-
1
-
-
0035836306
-
Mathematical modeling and heuristic approaches to operation scheduling problems in an FMS environment
-
Chinyao L, Tai-Hsi W (2001) Mathematical modeling and heuristic approaches to operation scheduling problems in an FMS environment. Int J Prod Res 39:689-708
-
(2001)
Int J Prod Res
, vol.39
, pp. 689-708
-
-
Chinyao, L.1
Tai-Hsi, W.2
-
2
-
-
9944254871
-
An approach of lot streaming in job shop production system
-
Chinyao L (1999) An approach of lot streaming in job shop production system. J Chin Inst Industr Eng 16:671-680
-
(1999)
J Chin Inst Industr Eng
, vol.16
, pp. 671-680
-
-
Chinyao, L.1
-
4
-
-
84985755271
-
Optimal and heuristic models for lot-splitting in a flow shop
-
Kropp DH, Smunt TL (1988) Optimal and heuristic models for lot-splitting in a flow shop. Decis Sci 21:691-709
-
(1988)
Decis Sci
, vol.21
, pp. 691-709
-
-
Kropp, D.H.1
Smunt, T.L.2
-
5
-
-
38249040429
-
Overlapping operations in material requirements planning
-
Graves SC, Kostreva MM (1986) Overlapping operations in material requirements planning. J Oper Manage 6:283-294
-
(1986)
J Oper Manage
, vol.6
, pp. 283-294
-
-
Graves, S.C.1
Kostreva, M.M.2
-
6
-
-
0026932105
-
Optimal cycle time in multistage serial system with setup and inventory cost
-
Karimi IA (1992) Optimal cycle time in multistage serial system with setup and inventory cost. Manage Sci 38:1467-1481
-
(1992)
Manage Sci
, vol.38
, pp. 1467-1481
-
-
Karimi, I.A.1
-
7
-
-
0000994184
-
A comparative study of lot streaming procedures
-
Baker KR, Jia D (1993) A comparative study of lot streaming procedures. OMEGA 21:561-566
-
(1993)
OMEGA
, vol.21
, pp. 561-566
-
-
Baker, K.R.1
Jia, D.2
-
8
-
-
84985818856
-
Solution procedures for the lot streaming problem
-
Baker KR, Pyke DF (1990) Solution procedures for the lot streaming problem. Decis Sci 21:475-491
-
(1990)
Decis Sci
, vol.21
, pp. 475-491
-
-
Baker, K.R.1
Pyke, D.F.2
-
9
-
-
0000399972
-
Unit sized transfer batch scheduling with setup time
-
Cetinkaya FC, Kayaligil MS (1992) Unit sized transfer batch scheduling with setup time. Comput Industr Eng 22:177-183
-
(1992)
Comput Industr Eng
, vol.22
, pp. 177-183
-
-
Cetinkaya, F.C.1
Kayaligil, M.S.2
-
10
-
-
0028769359
-
Lot streaming in three stage production processes
-
Glass CA, Gupta JND, Potts CN (1994) Lot streaming in three stage production processes. Eur J Oper Res 75:378-394
-
(1994)
Eur J Oper Res
, vol.75
, pp. 378-394
-
-
Glass, C.A.1
Jnd, G.2
Potts, C.N.3
-
11
-
-
0022516278
-
Optimal and heuristic procedures for component lot-splitting in multistage manufacturing system
-
Moily JP (1986) Optimal and heuristic procedures for component lot-splitting in multistage manufacturing system. Manage Sci 32:113-125
-
(1986)
Manage Sci
, vol.32
, pp. 113-125
-
-
Moily, J.P.1
-
12
-
-
0000611941
-
Basic techniques for lot streaming
-
Trietsch D, Baker KR (1993) Basic techniques for lot streaming. Oper Res 41:1065-1076
-
(1993)
Oper Res
, vol.41
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
13
-
-
0026896286
-
Two and three machine flow shop scheduling problem with equal sized transfer batches
-
Vickson RG, Alfredson BE (1992) Two and three machine flow shop scheduling problem with equal sized transfer batches. Int J Prod Res 30:1551-1574
-
(1992)
Int J Prod Res
, vol.30
, pp. 1551-1574
-
-
Vickson, R.G.1
Alfredson, B.E.2
-
14
-
-
0033702610
-
Evaluation of the potential benefits of lot streaming in flow-shop systems
-
Kalir AA, Sarin SC (2000) Evaluation of the potential benefits of lot streaming in flow-shop systems. Int J Prod Econ 66:131-142
-
(2000)
Int J Prod Econ
, vol.66
, pp. 131-142
-
-
Kalir, A.A.1
Sarin, S.C.2
-
15
-
-
0032190044
-
Optimal streaming of a single job in a two-stage flow shop
-
Sen A, Topaloglu E, Benli ÖS (1998) Optimal streaming of a single job in a two-stage flow shop. Eur J Oper Res 110:42-62
-
(1998)
Eur J Oper Res
, vol.110
, pp. 42-62
-
-
Sen, A.1
Topaloglu, E.2
Benli, Ö.S.3
-
16
-
-
84985801774
-
Repetitive lots: Flow time reductions through sequencing and dynamic batch sizing
-
Jacobs FR, Bragg DJ (1988) Repetitive lots: flow time reductions through sequencing and dynamic batch sizing. Decis Sci 19: 281-294
-
(1988)
Decis Sci
, vol.19
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
17
-
-
0028526352
-
The impact of lot splitting on due date performance
-
Wanger BJ, Ragatz GL (1994) The impact of lot splitting on due date performance. J Oper Manage 12:13-25
-
(1994)
J Oper Manage
, vol.12
, pp. 13-25
-
-
Wanger, B.J.1
Ragatz, G.L.2
-
18
-
-
0041003351
-
Effects of lot-splitting under various routing strategies
-
Hancock TM (1991) Effects of lot-splitting under various routing strategies. Int J Oper Prod Manage 11:68-75
-
(1991)
Int J Oper Prod Manage
, vol.11
, pp. 68-75
-
-
Hancock, T.M.1
-
19
-
-
0013445386
-
An iterative procedure for lot-streaming in job shop scheduling
-
Stephane DP, Lasserre JB (1993) An iterative procedure for lot-streaming in job shop scheduling. Comput Industr Eng 25:231-234
-
(1993)
Comput Industr Eng
, vol.25
, pp. 231-234
-
-
Stephane, D.P.1
Lasserre, J.B.2
-
20
-
-
0002381223
-
Machine sequencing via disjunctive graph: An implicit enumeration algorithm
-
Balas E (1969) Machine sequencing via disjunctive graph: an implicit enumeration algorithm. Oper Res 17:1-10
-
(1969)
Oper Res
, vol.17
, pp. 1-10
-
-
Balas, E.1
|