problems with fixed number of jobs: a survey. Math. Methods Oper. Res. 65, 461–481 (2007)
    • (2007) Math. Methods Oper. Res , vol.65 , pp. 461-481
    • Brucker, P.1    Sotskov, Y.N.2    Werner, F.3
  • 47
    • 84902836669 scopus 로고    scopus 로고
    • An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations
    • Demir Y., İşleyen S.K.: An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations. Int. J. Prod. Res. 52(13), 3905–3921 (2014)
    • (2014) Int. J. Prod. Res , vol.52 , Issue.13 , pp. 3905-3921
    • Demir, Y.1    İşleyen, S.K.2
  • 48
    • 0024925432 scopus 로고
    • Flow shop scheduling with lot streaming
    • Potts C., Baker K.: Flow shop scheduling with lot streaming. Oper. Res. Lett. 8(6), 297–303 (1989)
    • (1989) Oper. Res. Lett , vol.8 , Issue.6 , pp. 297-303
    • Potts, C.1    Baker, K.2
  • 49
    • 84903533445 scopus 로고    scopus 로고
    • Lot streaming and preventive maintenance in a multiple product permutation flow shop with intermingling
    • Mortezaei N., Zulkifli N., Hong T.S, Yusuff R.M: Lot streaming and preventive maintenance in a multiple product permutation flow shop with intermingling. Appl. Mech. Mater. 564(2014), 689–693 (2014)
    • (2014) Appl. Mech. Mater , vol.564 , Issue.2014 , pp. 689-693
    • Mortezaei, N.1    Zulkifli, N.2    Hong, T.S.3    Yusuff, R.M.4
  • 50
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • Allahverdi A., Ng C., Cheng T., Kovalyov M.: A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 187(3), 985–1032 (2008)
    • (2008) Eur. J. Oper. Res , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.2    Cheng, T.3    Kovalyov, M.4
  • 51
    • 84887298155 scopus 로고    scopus 로고
    • Development of both the AIS and PSO for solving the flexible job shop scheduling problem
    • Sadrzadeh A.: Development of both the AIS and PSO for solving the flexible job shop scheduling problem. Arab. J. Sci. Eng. 38(12), 3593–3604 (2013)
    • (2013) Arab. J. Sci. Eng , vol.38 , Issue.12 , pp. 3593-3604
    • Sadrzadeh, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.