-
1
-
-
13444283517
-
A heuristic to schedule flexible job-shop in a glass factory
-
DOI 10.1016/j.ejor.2004.04.020, PII S0377221704002589, Project Management and Scheduling
-
Alvarez-Valdes, R., A. Fuertes, J. M. Tamarit, G. Giménez, and R. Ramos. 2005. "A Heuristic to Schedule Flexible Job-shop in a Glass Factory." European Journal of Operational Research 165: 525-534. (Pubitemid 40206380)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 525-534
-
-
Alvarez-Valdes, R.1
Fuertes, A.2
Tamarit, J.M.3
Gimenez, G.4
Ramos, R.5
-
2
-
-
21844508729
-
Lot streaming in the two-machine flow shop with setup times
-
Baker, K. R. 1995. "Lot Streaming in the Two-machine Flow Shop with Setup times." Annals of Operations Research 57: 1-11.
-
(1995)
Annals of Operations Research
, vol.57
, pp. 1-11
-
-
Baker, K.R.1
-
3
-
-
0037696818
-
Flexible job shop scheduling by tabu search
-
The University of Texas, Austin, TX, Technical Report Series: ORP96-09
-
Barnes, J. W., and J. B. Chambers. 1996. "Flexible Job Shop Scheduling by Tabu Search." Graduate Program in Operations Research and Industrial Engineering, The University of Texas, Austin, TX, Technical Report Series: ORP96-09.
-
(1996)
Graduate Program in Operations Research and Industrial Engineering
-
-
Barnes, J.W.1
Chambers, J.B.2
-
4
-
-
33644634541
-
Lot streaming with variable sublots: An integer programming formulation
-
Biskup, D., and M. Feldmann. 2006. "Lot Streaming with Variable Sublots: An Integer Programming Formulation." Journal of Operational Research Society 57: 296-303.
-
(2006)
Journal of Operational Research Society
, vol.57
, pp. 296-303
-
-
Biskup, D.1
Feldmann, M.2
-
6
-
-
0032262156
-
Lot streaming with attached setups in three-machine flow shops
-
Chen, J., and G. Steiner. 1998. "Lot Streaming with Attached Setups in Three-machine Flow Shops." IIE Transactions 30: 1075-1084.
-
(1998)
IIE Transactions
, vol.30
, pp. 1075-1084
-
-
Chen, J.1
Steiner, G.2
-
7
-
-
0037322968
-
On discrete lot streaming in no-wait flow shops
-
Chen, J., and G. Steiner. 2003. "On Discrete Lot Streaming in No-wait Flow Shops." IIE Transactions 35: 91-101.
-
(2003)
IIE Transactions
, vol.35
, pp. 91-101
-
-
Chen, J.1
Steiner, G.2
-
8
-
-
0032632032
-
A genetic algorithm for flexible job-shop scheduling
-
May Detroit, MI
-
Chen, H., J. Ihlow, and C. Lehmann, May 1999. "A Genetic Algorithm for Flexible Job-shop Scheduling." Proceedings of the 1999 IEEE International Conference on Robotics & Automation, Detroit, MI.
-
(1999)
Proceedings of the 1999 IEEE International Conference on Robotics & Automation
-
-
Chen, H.1
Ihlow, J.2
Lehmann, C.3
-
9
-
-
69249206751
-
An improved genetic algorithm for the distributed and flexible job-shop scheduling problem
-
De Giovanni, L., and F. Pezzella. 2010. "An Improved Genetic Algorithm for the Distributed and Flexible Job-shop Scheduling Problem." European Journal of Operational Research 200: 395-408.
-
(2010)
European Journal of Operational Research
, vol.200
, pp. 395-408
-
-
De Giovanni, L.1
Pezzella, F.2
-
11
-
-
84155179216
-
Considering the flexibility and overlapping in operation in job shop scheduling based on meta-heuristic algorithms
-
Farugi, H., Y. Y. Babak, S. Hiresh, Z. Fyagh, and N. Foruzan. 2011. "Considering the Flexibility and Overlapping in Operation in Job Shop Scheduling Based on Meta-heuristic Algorithms." Australian Journal of Basic and Applied Sciences 5 (11): 526-533.
-
(2011)
Australian Journal of Basic and Applied Sciences
, vol.5
, Issue.11
, pp. 526-533
-
-
Farugi, H.1
Babak, Y.Y.2
Hiresh, S.3
Fyagh, Z.4
Foruzan, N.5
-
12
-
-
77950629301
-
Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability
-
Fattahi, P., and A. Fallahi. 2010. "Dynamic Scheduling in Flexible Job Shop Systems by Considering Simultaneously Efficiency and Stability." CIRP Journal of Manufacturing Science and Technology 2: 114-123.
-
(2010)
CIRP Journal of Manufacturing Science and Technology
, vol.2
, pp. 114-123
-
-
Fattahi, P.1
Fallahi, A.2
-
13
-
-
61449237375
-
Flexible job shop scheduling with overlapping in operations
-
Fattahi, P., F. Jolai, and J. Arkat. 2009. "Flexible Job Shop Scheduling with Overlapping in Operations." Applied Mathematical Modelling 33: 3076-3087.
-
(2009)
Applied Mathematical Modelling
, vol.33
, pp. 3076-3087
-
-
Fattahi, P.1
Jolai, F.2
Arkat, J.3
-
14
-
-
79957854147
-
-
Discussion paper No 542, Department of Business Administration and Economics Bielefeld University Germany
-
Feldmann, M., and D. Biskup. 2005. "On Lot Streaming with Multiple Products." Discussion paper, No. 542, Department of Business Administration and Economics, Bielefeld University, Germany.
-
(2005)
On Lot Streaming with Multiple Products
-
-
Feldmann, M.1
Biskup, D.2
-
16
-
-
33747682830
-
Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
-
Englewood Cliffs, NJ: Prentice-Hall. Gao, J., M. Gen, and L. Sun. 2006. "Scheduling Jobs and Maintenances in Flexible Job Shop with a Hybrid Genetic Algorithm." Journal of Intelligent Manufacturing 17: 493-507.
-
(2006)
Journal of Intelligent Manufacturing
, vol.17
, pp. 493-507
-
-
Gao, J.1
Gen, M.2
Sun, L.3
-
17
-
-
38749142590
-
A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
-
DOI 10.1016/j.cor.2007.01.001, PII S0305054807000020
-
Gao, J., L. Sun, and M. Gen. 2008. "A Hybrid Genetic and Variable Neighborhood Descent Algorithm for Flexible Job Shop Scheduling Problems." Computers & Operations Research 35 (9): 2892-2907. (Pubitemid 351186807)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.9
, pp. 2892-2907
-
-
Gao, J.1
Sun, L.2
Gen, M.3
-
20
-
-
62549161373
-
Multistage-based genetic algorithm for flexible job-shop scheduling problem
-
Gen, M., J. Gao, and L. Lin. 2009. "Multistage-based Genetic Algorithm for Flexible Job-shop Scheduling Problem." Intelligent and Evolutionary Systems 187: 183-196.
-
(2009)
Intelligent and Evolutionary Systems
, vol.187
, pp. 183-196
-
-
Gen, M.1
Gao, J.2
Lin, L.3
-
23
-
-
33751418065
-
An effective architecture for learning and evolving flexible job-shop schedules
-
DOI 10.1016/j.ejor.2006.04.007, PII S0377221706002219
-
Ho, N. B., J. C. Tay, and E. M. K. Lai. 2007. "An Effective Architecture for Learning and Evolving Flexible Job-shop Schedules." European Journal of Operational Research 179 (2): 316-333. (Pubitemid 44821629)
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.2
, pp. 316-333
-
-
Ho, N.B.1
Tay, J.C.2
Lai, E.M.-K.3
-
24
-
-
0036464279
-
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
-
DOI 10.1109/TSMCC.2002.1009117, PII S1094697702046801
-
Kacem, I., S. Hammadi, and P. Borne. 2002. "Approach by Localization and Multiobjective Evolutionary Optimization for Flexible Job-shop Scheduling Problems." IEEE Transactions on Systems, Man, and Cybernetics, Part C 32 (1): 1-13. (Pubitemid 34789920)
-
(2002)
IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews
, vol.32
, Issue.1
, pp. 1-13
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
25
-
-
84870236915
-
A simulated annealing algorithm for multi objective flexible job shop scheduling with overlapping in operations
-
Khalife, M. A., B. Abbasi, and A. H. K. D. Abadi. 2010. "A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations." Journal of Industrial Engineering 5: 17-28.
-
(2010)
Journal of Industrial Engineering
, vol.5
, pp. 17-28
-
-
Khalife, M.A.1
Abbasi, B.2
Abadi, A.H.K.D.3
-
30
-
-
79951579853
-
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
-
Moradi, E., S. M. T. Fatemi Ghomi, and M. Zandieh. 2011. "Bi-objective Optimization Research on Integrated Fixed Time Interval Preventive Maintenance and Production for Scheduling Flexible Job-shop Problem." Expert Systems with Applications 38: 7169-7178.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 7169-7178
-
-
Moradi, E.1
Fatemi Ghomi, S.M.T.2
Zandieh, M.3
-
31
-
-
84880264313
-
A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates
-
Nie, L., L. Gao, P. Li, and X. Li. 2013. "A GEP-based Reactive Scheduling Policies Constructing Approach for Dynamic Flexible Job Shop Scheduling Problem with Job Release Dates." Journal of Intelligent Manufacturing 24: 763-774.
-
(2013)
Journal of Intelligent Manufacturing
, vol.24
, pp. 763-774
-
-
Nie, L.1
Gao, L.2
Li, P.3
Li, X.4
-
32
-
-
40249118429
-
A genetic algorithm for the flexible job-shop scheduling problem
-
DOI 10.1016/j.cor.2007.02.014, PII S0305054807000524
-
Pezella, F., G. Morganti, and G. Ciaschetti. 2008. "A Genetic Algorithm for the Flexible Jobshop Scheduling Problem." Computers & Operations Research 5: 3202-3212. (Pubitemid 351335142)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.10
, pp. 3202-3212
-
-
Pezzella, F.1
Morganti, G.2
Ciaschetti, G.3
-
34
-
-
0024925432
-
Flow shop scheduling with lot streaming
-
DOI 10.1016/0167-6377(89)90013-8
-
Potts, C. N., and K. R. Baker. 1989. "Flow Shop Scheduling with Lot Streaming." Operations Research Letters 8: 297-303. (Pubitemid 20667535)
-
(1989)
Operations Research Letters
, vol.8
, Issue.6
, pp. 297-303
-
-
Potts, C.N.1
Baker, K.R.2
-
36
-
-
0000659781
-
A system for managing job shop production
-
Reiter, S. 1966. "A System for Managing Job Shop Production." Journal of Business 34: 371-393.
-
(1966)
Journal of Business
, vol.34
, pp. 371-393
-
-
Reiter, S.1
-
38
-
-
19944366600
-
The common cycle economic lot scheduling in flexible job shops: The finite horizon case
-
DOI 10.1016/j.ijpe.2004.05.005, PII S0925527304002208
-
Torabi, S. A., B. Karimi, and S. M. T. Fatemi Ghomi. 2005. "The Common Cycle Economic Lot Scheduling in Flexible Job Shops: The Finite Horizon Case." International Journal of Production Economics 97: 52-65. (Pubitemid 40749332)
-
(2005)
International Journal of Production Economics
, vol.97
, Issue.1
, pp. 52-65
-
-
Torabi, S.A.1
Karimi, B.2
Fatemi Ghomi, S.M.T.3
-
39
-
-
0037448778
-
A knowledge based evolutionary strategy for scheduling problems with bottlenecks
-
Varela, R., C. R. Vela, J. Puente, and A. Go'mez. 2003. "A Knowledge Based Evolutionary Strategy for Scheduling Problems with Bottlenecks." European Journal of Operational Research 145 (1): 57-71.
-
(2003)
European Journal of Operational Research
, vol.145
, Issue.1
, pp. 57-71
-
-
Varela, R.1
Vela, C.R.2
Puente, J.3
Go'Mez, A.4
-
40
-
-
0026896286
-
Two- and three-machine flow shop scheduling problems with equal sized transfer batches
-
Vickson, R. G., and B. E. Alfredsson. 1992. "Two- and Three-machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches." International Journal of Production Research 30: 1551-1574.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1551-1574
-
-
Vickson, R.G.1
Alfredsson, B.E.2
-
41
-
-
78650179774
-
A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem
-
Wang, X., L. Gao, C. Zhang, and X. Shao. 2010. "A Multi-objective Genetic Algorithm Based on Immune and Entropy Principle for Flexible Job-shop Scheduling Problem." The International Journal of Advanced Manufacturing Technology 51: 757-767.
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.51
, pp. 757-767
-
-
Wang, X.1
Gao, L.2
Zhang, C.3
Shao, X.4
-
43
-
-
67349174559
-
An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
-
Zhang, G., X. Shao, P. Li, and L. Gao. 2009. "An Effective Hybrid Particle Swarm Optimization Algorithm for Multi-objective Flexible Job-shop Scheduling Problem." Computers & Industrial Engineering 56: 1309-1318.
-
(2009)
Computers & Industrial Engineering
, vol.56
, pp. 1309-1318
-
-
Zhang, G.1
Shao, X.2
Li, P.3
Gao, L.4
-
44
-
-
78650682362
-
An effective genetic algorithm for the flexible job-shop scheduling problem
-
Zhang, G., L. Gao, and Y. Shi. 2011. "An Effective Genetic Algorithm for the Flexible Job-shop Scheduling Problem." Expert Systems with Applications 38: 3563-3573.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 3563-3573
-
-
Zhang, G.1
Gao, L.2
Shi, Y.3
|