-
2
-
-
0035546217
-
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
-
C. Artigues, and F. Roubellat A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times Int. J. Prod. Econ. 7 2001 63 75
-
(2001)
Int. J. Prod. Econ.
, vol.7
, pp. 63-75
-
-
Artigues, C.1
Roubellat, F.2
-
3
-
-
0031997369
-
Guided local search with shifting bottleneck for job shop scheduling
-
E. Balas, and A. Vazacopoulos Guided local search with shifting bottleneck for job shop scheduling Manag. Sci. 44 1998 262 275
-
(1998)
Manag. Sci.
, vol.44
, pp. 262-275
-
-
Balas, E.1
Vazacopoulos, A.2
-
4
-
-
0030212629
-
The job shop scheduling problem: Conventional and new solution techniques
-
J. Blazewicz, W. Domschke, and E. Pesch The job shop scheduling problem: conventional and new solution techniques Eur. J. Oper. Res. 93 1996 1 33
-
(1996)
Eur. J. Oper. Res.
, vol.93
, pp. 1-33
-
-
Blazewicz, J.1
Domschke, W.2
Pesch, E.3
-
5
-
-
18744404504
-
An ant colony optimization algorithm for shop scheduling problem
-
C. Blum, and M. Sampels An ant colony optimization algorithm for shop scheduling problem J. Math. Model. Algorithms 3 2004 285 308
-
(2004)
J. Math. Model. Algorithms
, vol.3
, pp. 285-308
-
-
Blum, C.1
Sampels, M.2
-
6
-
-
0034612523
-
Inspiration for optimization from social insect behavior
-
E. Bonabeau, M. Dorigo, and G. Theraulaz Inspiration for optimization from social insect behavior Nature 406 2000 39 42
-
(2000)
Nature
, vol.406
, pp. 39-42
-
-
Bonabeau, E.1
Dorigo, M.2
Theraulaz, G.3
-
7
-
-
0025531716
-
Job-shop scheduling with multi-purpose machines
-
P. Brucker, and R. Schlie Job-shop scheduling with multi-purpose machines Computing 45 1990 369 375
-
(1990)
Computing
, vol.45
, pp. 369-375
-
-
Brucker, P.1
Schlie, R.2
-
8
-
-
0001343733
-
A branch & bound method for the general-shop problem with sequence dependent setup-times
-
P. Brucker, and O. Thiele A branch & bound method for the general-shop problem with sequence dependent setup-times Oper. Res. Spektrum 18 1996 145 161
-
(1996)
Oper. Res. Spektrum
, vol.18
, pp. 145-161
-
-
Brucker, P.1
Thiele, O.2
-
9
-
-
33646400835
-
Flexible job-shop scheduling problem under resource constraints
-
F.T.S. Chan, T.C. Wong, and L.Y Chan Flexible job-shop scheduling problem under resource constraints Int. J. Prod. Res. 44 11 2006 2071 2089
-
(2006)
Int. J. Prod. Res.
, vol.44
, Issue.11
, pp. 2071-2089
-
-
Chan, F.T.S.1
Wong, T.C.2
Chan, L.Y.3
-
11
-
-
0042261208
-
An integrated approach for modelling and solving the general multiprocessor job-shop scheduling problem using tabu search
-
S. Dauzère-Pérès, and J. Paulli An integrated approach for modelling and solving the general multiprocessor job-shop scheduling problem using tabu search Ann. Oper. Res. 70 1997 281 306
-
(1997)
Ann. Oper. Res.
, vol.70
, pp. 281-306
-
-
Dauzère-Pérès, S.1
Paulli, J.2
-
12
-
-
0032094795
-
Multi-resource shop scheduling with resource flexibility
-
S. Dauzère-Pérès, W. Roux, and J.B. Lasserre Multi-resource shop scheduling with resource flexibility Eur. J. Oper. Res. 107 1998 289 305
-
(1998)
Eur. J. Oper. Res.
, vol.107
, pp. 289-305
-
-
Dauzère-Pérès, S.1
Roux, W.2
Lasserre, J.B.3
-
13
-
-
0002992032
-
Using genetic algorithm to solve NP-complete problems
-
Morgan Kaufmann, San Mateo, CA
-
De Jong, K.A.; Spears, W.M.; 1995. Using genetic algorithm to solve NP-complete problems. In: Proceedings of the Third International Conference on Genetic Algorithms, Morgan Kaufmann, San Mateo, CA, pp. 124-132.
-
(1995)
Proceedings of the Third International Conference on Genetic Algorithms
, pp. 124-132
-
-
De Jong K., .A.1
Spears W., .M.2
-
14
-
-
0031122887
-
Ant colony system: A cooperative learning approach to the traveling salesman problem
-
M. Dorigo, and L.M. Gambardella Ant colony system: a cooperative learning approach to the traveling salesman problem IEEE Trans. Evolut. Comput. 1 1997 53 66
-
(1997)
IEEE Trans. Evolut. Comput.
, vol.1
, pp. 53-66
-
-
Dorigo, M.1
Gambardella, L.M.2
-
15
-
-
0016952078
-
The complexity of the flowshop and jobshop scheduling
-
M.R. Garey, D.S. Johnson, and R. Sethi The complexity of the flowshop and jobshop scheduling Math. Oper. Res. 1 1976 117 129
-
(1976)
Math. Oper. Res.
, vol.1
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
16
-
-
0000131281
-
Algorithms for solving production scheduling problems
-
D. Giffler, and G.L. Thompson Algorithms for solving production scheduling problems Oper. Res. 8 1960 487 503
-
(1960)
Oper. Res.
, vol.8
, pp. 487-503
-
-
Giffler, D.1
Thompson, G.L.2
-
18
-
-
0000062615
-
Tabu search for the job shop scheduling problem with multi-purpose machine
-
J. Hurink, B. Jurisch, and M. Thole Tabu search for the job shop scheduling problem with multi-purpose machine Oper. Res. Spektrum 15 1994 205 215
-
(1994)
Oper. Res. Spektrum
, vol.15
, pp. 205-215
-
-
Hurink, J.1
Jurisch, B.2
Thole, M.3
-
19
-
-
8344272087
-
Tabu search algorithms for job-shop problems with a single transport robot
-
J. Hurink, and S. Knust Tabu search algorithms for job-shop problems with a single transport robot Eur. J. Oper. Res. 162 2005 99 111
-
(2005)
Eur. J. Oper. Res.
, vol.162
, pp. 99-111
-
-
Hurink, J.1
Knust, S.2
-
20
-
-
0030121742
-
Extending the shifting bottleneck procedure to real-life applications
-
P. Ivens, and M. Lambrecht Extending the shifting bottleneck procedure to real-life applications Eur. J. Oper. Res. 90 1996 252 268
-
(1996)
Eur. J. Oper. Res.
, vol.90
, pp. 252-268
-
-
Ivens, P.1
Lambrecht, M.2
-
21
-
-
0033102020
-
Deterministic job shop scheduling; Past, present and future
-
A.S. Jain, and S. Meeran Deterministic job shop scheduling; past, present and future Eur. J. Oper. Res. 113 1999 390 434
-
(1999)
Eur. J. Oper. Res.
, vol.113
, pp. 390-434
-
-
Jain, A.S.1
Meeran, S.2
-
22
-
-
0036464279
-
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
-
I. Kacem, S. Hammadi, and P. Borne Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems IEEE Trans. Syst. Man Cybern.; Part C 32 2002 1 13
-
(2002)
IEEE Trans. Syst. Man Cybern.; Part C
, vol.32
, pp. 1-13
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
23
-
-
0242493312
-
Scheduling of flexible manufacturing system: An ant colony optimization approach
-
R. Kumar, M.K. Tiwari, and R. Shankar Scheduling of flexible manufacturing system: an ant colony optimization approach J. Eng. Manuf. - Part B 217 2003 1443 1453
-
(2003)
J. Eng. Manuf. - Part B
, vol.217
, pp. 1443-1453
-
-
Kumar, R.1
Tiwari, M.K.2
Shankar, R.3
-
24
-
-
0002577337
-
Effective neighborhood functions for the flexible job shop problem
-
M. Mastrolilli, and L.M. Gambardella Effective neighborhood functions for the flexible job shop problem J. Sched. 3 2000 3 20
-
(2000)
J. Sched.
, vol.3
, pp. 3-20
-
-
Mastrolilli, M.1
Gambardella, L.M.2
-
25
-
-
5244278595
-
A fast taboo search algorithm for the job shop problem
-
E. Nowicki, and C. Smutnicki A fast taboo search algorithm for the job shop problem Manag. Sci. 42 1996 797 813
-
(1996)
Manag. Sci.
, vol.42
, pp. 797-813
-
-
Nowicki, E.1
Smutnicki, C.2
-
26
-
-
0034627942
-
Dynamic scheduling of FMS using a real-time genetic algorithm
-
A. Rossi, and G. Dini Dynamic scheduling of FMS using a real-time genetic algorithm Int. J. Prod. Res. 38 2000 1 20
-
(2000)
Int. J. Prod. Res.
, vol.38
, pp. 1-20
-
-
Rossi, A.1
Dini, G.2
-
27
-
-
33646387285
-
An evolutionary approach to complex job-shop scheduling and flexible manufacturing system scheduling
-
A. Rossi, and G. Dini An evolutionary approach to complex job-shop scheduling and flexible manufacturing system scheduling J. Eng. Manuf. - Part B 215 2001 233 245
-
(2001)
J. Eng. Manuf. - Part B
, vol.215
, pp. 233-245
-
-
Rossi, A.1
Dini, G.2
-
28
-
-
34247624966
-
Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method
-
A. Rossi, and G. Dini Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method Robot. Comput.-Integr. Manuf. 23 2007 503 516
-
(2007)
Robot. Comput.-Integr. Manuf.
, vol.23
, pp. 503-516
-
-
Rossi, A.1
Dini, G.2
-
29
-
-
54249106355
-
A hybrid heuristic to solve the parallel machines job-shop scheduling problem
-
Rossi A. and Boschi E.; A hybrid heuristic to solve the parallel machines job-shop scheduling problem, Adv. Eng. Soft.; 40, 2009, 118-127.
-
(2009)
Adv. Eng. Soft.
, vol.40
, pp. 118-127
-
-
Rossi, A.1
Boschi, E.2
-
31
-
-
0029253721
-
FMS planning decision, operating flexibilities and system performance
-
K.E. Stecke, and N. Raman FMS planning decision, operating flexibilities and system performance IEEE Trans. Eng. Manag. 42 1995 82 90
-
(1995)
IEEE Trans. Eng. Manag.
, vol.42
, pp. 82-90
-
-
Stecke, K.E.1
Raman, N.2
|