Solutions procedures for the lot-streaming problem
-
Baker, K.R. (1990) Solutions procedures for the lot-streaming problem. Decision Science, 21, 475-491.
-
(1990)
Decision Science
, vol.21
, pp. 475-491
-
-
Baker, K.R.1
-
4
-
-
0003787146
-
-
Princeton University Press, Princeton, NJ
-
Bellman, R. (1957) Dynamic Programming, Princeton University Press, Princeton, NJ.
-
(1957)
Dynamic Programming
-
-
Bellman, R.1
-
5
-
-
0036833214
-
Lot splitting to minimize average flowtime in a two-machine flowshop
-
Bukchin, J., Tzur, M. and Jaffe, M. (2002) Lot splitting to minimize average flowtime in a two-machine flowshop. IIE Transactions, 34, 953-970.
-
(2002)
IIE Transactions
, vol.34
, pp. 953-970
-
-
Bukchin, J.1
Tzur, M.2
Jaffe, M.3
-
6
-
-
0032262156
-
Lot streaming with attached setups in three-machine flow shops
-
Chen, J. and Steiner, G. (1998) Lot streaming with attached setups in three-machine flow shops. IIE Transactions, 30, 1075-1084.
-
(1998)
IIE Transactions
, vol.30
, pp. 1075-1084
-
-
Chen, J.1
Steiner, G.2
-
7
-
-
0030290958
-
Parallel-machine batching and scheduling to minimize total completion time
-
Cheng, T.C.E., Chen, Z.L., Covalyov, M.Y. and Lin, B.M.T. (1996) Parallel-machine batching and scheduling to minimize total completion time. IIE Transactions, 28, 953-956.
-
(1996)
IIE Transactions
, vol.28
, pp. 953-956
-
-
Cheng, T.C.E.1
Chen, Z.L.2
Covalyov, M.Y.3
Lin, B.M.T.4
-
8
-
-
84985854487
-
Heuristic estimation of the efficient frontier for a bi-criteria scheduling problem
-
De, P., Ghosh, J.B. and Wells, C.E. (1992) Heuristic estimation of the efficient frontier for a bi-criteria scheduling problem. Decision Sciences, 23, 596-609.
-
(1992)
Decision Sciences
, vol.23
, pp. 596-609
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
9
-
-
0023366055
-
Batching to minimize flow times on one machine
-
Dobson, G., Karmarkar, U. and Rummel, J. (1987) Batching to minimize flow times on one machine. Management Science, 33(6), 784-799.
-
(1987)
Management Science
, vol.33
, Issue.6
, pp. 784-799
-
-
Dobson, G.1
Karmarkar, U.2
Rummel, J.3
-
10
-
-
0001626728
-
Batching to minimize flow times on parallel heterogeneous machines
-
Dobson, G., Karmarkar, U.S. and Rummel, J.L. (1989) Batching to minimize flow times on parallel heterogeneous machines. Management Science, 35(5), 607-613.
-
(1989)
Management Science
, vol.35
, Issue.5
, pp. 607-613
-
-
Dobson, G.1
Karmarkar, U.S.2
Rummel, J.L.3
-
11
-
-
0034348230
-
Bicriteria optimization of the makespan and mean flowtime on two identical parallel machines
-
Gupta, J.N.D., Ho, J.C. and Webster, S. (2000) Bicriteria optimization of the makespan and mean flowtime on two identical parallel machines. Journal of the Operational Research Society, 51, 1330-1339.
-
(2000)
Journal of the Operational Research Society
, vol.51
, pp. 1330-1339
-
-
Gupta, J.N.D.1
Ho, J.C.2
Webster, S.3
-
12
-
-
0013356811
-
A near-optimal heuristic for the sequencing problem in multiple-batch flow-shop with small equal sublots
-
Kalir, A.A. and Sarin, S.C. (2001a) A near-optimal heuristic for the sequencing problem in multiple-batch flow-shop with small equal sublots. OMEGA, 29, 577-584.
-
(2001)
OMEGA
, vol.29
, pp. 577-584
-
-
Kalir, A.A.1
Sarin, S.C.2
-
13
-
-
0035598113
-
Optimal solutions for the single batch flow-shop lot streaming problem with equal sublots
-
Kalir, A.A. and Sarin, S.C. (2001b) Optimal solutions for the single batch flow-shop lot streaming problem with equal sublots. Decision Sciences, 32, 387-397.
-
(2001)
Decision Sciences
, vol.32
, pp. 387-397
-
-
Kalir, A.A.1
Sarin, S.C.2
-
14
-
-
84985755271
-
Optimal and heuristic models for lot splitting in a flow-shop
-
Kropp, D.H. and Smunt, T.L. (1990) Optimal and heuristic models for lot splitting in a flow-shop. Decision Sciences, 21(4), 691-709.
-
(1990)
Decision Sciences
, vol.21
, Issue.4
, pp. 691-709
-
-
Kropp, D.H.1
Smunt, T.L.2
-
15
-
-
1642570853
-
Design of self-regulating production control systems by tradeoffs programming
-
(to appear)
-
Masin, M., Herer, Y.T. and Dar-El, E.M. (2002) Design of self-regulating production control systems by tradeoffs programming. IIE Transactions, (to appear).
-
(2002)
IIE Transactions
-
-
Masin, M.1
Herer, Y.T.2
Dar-El, E.M.3
-
16
-
-
0035385251
-
An ant colony optimization approach to addressing a JIT sequencing problem with multiple objectives
-
McMullen, P.R. (2001a) An ant colony optimization approach to addressing a JIT sequencing problem with multiple objectives. Artificial Intelligence in Engineering, 15, 309-317.
-
(2001)
Artificial Intelligence in Engineering
, vol.15
, pp. 309-317
-
-
McMullen, P.R.1
-
17
-
-
0035545592
-
An efficient frontier approach to addressing JIT sequencing problem with setups via search heuristics
-
McMullen, P.R. (2001b) An efficient frontier approach to addressing JIT sequencing problem with setups via search heuristics. Computers & Industrial Engineering, 41, 335-353.
-
(2001)
Computers & Industrial Engineering
, vol.41
, pp. 335-353
-
-
McMullen, P.R.1
-
18
-
-
38249029546
-
One-pass batching algorithm for the one-machine problem
-
Nadef, D. and Santos, C. (1988) One-pass batching algorithm for the one-machine problem. Discrete Applied Mathematics, 21, 133-145.
-
(1988)
Discrete Applied Mathematics
, vol.21
, pp. 133-145
-
-
Nadef, D.1
Santos, C.2
-
19
-
-
0029254827
-
Multiple and bicriteria scheduling: A literature survey
-
Nagar, A.N., Haddock, J. and Heragu, S. (1995) Multiple and bicriteria scheduling: a literature survey. European Journal of Operational Research, 81, 88-104.
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 88-104
-
-
Nagar, A.N.1
Haddock, J.2
Heragu, S.3
-
20
-
-
0000976158
-
A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times
-
Nowicki, E. and Zdrzalka, S. (1995) A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times. Discrete Applied Mathematics, 63, 237-256.
-
(1995)
Discrete Applied Mathematics
, vol.63
, pp. 237-256
-
-
Nowicki, E.1
Zdrzalka, S.2
-
22
-
-
0034691446
-
Lot streaming in multistage production systems
-
Ramasesh, R.V., Fu, H., Fong, D.K.H. and Hayya, J.C. (2000) Lot streaming in multistage production systems. International Journal of Production Economics, 66, 199-211.
-
(2000)
International Journal of Production Economics
, vol.66
, pp. 199-211
-
-
Ramasesh, R.V.1
Fu, H.2
Fong, D.K.H.3
Hayya, J.C.4
-
23
-
-
0004262179
-
A discrete efficient frontier approach to the plant layout problem
-
Rosenblatt, M.J. and Sinuany-Stern, Z. (1986) A discrete efficient frontier approach to the plant layout problem. Material Flow, 3, 277-281.
-
(1986)
Material Flow
, vol.3
, pp. 277-281
-
-
Rosenblatt, M.J.1
Sinuany-Stern, Z.2
-
24
-
-
0022132659
-
Batching in single operation manufacturing systems
-
Santos, C. and Magazine, M. (1985) Batching in single operation manufacturing systems. Operations Research Letters, 4(3), 99-103.
-
(1985)
Operations Research Letters
, vol.4
, Issue.3
, pp. 99-103
-
-
Santos, C.1
Magazine, M.2
-
25
-
-
0032190044
-
Optimal streaming of a single job in a two-stage flow shop
-
Sen, A., Topaloǧlu, E. and Benli, Ö.S. (1998) Optimal streaming of a single job in a two-stage flow shop. European Journal of Operational Research, 110, 42-62.
-
(1998)
European Journal of Operational Research
, vol.110
, pp. 42-62
-
-
Sen, A.1
Topaloǧlu, E.2
Benli, Ö.S.3
-
26
-
-
0000611941
-
Basic techniques for lot streaming
-
Trietsch, D. and Baker, K.R. (1993) Basic techniques for lot streaming. Operations Research, 41(6), 1065-1076.
-
(1993)
Operations Research
, vol.41
, Issue.6
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
27
-
-
0022028816
-
Scheduling production activities in multi-stage manufacturing systems
-
Truscott, W.G. (1985) Scheduling production activities in multi-stage manufacturing systems. International Journal of Production Research, 23(2), 315-328.
-
(1985)
International Journal of Production Research
, vol.23
, Issue.2
, pp. 315-328
-
-
Truscott, W.G.1
|