-
1
-
-
0000994184
-
A comparative study of lot streaming procedures
-
KR Baker D Jia 1993 A comparative study of lot streaming procedures Omega 21 5 561 566
-
(1993)
Omega
, vol.21
, Issue.5
, pp. 561-566
-
-
Baker, K.R.1
Jia, D.2
-
2
-
-
0033702610
-
Evaluation of the potential benefits of lot streaming in flow-shop systems
-
AA Kalir SC Sarin 2000 Evaluation of the potential benefits of lot streaming in flow-shop systems Int J Prod Econ 66 131 142
-
(2000)
Int J Prod Econ
, vol.66
, pp. 131-142
-
-
Kalir, A.A.1
Sarin, S.C.2
-
3
-
-
27744497229
-
Comprehensive review of lot streaming
-
JH Chang HN Chiu 2005 Comprehensive review of lot streaming Int J Prod Res 43 8 1515 1536
-
(2005)
Int J Prod Res
, vol.43
, Issue.8
, pp. 1515-1536
-
-
Chang, J.H.1
Chiu, H.N.2
-
4
-
-
0000611941
-
Basic techniques for lot streaming
-
D Trietsch KR Baker 1993 Basic techniques for lot streaming Oper Res 41 6 1065 1076
-
(1993)
Oper Res
, vol.41
, Issue.6
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
5
-
-
0032190044
-
Optimal streaming of a single job in a two-stage flow shop
-
A Sen E Topaloglu OS Benli 1998 Optimal streaming of a single job in a two-stage flow shop Eur J Oper Res 110 42 62
-
(1998)
Eur J Oper Res
, vol.110
, pp. 42-62
-
-
Sen, A.1
Topaloglu, E.2
Benli, O.S.3
-
6
-
-
0033363409
-
Lot streaming and scheduling multiple products in two-machine no-wait flowshops
-
C Sriskandarajah E Wagneur 1999 Lot streaming and scheduling multiple products in two-machine no-wait flowshops IIE Trans 31 695 707
-
(1999)
IIE Trans
, vol.31
, pp. 695-707
-
-
Sriskandarajah, C.1
Wagneur, E.2
-
7
-
-
0013289896
-
Approximation methods for discrete lot streaming in flow shops
-
PII S0167637797000394
-
J Chen G Steiner 1997 Approximation methods for discrete lot streaming in flow shops Oper Res Lett 21 139 145 (Pubitemid 127420350)
-
(1997)
Operations Research Letters
, vol.21
, Issue.3
, pp. 139-145
-
-
Chen, J.1
Steiner, G.2
-
8
-
-
0037322968
-
On discrete lot streaming in no-wait flow shops
-
J Chen G Steiner 2003 On discrete lot streaming in no-wait flow shops IIE Trans 35 91 101
-
(2003)
IIE Trans
, vol.35
, pp. 91-101
-
-
Chen, J.1
Steiner, G.2
-
9
-
-
0035598113
-
Optimal solutions for the single batch, flow shop, lot-streaming problem with equal sublots
-
AA Kalir SC Sarin 2001 Optimal solutions for the single batch, flow shop, lot-streaming problem with equal sublots Decis Sci 32 2 387 397
-
(2001)
Decis Sci
, vol.32
, Issue.2
, pp. 387-397
-
-
Kalir, A.A.1
Sarin, S.C.2
-
10
-
-
0346243617
-
A heuristic method for discrete lot streaming with variable sublots in a flow shop
-
SC Liu 2003 A heuristic method for discrete lot streaming with variable sublots in a flow shop Int J Adv Manuf Technol 22 662 668
-
(2003)
Int J Adv Manuf Technol
, vol.22
, pp. 662-668
-
-
Liu, S.C.1
-
11
-
-
0033708147
-
Lot streaming and scheduling heuristics for m-machine no-wait flowshops
-
S Kumar TP Bagchi C Sriskandarajah 2000 Lot streaming and scheduling heuristics for m-machine no-wait flowshops Comput Ind Eng 38 149 172
-
(2000)
Comput Ind Eng
, vol.38
, pp. 149-172
-
-
Kumar, S.1
Bagchi, T.P.2
Sriskandarajah, C.3
-
13
-
-
0031076263
-
Lot streaming with detached setups in three-machine flow shops
-
PII S0377221796000914
-
J Chen G Steiner 1997 Lot streaming with detached setups in three-machine flow shops Eur J Oper Res 96 591 611 (Pubitemid 127378192)
-
(1997)
European Journal of Operational Research
, vol.96
, Issue.3
, pp. 591-611
-
-
Chen, J.1
Steiner, G.2
-
14
-
-
0032262156
-
Lot streaming with attached setups in three-machine flow shops
-
J Chen G Steiner 1998 Lot streaming with attached setups in three-machine flow shops IIE Trans 30 1075 1084
-
(1998)
IIE Trans
, vol.30
, pp. 1075-1084
-
-
Chen, J.1
Steiner, G.2
-
15
-
-
0016572027
-
Manufacturing cycle time determination for a multi-stage economic production quantity model
-
AZ Szendrovits 1975 Manufacturing cycle time determination for a multi-stage economic production quantity model Manag Sci 22 3 298 308
-
(1975)
Manag Sci
, vol.22
, Issue.3
, pp. 298-308
-
-
Szendrovits, A.Z.1
-
16
-
-
34247332782
-
The determination of in-process inventory and manufacturing lead time in multi-stage production systems
-
MA Ornek PI Collier 1988 The determination of in-process inventory and manufacturing lead time in multi-stage production systems Int J Oper Prod Manage 8 1 74 80
-
(1988)
Int J Oper Prod Manage
, vol.8
, Issue.1
, pp. 74-80
-
-
Ornek, M.A.1
Collier, P.I.2
-
17
-
-
84985755271
-
Optimal and heuristic models for lot splitting in a flow shop
-
DH Kropp TL Smunt 1990 Optimal and heuristic models for lot splitting in a flow shop Decis Sci 21 4 691 709
-
(1990)
Decis Sci
, vol.21
, Issue.4
, pp. 691-709
-
-
Kropp, D.H.1
Smunt, T.L.2
-
18
-
-
33644634541
-
Lot streaming with variable sublots: An integer programming formulation
-
D Biskup M Feldmann 2006 Lot streaming with variable sublots: an integer programming formulation J Oper Res Soc 57 296 303
-
(2006)
J Oper Res Soc
, vol.57
, pp. 296-303
-
-
Biskup, D.1
Feldmann, M.2
-
19
-
-
0000399972
-
Unit sized transfer batch scheduling with setup times
-
FC Cetinkaya MS Kayaligil 1992 Unit sized transfer batch scheduling with setup times Comput Ind Eng 22 2 177 183
-
(1992)
Comput Ind Eng
, vol.22
, Issue.2
, pp. 177-183
-
-
Cetinkaya, F.C.1
Kayaligil, M.S.2
-
21
-
-
34250898096
-
Tabu search and simulated annealing algorithms for scheduling in flow shops with lot streaming
-
S Marimuthu SG Ponnambalam N Jawahar 2007 Tabu search and simulated annealing algorithms for scheduling in flow shops with lot streaming Proc Inst Mech Eng B J Eng Manuf 221 2 317 331
-
(2007)
Proc Inst Mech Eng B J Eng Manuf
, vol.221
, Issue.2
, pp. 317-331
-
-
Marimuthu, S.1
Ponnambalam, S.G.2
Jawahar, N.3
-
23
-
-
0036722157
-
Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
-
SH Yoon JA Ventura 2002 Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling Comput Oper Res 29 1301 1315
-
(2002)
Comput Oper Res
, vol.29
, pp. 1301-1315
-
-
Yoon, S.H.1
Ventura, J.A.2
-
24
-
-
0036722525
-
An application of genetic algorithms to lot-streaming flow shop scheduling
-
SH Yoon JA Ventura 2002 An application of genetic algorithms to lot-streaming flow shop scheduling IIE Trans 34 779 787
-
(2002)
IIE Trans
, vol.34
, pp. 779-787
-
-
Yoon, S.H.1
Ventura, J.A.2
-
25
-
-
0013356811
-
A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots
-
AA Kalir SC Sarin 2001 A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots Omega 29 577 584
-
(2001)
Omega
, vol.29
, pp. 577-584
-
-
Kalir, A.A.1
Sarin, S.C.2
-
27
-
-
84985801774
-
Repetitive lots: Flow time reductions through sequencing and dynamic batch sizing
-
FR Jacobs DJ Bragg 1988 Repetitive lots: flow time reductions through sequencing and dynamic batch sizing Decis Sci 19 2 281 294
-
(1988)
Decis Sci
, vol.19
, Issue.2
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
28
-
-
0030500179
-
Lot splitting in stochastic flow shop and job shop environments
-
TL Smunt AH Buss DH Kropp 1996 Lot splitting in stochastic flow shop and job shop environments Decis Sci 27 2 215 238
-
(1996)
Decis Sci
, vol.27
, Issue.2
, pp. 215-238
-
-
Smunt, T.L.1
Buss, A.H.2
Kropp, D.H.3
-
29
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
F Glover 1986 Future paths for integer programming and links to artificial intelligence Comput Oper Res 13 5 533 549
-
(1986)
Comput Oper Res
, vol.13
, Issue.5
, pp. 533-549
-
-
Glover, F.1
-
31
-
-
33745967232
-
Improving the genetic algorithms performance in simple assembly line balancing
-
SO Tasan S Tunali 2006 Improving the genetic algorithms performance in simple assembly line balancing Lect Notes Comput Sci 3984 78 87
-
(2006)
Lect Notes Comput Sci
, vol.3984
, pp. 78-87
-
-
Tasan, S.O.1
Tunali, S.2
|