-
1
-
-
0036532654
-
MRP performance effects due to forecast bias and demand uncertainty
-
Enns ST (2002). MRP performance effects due to forecast bias and demand uncertainty. Eur J Opl Res 138: 87-102.
-
(2002)
Eur J Opl Res
, vol.138
, pp. 87-102
-
-
Enns, S.T.1
-
2
-
-
0032000895
-
Parameters affecting the effectiveness of MRP systems: A review
-
Yeung JHY, Wong WCK and Ma L (1998). Parameters affecting the effectiveness of MRP systems: a review. Int J Prod Res 36: 313-331.
-
(1998)
Int J Prod Res
, vol.36
, pp. 313-331
-
-
Yeung, J.H.Y.1
Wong, W.C.K.2
Ma, L.3
-
3
-
-
0016572027
-
Manufacturing cycle time determination for a multistage economic production quantity model
-
Szendrovits AZ (1975). Manufacturing cycle time determination for a multistage economic production quantity model. Mngt Sci 22: 298-308.
-
(1975)
Mngt Sci
, vol.22
, pp. 298-308
-
-
Szendrovits, A.Z.1
-
4
-
-
0021481825
-
Multi-stage production with variable lot sizes and transportation of partial lots
-
Drezner Z, Szendrovits AZ and Wesolowsky GO (1984). Multi-stage production with variable lot sizes and transportation of partial lots. Eur J Opl Res 17: 227-237.
-
(1984)
Eur J Opl Res
, vol.17
, pp. 227-237
-
-
Drezner, Z.1
Szendrovits, A.Z.2
Wesolowsky, G.O.3
-
5
-
-
38249043568
-
A constant lot size model with equal and unequal sized batch shipments between production stages
-
Goyal SK and Szendrovits AZ (1986). A constant lot size model with equal and unequal sized batch shipments between production stages. Eng Cost Prod Econ 10: 203-210.
-
(1986)
Eng Cost Prod Econ
, vol.10
, pp. 203-210
-
-
Goyal, S.K.1
Szendrovits, A.Z.2
-
6
-
-
0042418810
-
Optimizing multi-stage production with constant lot size and varying number of unequal sized batches
-
Bogaschewsky RW, Buscher UD and Lindner G (2001). Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. Omega - Int J Mngt S 29: 183-191.
-
(2001)
Omega - Int J Mngt S
, vol.29
, pp. 183-191
-
-
Bogaschewsky, R.W.1
Buscher, U.D.2
Lindner, G.3
-
7
-
-
38249040429
-
Overlapping operations in material requirements planning
-
Graves SC and Kostreva M (1987). Overlapping operations in material requirements planning. J Opl Mngt 6: 283-294.
-
(1987)
J Opl Mngt
, vol.6
, pp. 283-294
-
-
Graves, S.C.1
Kostreva, M.2
-
10
-
-
0033895628
-
Scheduling with batching: A review
-
Potts CN and Kovalyov MY (2000). Scheduling with batching: a review. Eur J Opl Res 120: 228-249.
-
(2000)
Eur J Opl Res
, vol.120
, pp. 228-249
-
-
Potts, C.N.1
Kovalyov, M.Y.2
-
12
-
-
0041003351
-
Effects of lot-splitting under various routing strategies
-
Hancock T (1991). Effects of lot-splitting under various routing strategies. Int J Opns Prod Mngt 11: 68-75.
-
(1991)
Int J Opns Prod Mngt
, vol.11
, pp. 68-75
-
-
Hancock, T.1
-
13
-
-
0025474221
-
A state-of-the-art review of parallel-machine scheduling research
-
Cheng TCE and Sin CCS (1990). A state-of-the-art review of parallel-machine scheduling research. Eur J Opl Res 47: 271-292.
-
(1990)
Eur J Opl Res
, vol.47
, pp. 271-292
-
-
Cheng, T.C.E.1
Sin, C.C.S.2
-
14
-
-
0030500179
-
Lot splitting in stochastic flow shop and job shop environments
-
Smunt TL, Buss AH and Kropp DH (1996). Lot splitting in stochastic flow shop and job shop environments. Decision Sci 27: 215-237.
-
(1996)
Decision Sci
, vol.27
, pp. 215-237
-
-
Smunt, T.L.1
Buss, A.H.2
Kropp, D.H.3
-
15
-
-
0036833214
-
Lot-splitting to minimize average flow time in a two-machine flowshop
-
Bukchin J, Tzur M and Jaffe M (2002). Lot-splitting to minimize average flow time in a two-machine flowshop. IIE Trans 34: 953-970.
-
(2002)
IIE Trans
, vol.34
, pp. 953-970
-
-
Bukchin, J.1
Tzur, M.2
Jaffe, M.3
-
16
-
-
0000659781
-
A system for managing job-shop production
-
Reiter S (1966). A system for managing job-shop production. J Bus 39: 371-393.
-
(1966)
J Bus
, vol.39
, pp. 371-393
-
-
Reiter, S.1
-
17
-
-
0031492360
-
Current trends in deterministic scheduling
-
Lee CY, Lei L and Pinedo M (1997). Current trends in deterministic scheduling. Ann Opns Res 70: 1-41.
-
(1997)
Ann Opns Res
, vol.70
, pp. 1-41
-
-
Lee, C.Y.1
Lei, L.2
Pinedo, M.3
-
18
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A, Gupta JND and Aldowaisan T (1999). A review of scheduling research involving setup considerations. Omega -Int J Mngt S 27: 219-239.
-
(1999)
Omega -Int J Mngt S
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
19
-
-
0020822392
-
The OPT scheduling system: A review of a new production scheduling system
-
Jacobs FR (1983). The OPT scheduling system: a review of a new production scheduling system. Prod Inv Mngt J 24: 47-51.
-
(1983)
Prod Inv Mngt J
, vol.24
, pp. 47-51
-
-
Jacobs, F.R.1
-
20
-
-
84985801774
-
Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing
-
Jacobs FR and Bragg DJ (1988). Repetitive lots: flow-time reductions through sequencing and dynamic batch sizing. Decision Sci 19: 281-294.
-
(1988)
Decision Sci
, vol.19
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
21
-
-
0024925432
-
Flow shop scheduling with lot streaming
-
Potts CN and Baker KR (1989). Flow shop scheduling with lot streaming. Opns Res Lett 8: 297-303.
-
(1989)
Opns Res Lett
, vol.8
, pp. 297-303
-
-
Potts, C.N.1
Baker, K.R.2
-
22
-
-
0000994184
-
A comparative study of lot streaming procedures
-
Baker KR and Jia D (1993). A comparative study of lot streaming procedures. Omega - Int J Mngt S 21: 561-566.
-
(1993)
Omega - Int J Mngt S
, vol.21
, pp. 561-566
-
-
Baker, K.R.1
Jia, D.2
-
23
-
-
0000611941
-
Basic techniques for lot streaming
-
Trietsch D and Baker KR (1993). Basic techniques for lot streaming. Opns Res 41: 1065-1076.
-
(1993)
Opns Res
, vol.41
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
24
-
-
84974861854
-
Integrating scheduling with batching and lot- Sizing: A review of algorithms and complexity
-
Potts CN and Van Wassenhove LN (1992). Integrating scheduling with batching and lot- sizing: a review of algorithms and complexity. J Opns Res Soc 43: 395-406.
-
(1992)
J Opns Res Soc
, vol.43
, pp. 395-406
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
25
-
-
0026896286
-
Two- And three-machine flow shop scheduling problems with equal sized transfer batches
-
Vickson RG and Alfredsson BE (1992). Two- and three-machine flow shop scheduling problems with equal sized transfer batches. Int J Prod Res 30: 1551-1574.
-
(1992)
Int J Prod Res
, vol.30
, pp. 1551-1574
-
-
Vickson, R.G.1
Alfredsson, B.E.2
-
27
-
-
0013356811
-
A near-optimal heuristic for the sequencing problem in multiple-batch flow shops with small equal sublots
-
Kalir AA and Sarin SC (2001). A near-optimal heuristic for the sequencing problem in multiple-batch flow shops with small equal sublots. Omega - Int J Mngt S 29: 577-584.
-
(2001)
Omega - Int J Mngt S
, vol.29
, pp. 577-584
-
-
Kalir, A.A.1
Sarin, S.C.2
-
28
-
-
0028769359
-
Lot streaming in three-stage production processes
-
Glass CA, Gupta JND and Potts CN (1994). Lot streaming in three-stage production processes. Eur J Opl Rex 75: 378-394.
-
(1994)
Eur J Opl Rex
, vol.75
, pp. 378-394
-
-
Glass, C.A.1
Gupta, J.N.D.2
Potts, C.N.3
-
29
-
-
0032131709
-
Structural properties of lot streaming in a flow shop
-
Glass CA and Potts CN (1998). Structural properties of lot streaming in a flow shop. Math Opns Res 23: 624-639.
-
(1998)
Math Opns Res
, vol.23
, pp. 624-639
-
-
Glass, C.A.1
Potts, C.N.2
-
30
-
-
84985818856
-
Solution procedures for the lot-streaming problem
-
Baker KR and Pyke DF (1990). Solution procedures for the lot-streaming problem. Decision Sci 21: 475-491.
-
(1990)
Decision Sci
, vol.21
, pp. 475-491
-
-
Baker, K.R.1
Pyke, D.F.2
-
32
-
-
0004250779
-
-
Amos Tuck School of Business Administration, Dartmouth College: Hanover, NH 03755
-
Baker KR (1998). Elements of Sequencing and Scheduling. Amos Tuck School of Business Administration, Dartmouth College: Hanover, NH 03755.
-
(1998)
Elements of Sequencing and Scheduling
-
-
Baker, K.R.1
-
33
-
-
3543079267
-
Scheduling and lot streaming in flowshops with no-wait in process
-
Hall NG, Laporte G, Selvarajah E and Sriskandarajah C (2003). Scheduling and lot streaming in flowshops with no-wait in process. J Sched 6: 339-354.
-
(2003)
J Sched
, vol.6
, pp. 339-354
-
-
Hall, N.G.1
Laporte, G.2
Selvarajah, E.3
Sriskandarajah, C.4
-
34
-
-
0000399972
-
Unit sized transfer batch scheduling with setup times
-
Çetinkaya FC and Kayaligil MS (1992). Unit sized transfer batch scheduling with setup times. Comput Ind Eng 22: 177-183.
-
(1992)
Comput Ind Eng
, vol.22
, pp. 177-183
-
-
Çetinkaya, F.C.1
Kayaligil, M.S.2
-
35
-
-
0028698198
-
Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
-
Çetinkaya FC (1994). Lot streaming in a two-stage flow shop with set-up, processing and removal times separated. J Opns Res Soc 45: 1445-1455.
-
(1994)
J Opns Res Soc
, vol.45
, pp. 1445-1455
-
-
Çetinkaya, F.C.1
-
36
-
-
21844508729
-
Lot streaming in the two-machine flow shop with setup times
-
Baker KR (1995). Lot streaming in the two-machine flow shop with setup times. Ann Oper Res 57: 1-11.
-
(1995)
Ann Oper Res
, vol.57
, pp. 1-11
-
-
Baker, K.R.1
-
37
-
-
0031076263
-
Lot streaming with detached setups in three-machine flow shops
-
Chen J and Steiner G (1997). Lot streaming with detached setups in three-machine flow shops. Eur J Opns Res 96: 591-611.
-
(1997)
Eur J Opns Res
, vol.96
, pp. 591-611
-
-
Chen, J.1
Steiner, G.2
-
38
-
-
0032262156
-
Lot streaming with attached setups in three-machine flow shops
-
Chen J and Steiner G (1998). Lot streaming with attached setups in three-machine flow shops. IIE Trans 30: 1075-1084.
-
(1998)
IIE Trans
, vol.30
, pp. 1075-1084
-
-
Chen, J.1
Steiner, G.2
-
39
-
-
0013289896
-
Approximation methods for discrete lot streaming in flow shops
-
Chen J and Steiner G (1997b). Approximation methods for discrete lot streaming in flow shops. Opns Res Lett 21: 139-145.
-
(1997)
Opns Res Lett
, vol.21
, pp. 139-145
-
-
Chen, J.1
Steiner, G.2
-
40
-
-
0032668182
-
Discrete lot streaming in two-machine flow shops
-
Chen J and Steiner G (1999). Discrete lot streaming in two-machine flow shops. Information 37: 160-173.
-
(1999)
Information
, vol.37
, pp. 160-173
-
-
Chen, J.1
Steiner, G.2
-
41
-
-
0029378595
-
Optimal lot streaming for multiple products in a two-machine flow shop
-
Vickson RG (1995). Optimal lot streaming for multiple products in a two-machine flow shop. Eur J Opns Res 85: 556-575.
-
(1995)
Eur J Opns Res
, vol.85
, pp. 556-575
-
-
Vickson, R.G.1
-
42
-
-
0033363409
-
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
-
Sriskandarajah C and Wagneur E (1999). Lot streaming and scheduling multiple products in two-machine no-wait flowshops. IIE Trans 31: 695-707.
-
(1999)
IIE Trans
, vol.31
, pp. 695-707
-
-
Sriskandarajah, C.1
Wagneur, E.2
-
43
-
-
0031186470
-
Lot streaming in jobshop scheduling
-
Dauzère-Pérès S and Lasserre JB (1997). Lot streaming in jobshop scheduling. Opns Res 45: 584-595.
-
(1997)
Opns Res
, vol.45
, pp. 584-595
-
-
Dauzère-Pérès, S.1
Lasserre, J.B.2
-
44
-
-
0032178227
-
Lot streaming in open shops
-
Şen A and Benli ÖS (1999). Lot streaming in open shops. Oper Res Lett 23: 135-142.
-
(1999)
Oper Res Lett
, vol.23
, pp. 135-142
-
-
Şen, A.1
Benli, Ö.S.2
-
45
-
-
0032190044
-
Optimal streaming of a single job in a two-stage flow shop
-
Şen A, Topaloǧlu E and Benli ÖS (1998). Optimal streaming of a single job in a two-stage flow shop. Eur J Opl Res 110: 42-62.
-
(1998)
Eur J Opl Res
, vol.110
, pp. 42-62
-
-
Şen, A.1
Topaloǧlu, E.2
Benli, Ö.S.3
-
46
-
-
0026414519
-
A framework for the design of lot-tracing systems for the 1990's
-
Petroff JN and Hill AV (1991). A framework for the design of lot-tracing systems for the 1990's. Prod Inv Mngt J 32: 55-61.
-
(1991)
Prod Inv Mngt J
, vol.32
, pp. 55-61
-
-
Petroff, J.N.1
Hill, A.V.2
-
47
-
-
0029260084
-
A structure for lot-tracing design
-
Steele DC (1995). A structure for lot-tracing design. Prod Inv Mngt J 36: 53-59.
-
(1995)
Prod Inv Mngt J
, vol.36
, pp. 53-59
-
-
Steele, D.C.1
|