메뉴 건너뛰기




Volumn 52, Issue 13, 2014, Pages 3905-3921

An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations

Author keywords

Flexible job shop scheduling; Genetic algorithm; Mathematical modeling; Overlapping

Indexed keywords

ALGORITHMS; GENETIC ALGORITHMS; MATHEMATICAL MODELS;

EID: 84902836669     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.889328     Document Type: Conference Paper
Times cited : (83)

References (44)
  • 1
    • 13444283517 scopus 로고    scopus 로고
    • A heuristic to schedule flexible job-shop in a glass factory
    • DOI 10.1016/j.ejor.2004.04.020, PII S0377221704002589, Project Management and Scheduling
    • Alvarez-Valdes, R., A. Fuertes, J. M. Tamarit, G. Giménez, and R. Ramos. 2005. "A Heuristic to Schedule Flexible Job-shop in a Glass Factory." European Journal of Operational Research 165: 525-534. (Pubitemid 40206380)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 525-534
    • Alvarez-Valdes, R.1    Fuertes, A.2    Tamarit, J.M.3    Gimenez, G.4    Ramos, R.5
  • 2
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • Baker, K. R. 1995. "Lot Streaming in the Two-machine Flow Shop with Setup times." Annals of Operations Research 57: 1-11.
    • (1995) Annals of Operations Research , vol.57 , pp. 1-11
    • Baker, K.R.1
  • 4
    • 33644634541 scopus 로고    scopus 로고
    • Lot streaming with variable sublots: An integer programming formulation
    • Biskup, D., and M. Feldmann. 2006. "Lot Streaming with Variable Sublots: An Integer Programming Formulation." Journal of Operational Research Society 57: 296-303.
    • (2006) Journal of Operational Research Society , vol.57 , pp. 296-303
    • Biskup, D.1    Feldmann, M.2
  • 6
    • 0032262156 scopus 로고    scopus 로고
    • Lot streaming with attached setups in three-machine flow shops
    • Chen, J., and G. Steiner. 1998. "Lot Streaming with Attached Setups in Three-machine Flow Shops." IIE Transactions 30: 1075-1084.
    • (1998) IIE Transactions , vol.30 , pp. 1075-1084
    • Chen, J.1    Steiner, G.2
  • 7
    • 0037322968 scopus 로고    scopus 로고
    • On discrete lot streaming in no-wait flow shops
    • Chen, J., and G. Steiner. 2003. "On Discrete Lot Streaming in No-wait Flow Shops." IIE Transactions 35: 91-101.
    • (2003) IIE Transactions , vol.35 , pp. 91-101
    • Chen, J.1    Steiner, G.2
  • 9
    • 69249206751 scopus 로고    scopus 로고
    • An improved genetic algorithm for the distributed and flexible job-shop scheduling problem
    • De Giovanni, L., and F. Pezzella. 2010. "An Improved Genetic Algorithm for the Distributed and Flexible Job-shop Scheduling Problem." European Journal of Operational Research 200: 395-408.
    • (2010) European Journal of Operational Research , vol.200 , pp. 395-408
    • De Giovanni, L.1    Pezzella, F.2
  • 11
    • 84155179216 scopus 로고    scopus 로고
    • Considering the flexibility and overlapping in operation in job shop scheduling based on meta-heuristic algorithms
    • Farugi, H., Y. Y. Babak, S. Hiresh, Z. Fyagh, and N. Foruzan. 2011. "Considering the Flexibility and Overlapping in Operation in Job Shop Scheduling Based on Meta-heuristic Algorithms." Australian Journal of Basic and Applied Sciences 5 (11): 526-533.
    • (2011) Australian Journal of Basic and Applied Sciences , vol.5 , Issue.11 , pp. 526-533
    • Farugi, H.1    Babak, Y.Y.2    Hiresh, S.3    Fyagh, Z.4    Foruzan, N.5
  • 12
    • 77950629301 scopus 로고    scopus 로고
    • Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability
    • Fattahi, P., and A. Fallahi. 2010. "Dynamic Scheduling in Flexible Job Shop Systems by Considering Simultaneously Efficiency and Stability." CIRP Journal of Manufacturing Science and Technology 2: 114-123.
    • (2010) CIRP Journal of Manufacturing Science and Technology , vol.2 , pp. 114-123
    • Fattahi, P.1    Fallahi, A.2
  • 13
    • 61449237375 scopus 로고    scopus 로고
    • Flexible job shop scheduling with overlapping in operations
    • Fattahi, P., F. Jolai, and J. Arkat. 2009. "Flexible Job Shop Scheduling with Overlapping in Operations." Applied Mathematical Modelling 33: 3076-3087.
    • (2009) Applied Mathematical Modelling , vol.33 , pp. 3076-3087
    • Fattahi, P.1    Jolai, F.2    Arkat, J.3
  • 14
    • 79957854147 scopus 로고    scopus 로고
    • Discussion paper No 542, Department of Business Administration and Economics Bielefeld University Germany
    • Feldmann, M., and D. Biskup. 2005. "On Lot Streaming with Multiple Products." Discussion paper, No. 542, Department of Business Administration and Economics, Bielefeld University, Germany.
    • (2005) On Lot Streaming with Multiple Products
    • Feldmann, M.1    Biskup, D.2
  • 16
    • 33747682830 scopus 로고    scopus 로고
    • Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
    • Englewood Cliffs, NJ: Prentice-Hall. Gao, J., M. Gen, and L. Sun. 2006. "Scheduling Jobs and Maintenances in Flexible Job Shop with a Hybrid Genetic Algorithm." Journal of Intelligent Manufacturing 17: 493-507.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 493-507
    • Gao, J.1    Gen, M.2    Sun, L.3
  • 17
    • 38749142590 scopus 로고    scopus 로고
    • A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
    • DOI 10.1016/j.cor.2007.01.001, PII S0305054807000020
    • Gao, J., L. Sun, and M. Gen. 2008. "A Hybrid Genetic and Variable Neighborhood Descent Algorithm for Flexible Job Shop Scheduling Problems." Computers & Operations Research 35 (9): 2892-2907. (Pubitemid 351186807)
    • (2008) Computers and Operations Research , vol.35 , Issue.9 , pp. 2892-2907
    • Gao, J.1    Sun, L.2    Gen, M.3
  • 20
    • 62549161373 scopus 로고    scopus 로고
    • Multistage-based genetic algorithm for flexible job-shop scheduling problem
    • Gen, M., J. Gao, and L. Lin. 2009. "Multistage-based Genetic Algorithm for Flexible Job-shop Scheduling Problem." Intelligent and Evolutionary Systems 187: 183-196.
    • (2009) Intelligent and Evolutionary Systems , vol.187 , pp. 183-196
    • Gen, M.1    Gao, J.2    Lin, L.3
  • 23
    • 33751418065 scopus 로고    scopus 로고
    • An effective architecture for learning and evolving flexible job-shop schedules
    • DOI 10.1016/j.ejor.2006.04.007, PII S0377221706002219
    • Ho, N. B., J. C. Tay, and E. M. K. Lai. 2007. "An Effective Architecture for Learning and Evolving Flexible Job-shop Schedules." European Journal of Operational Research 179 (2): 316-333. (Pubitemid 44821629)
    • (2007) European Journal of Operational Research , vol.179 , Issue.2 , pp. 316-333
    • Ho, N.B.1    Tay, J.C.2    Lai, E.M.-K.3
  • 24
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • DOI 10.1109/TSMCC.2002.1009117, PII S1094697702046801
    • Kacem, I., S. Hammadi, and P. Borne. 2002. "Approach by Localization and Multiobjective Evolutionary Optimization for Flexible Job-shop Scheduling Problems." IEEE Transactions on Systems, Man, and Cybernetics, Part C 32 (1): 1-13. (Pubitemid 34789920)
    • (2002) IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews , vol.32 , Issue.1 , pp. 1-13
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 25
    • 84870236915 scopus 로고    scopus 로고
    • A simulated annealing algorithm for multi objective flexible job shop scheduling with overlapping in operations
    • Khalife, M. A., B. Abbasi, and A. H. K. D. Abadi. 2010. "A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations." Journal of Industrial Engineering 5: 17-28.
    • (2010) Journal of Industrial Engineering , vol.5 , pp. 17-28
    • Khalife, M.A.1    Abbasi, B.2    Abadi, A.H.K.D.3
  • 30
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • Moradi, E., S. M. T. Fatemi Ghomi, and M. Zandieh. 2011. "Bi-objective Optimization Research on Integrated Fixed Time Interval Preventive Maintenance and Production for Scheduling Flexible Job-shop Problem." Expert Systems with Applications 38: 7169-7178.
    • (2011) Expert Systems with Applications , vol.38 , pp. 7169-7178
    • Moradi, E.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 31
    • 84880264313 scopus 로고    scopus 로고
    • A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates
    • Nie, L., L. Gao, P. Li, and X. Li. 2013. "A GEP-based Reactive Scheduling Policies Constructing Approach for Dynamic Flexible Job Shop Scheduling Problem with Job Release Dates." Journal of Intelligent Manufacturing 24: 763-774.
    • (2013) Journal of Intelligent Manufacturing , vol.24 , pp. 763-774
    • Nie, L.1    Gao, L.2    Li, P.3    Li, X.4
  • 32
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling problem
    • DOI 10.1016/j.cor.2007.02.014, PII S0305054807000524
    • Pezella, F., G. Morganti, and G. Ciaschetti. 2008. "A Genetic Algorithm for the Flexible Jobshop Scheduling Problem." Computers & Operations Research 5: 3202-3212. (Pubitemid 351335142)
    • (2008) Computers and Operations Research , vol.35 , Issue.10 , pp. 3202-3212
    • Pezzella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 34
    • 0024925432 scopus 로고
    • Flow shop scheduling with lot streaming
    • DOI 10.1016/0167-6377(89)90013-8
    • Potts, C. N., and K. R. Baker. 1989. "Flow Shop Scheduling with Lot Streaming." Operations Research Letters 8: 297-303. (Pubitemid 20667535)
    • (1989) Operations Research Letters , vol.8 , Issue.6 , pp. 297-303
    • Potts, C.N.1    Baker, K.R.2
  • 36
    • 0000659781 scopus 로고
    • A system for managing job shop production
    • Reiter, S. 1966. "A System for Managing Job Shop Production." Journal of Business 34: 371-393.
    • (1966) Journal of Business , vol.34 , pp. 371-393
    • Reiter, S.1
  • 38
    • 19944366600 scopus 로고    scopus 로고
    • The common cycle economic lot scheduling in flexible job shops: The finite horizon case
    • DOI 10.1016/j.ijpe.2004.05.005, PII S0925527304002208
    • Torabi, S. A., B. Karimi, and S. M. T. Fatemi Ghomi. 2005. "The Common Cycle Economic Lot Scheduling in Flexible Job Shops: The Finite Horizon Case." International Journal of Production Economics 97: 52-65. (Pubitemid 40749332)
    • (2005) International Journal of Production Economics , vol.97 , Issue.1 , pp. 52-65
    • Torabi, S.A.1    Karimi, B.2    Fatemi Ghomi, S.M.T.3
  • 39
    • 0037448778 scopus 로고    scopus 로고
    • A knowledge based evolutionary strategy for scheduling problems with bottlenecks
    • Varela, R., C. R. Vela, J. Puente, and A. Go'mez. 2003. "A Knowledge Based Evolutionary Strategy for Scheduling Problems with Bottlenecks." European Journal of Operational Research 145 (1): 57-71.
    • (2003) European Journal of Operational Research , vol.145 , Issue.1 , pp. 57-71
    • Varela, R.1    Vela, C.R.2    Puente, J.3    Go'Mez, A.4
  • 40
    • 0026896286 scopus 로고
    • Two- and three-machine flow shop scheduling problems with equal sized transfer batches
    • Vickson, R. G., and B. E. Alfredsson. 1992. "Two- and Three-machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches." International Journal of Production Research 30: 1551-1574.
    • (1992) International Journal of Production Research , vol.30 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2
  • 41
    • 78650179774 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem
    • Wang, X., L. Gao, C. Zhang, and X. Shao. 2010. "A Multi-objective Genetic Algorithm Based on Immune and Entropy Principle for Flexible Job-shop Scheduling Problem." The International Journal of Advanced Manufacturing Technology 51: 757-767.
    • (2010) The International Journal of Advanced Manufacturing Technology , vol.51 , pp. 757-767
    • Wang, X.1    Gao, L.2    Zhang, C.3    Shao, X.4
  • 43
    • 67349174559 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
    • Zhang, G., X. Shao, P. Li, and L. Gao. 2009. "An Effective Hybrid Particle Swarm Optimization Algorithm for Multi-objective Flexible Job-shop Scheduling Problem." Computers & Industrial Engineering 56: 1309-1318.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 1309-1318
    • Zhang, G.1    Shao, X.2    Li, P.3    Gao, L.4
  • 44
    • 78650682362 scopus 로고    scopus 로고
    • An effective genetic algorithm for the flexible job-shop scheduling problem
    • Zhang, G., L. Gao, and Y. Shi. 2011. "An Effective Genetic Algorithm for the Flexible Job-shop Scheduling Problem." Expert Systems with Applications 38: 3563-3573.
    • (2011) Expert Systems with Applications , vol.38 , pp. 3563-3573
    • Zhang, G.1    Gao, L.2    Shi, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.