-
1
-
-
2042436401
-
Effect of dynamic and static dispatching strategies on dynamically planned and unplanned FMS
-
Abou-Ali, M., and M. Shouman. 2004. "Effect of Dynamic and Static Dispatching Strategies on Dynamically Planned and Unplanned FMS." Journal of Materials Processing Technology 148: 132-138.
-
(2004)
Journal of Materials Processing Technology
, vol.148
, pp. 132-138
-
-
Abou-Ali, M.1
Shouman, M.2
-
2
-
-
46149099616
-
A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication
-
Bahaji, N., and M. E. Kuhl. 2005. "A Simulation Study of New Multi-objective Composite Dispatching Rules, CONWIP, and Push Lot Release in Semiconductor Fabrication." Journal of Production Research 46 (14): 3801-3824.
-
(2005)
Journal of Production Research
, vol.46
, Issue.14
, pp. 3801-3824
-
-
Bahaji, N.1
Kuhl, M.E.2
-
3
-
-
22544444931
-
On the benefits of inventory pooling in production-inventory systems
-
Benjaafar, S., W. L. Cooper, and J. S. Kim. 2005. "On the Benefits of Inventory Pooling in Production-inventory Systems." Management Science 51 (4): 548-565.
-
(2005)
Management Science
, vol.51
, Issue.4
, pp. 548-565
-
-
Benjaafar, S.1
Cooper, W.L.2
Kim, J.S.3
-
4
-
-
0031078124
-
Order review and release strategies in a job shop environment: A review and a classification
-
Bergamaschi, D. R., M. P. Cigolini, and A. Portioli. 1997. "Order Review and Release Strategies in a Job Shop Environment: A Review and a Classification." International Journal of Production Research 35 (2): 399-420.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.2
, pp. 399-420
-
-
Bergamaschi, D.R.1
Cigolini, M.P.2
Portioli, A.3
-
5
-
-
0036610796
-
Designing unbalanced lines-understanding protective capacity and protective inventory
-
Blackstone Jr, J. H., and J. F. Cox III. 2002. "Designing Unbalanced Lines-understanding Protective Capacity and Protective Inventory." Production Planning & Control 13 (4): 416-423.
-
(2002)
Production Planning & Control
, vol.13
, Issue.4
, pp. 416-423
-
-
Blackstone, J.H.1
Cox, J.F.2
-
7
-
-
0034633396
-
Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy
-
Bonvik, A. M., Y. Dallery, and S. B. Gershwin. 2000. "Approximate Analysis of Production Systems Operated by a CONWIP/Finite Buffer Hybrid Control Policy." International Journal of Production Research 38 (13): 2845-2869.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.13
, pp. 2845-2869
-
-
Bonvik, A.M.1
Dallery, Y.2
Gershwin, S.B.3
-
9
-
-
0028547827
-
A simple release policy for networks of queues with controllable inputs
-
Duenyas, I. 1994a. "A Simple Release Policy for Networks of Queues with Controllable Inputs." Operations Research 42 (6): 1162-1171.
-
(1994)
Operations Research
, vol.42
, Issue.6
, pp. 1162-1171
-
-
Duenyas, I.1
-
10
-
-
0028457112
-
Estimating the throughput of a cyclic assembly system
-
Duenyas, I. 1994b. "Estimating the Throughput of a Cyclic Assembly System." International Journal of Production Research 32 (7): 1403-1419.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.7
, pp. 1403-1419
-
-
Duenyas, I.1
-
15
-
-
0011789026
-
-
Discussion paper 15/98. Department of Business and Economics, University of Greifswald, Germany
-
Framinan, J. M., R. Ruiz-Usano, and R. Leisten. 1998. "Sequencing CONWIP Flow-shops: Analysis and Heuristics." Discussion paper 15/98. Department of Business and Economics, University of Greifswald, Germany.
-
(1998)
Sequencing CONWIP Flow-shops: Analysis and Heuristics
-
-
Framinan, J.M.1
Ruiz-Usano, R.2
Leisten, R.3
-
19
-
-
0035536034
-
A simple and effective component procurement policy for stochastic assembly systems
-
Gallien, J., and L. M. Wein. 2001. "A Simple and Effective Component Procurement Policy for Stochastic Assembly Systems." Queueing Systems 38: 221-248.
-
(2001)
Queueing Systems
, vol.38
, pp. 221-248
-
-
Gallien, J.1
Wein, L.M.2
-
21
-
-
0033749924
-
An evolutionary approach to select a pull system among kanban, CONWIP and hybrid
-
Gaury, E. G. A., H. Pierreval, and J. P. C. Kleijnen. 2000. "An Evolutionary Approach to Select a Pull System among Kanban, CONWIP and Hybrid." Journal of Intelligent Manufacturing 11: 157-167.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, pp. 157-167
-
-
Gaury, E.G.A.1
Pierreval, H.2
Kleijnen, J.P.C.3
-
22
-
-
3242726703
-
A comparison of hybrid push/Pull and CONWIP/Pull production inventory control policies
-
Geraghty, J., and C. Heavey. 2004. "A Comparison of Hybrid Push/Pull and CONWIP/Pull Production Inventory Control Policies." International Journal of Production Economics 91: 75-90.
-
(2004)
International Journal of Production Economics
, vol.91
, pp. 75-90
-
-
Geraghty, J.1
Heavey, C.2
-
24
-
-
0036507644
-
A simulation study comparing performance of CONWIP and bottleneck-based release rules
-
Gilland, W. 2002. "A Simulation Study Comparing Performance of CONWIP and Bottleneck-based Release Rules." Production Planning & Control 13 (2): 211-219.
-
(2002)
Production Planning & Control
, vol.13
, Issue.2
, pp. 211-219
-
-
Gilland, W.1
-
25
-
-
0019585243
-
A review of production scheduling
-
Graves, S. C. 1981. "A Review of Production Scheduling." Operations Research 29 (4): 646-675.
-
(1981)
Operations Research
, vol.29
, Issue.4
, pp. 646-675
-
-
Graves, S.C.1
-
26
-
-
0036820181
-
Work order release and input sequencing for a printed circuit board assembly cell
-
Gronalt, M. 2002. "Work Order Release and Input Sequencing for a Printed Circuit Board Assembly Cell." Production Planning & Control 13 (7): 591-601.
-
(2002)
Production Planning & Control
, vol.13
, Issue.7
, pp. 591-601
-
-
Gronalt, M.1
-
28
-
-
70449408043
-
Production and changeover control policies of a class of failure prone buffered flow-shops
-
Hajji, A., A. Gharbi, J. P. Kenné, and Y. Hidehiko. 2009. "Production and Changeover Control Policies of a Class of Failure Prone Buffered Flow-shops." Production Planning & Control 20 (8): 785-800.
-
(2009)
Production Planning & Control
, vol.20
, Issue.8
, pp. 785-800
-
-
Hajji, A.1
Gharbi, A.2
Kenné, J.P.3
Hidehiko, Y.4
-
29
-
-
0001598483
-
Classification of location models
-
Hamacher, H. W., and S. Nickel. 1998. "Classification of Location Models." Location Science 6: 229-242.
-
(1998)
Location Science
, vol.6
, pp. 229-242
-
-
Hamacher, H.W.1
Nickel, S.2
-
30
-
-
0031124565
-
Mathematical programming formulation of CONWIP based production lines and relationships to MRP
-
Herer, Y. T., and M. Masin. 1997. "Mathematical Programming Formulation of CONWIP Based Production Lines and Relationships to MRP." International Journal of Production Research 35: 1067-1076.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1067-1076
-
-
Herer, Y.T.1
Masin, M.2
-
31
-
-
0032046661
-
Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
-
Hopp, W. J., and M. L. Roof. 1998. "Setting WIP Levels with Statistical Throughput Control (STC) in CONWIP Production Lines." International Journal of Production Research 36: 867-882.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 867-882
-
-
Hopp, W.J.1
Roof, M.L.2
-
33
-
-
0032300132
-
A simulation and comparative study of CONWIP, kanban and MRP production control systems for a cold rolling plant
-
Huang, M., D. Wang, and W. H. Ip. 1998. "A Simulation and Comparative Study of CONWIP, Kanban and MRP Production Control Systems for a Cold Rolling Plant." Production Planning & Control 9 (8): 803-812.
-
(1998)
Production Planning & Control
, vol.9
, Issue.8
, pp. 803-812
-
-
Huang, M.1
Wang, D.2
Ip, W.H.3
-
34
-
-
49249085242
-
The implementation of CONWIP in semiconductor fabrication facilities
-
Ignizio, J. P. 2003. "The Implementation of CONWIP in Semiconductor Fabrication Facilities." Future Fab International 14. http://www.future-fab.com/documents.asp?d-ID=1658.
-
(2003)
Future Fab International
, pp. 14
-
-
Ignizio, J.P.1
-
36
-
-
39449103543
-
Service-level performance of MRP, kanban, CONWIP and DBR due to parameter stability and environmental robustness
-
Jodlbauer, H., and A. Huber. 2008. "Service-level Performance of MRP, Kanban, CONWIP and DBR due to Parameter Stability and Environmental Robustness." International Journal of Production Research 46 (8): 2179-2195.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.8
, pp. 2179-2195
-
-
Jodlbauer, H.1
Huber, A.2
-
37
-
-
60749101509
-
Managing WIP and cycle time with the help of loop control
-
Miami, FL
-
Kalisch, S., R. Ringel, and J. Weigang. 2008. "Managing WIP and Cycle Time with the Help of Loop Control." In Proceedings of the 2008 Winter Simulation Conference, Miami, FL, 2298-2304.
-
(2008)
Proceedings of the 2008 Winter Simulation Conference
, pp. 2298-2304
-
-
Kalisch, S.1
Ringel, R.2
Weigang, J.3
-
39
-
-
84988307433
-
-
Technical Report. Department of Industrial & Operations Engineering, University of Michigan, Ann Arbor, MI
-
Keblis, M. F., and I. Duenyas. 1995. "Control of an Assembly System with Processing Time and Subassembly Type Uncertainty." Technical Report 95-9. Department of Industrial & Operations Engineering, University of Michigan, Ann Arbor, MI.
-
(1995)
Control of An Assembly System with Processing Time and Subassembly Type Uncertainty
-
-
Keblis, M.F.1
Duenyas, I.2
-
41
-
-
0142258726
-
An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios
-
Kim, S., K. Roscoe Davis, and J. F. Cox III. 2003. "An Investigation of Output Flow Control, Bottleneck Flow Control and Dynamic Flow Control Mechanisms in Various Simple Lines Scenarios." Production Planning & Control 14 (1): 15-32.
-
(2003)
Production Planning & Control
, vol.14
, Issue.1
, pp. 15-32
-
-
Kim, S.1
Roscoe Davis, K.2
Cox, J.F.3
-
42
-
-
0343517759
-
The general behavior of pull production systems: The allocation problems
-
Kirkavak, N., and C. Dincer. 1999. "The General Behavior of Pull Production Systems: The Allocation Problems." European Journal of Operational Research 119 (2): 479-494.
-
(1999)
European Journal of Operational Research
, vol.119
, Issue.2
, pp. 479-494
-
-
Kirkavak, N.1
Dincer, C.2
-
44
-
-
70349634141
-
Planning and implementing POLCA: A card-based control system for high variety or custom engineered products
-
Krishnamurthy, A., and R. Suri. 2009. "Planning and Implementing POLCA: A Card-based Control System for High Variety or Custom Engineered Products." Production Planning & Control 20 (7): 596-610.
-
(2009)
Production Planning & Control
, vol.20
, Issue.7
, pp. 596-610
-
-
Krishnamurthy, A.1
Suri, R.2
-
45
-
-
0031246942
-
A dispatching scheme involving move control and weighted due date for wafer foundries
-
Lee, C., and C. Chen. 1997. "A Dispatching Scheme Involving Move Control and Weighted Due Date for Wafer Foundries." IEE Transactions on Components, Packaging, and Manufacturing Technology 20: 268-277.
-
(1997)
IEE Transactions on Components, Packaging, and Manufacturing Technology
, vol.20
, pp. 268-277
-
-
Lee, C.1
Chen, C.2
-
48
-
-
77957847693
-
A coordinated scheduling system for customer orders scheduling problem in job shop environments
-
Liu, C. H. 2010. "A Coordinated Scheduling System for Customer Orders Scheduling Problem in Job Shop Environments." Expert Systems with Applications 37: 7831-7837.
-
(2010)
Expert Systems with Applications
, vol.37
, pp. 7831-7837
-
-
Liu, C.H.1
-
49
-
-
0035708905
-
Manufacturing controls: Understanding the fundamentals of kanban and CONWIP pull systems using simulation
-
Arlington, VA
-
Marek, R. P., D. A. Elkins, and D. R. Smith. 2001. "Manufacturing Controls: Understanding the Fundamentals of Kanban and CONWIP Pull Systems Using Simulation." In Proceedings of the 33nd Winter Simulation Conference, Arlington, VA, 921-929.
-
(2001)
Proceedings of the 33nd Winter Simulation Conference
, pp. 921-929
-
-
Marek, R.P.1
Elkins, D.A.2
Smith, D.R.3
-
50
-
-
84988264689
-
On the cumulant functions of a tandem queueing network with population constraints
-
edited by B. A. Peters. Appendix B, North Carolina: Texas Engineering Experiment Station
-
Matis, T. 2000. "On the Cumulant Functions of a Tandem Queueing Network with Population Constraints." In Use of Simulation-based Analysis, Prepiction and Control in Remanufacturing Facilities, edited by B. A. Peters. Appendix B, 1-9. North Carolina: Texas Engineering Experiment Station.
-
(2000)
Use of Simulation-based Analysis, Prepiction and Control in Remanufacturing Facilities
, pp. 1-9
-
-
Matis, T.1
-
53
-
-
84887752143
-
-
New York: Springer
-
Mönch, L., J. W. Fowler, and S. J. Mason. 2013. Production Planning and Control for Semiconductor Wafer Fabrication Facilities: Modeling, Analysis, and Systems. New York: Springer.
-
(2013)
Production Planning and Control for Semiconductor Wafer Fabrication Facilities: Modeling, Analysis, and Systems
-
-
Mönch, L.1
Fowler, J.W.2
Mason, S.J.3
-
55
-
-
33644592521
-
Simulating production and inventory control systems: A learning approach to operational excellence
-
Olhager, J., and F. Persson. 2006. "Simulating Production and Inventory Control Systems: A Learning Approach to Operational Excellence." Production Planning & Control: The Management of Operations 17 (2): 113-127.
-
(2006)
Production Planning & Control: The Management of Operations
, vol.17
, Issue.2
, pp. 113-127
-
-
Olhager, J.1
Persson, F.2
-
58
-
-
84891953589
-
Parallel CONWIP for a high-mix multi-stage production system with entrance of rework
-
Prakash, J., M. Y. Chong, S. A. Mustafa, and J. F. Chin. 2011. "Parallel CONWIP for a High-mix Multi-stage Production System with Entrance of Rework." Journal of Production Research and Management 1 (2): 1-23.
-
(2011)
Journal of Production Research and Management
, vol.1
, Issue.2
, pp. 1-23
-
-
Prakash, J.1
Chong, M.Y.2
Mustafa, S.A.3
Chin, J.F.4
-
59
-
-
0036923659
-
Simulation based cause and effect analysis of cycle time and WIP in semiconductor wafer fabrication
-
San Diego, CA
-
Qi, C., T. K. Tang, and A. I. Sivakumar. 2002. "Simulation Based Cause and Effect Analysis of Cycle Time and WIP in Semiconductor Wafer Fabrication." In Proceedings of the 2002 Winter Simulation Conference, San Diego, CA, 1423-1430.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1423-1430
-
-
Qi, C.1
Tang, T.K.2
Sivakumar, A.I.3
-
61
-
-
0035372917
-
Evolution of manufacturing planning and control systems: From reorder point to enterprise resources planning
-
Rondeau, P. J., and L. A. Litteral. 2001. "Evolution of Manufacturing Planning and Control Systems: From Reorder Point to Enterprise Resources Planning." Production & Inventory Management Journal 42 (2): 1-7.
-
(2001)
Production & Inventory Management Journal
, vol.42
, Issue.2
, pp. 1-7
-
-
Rondeau, P.J.1
Litteral, L.A.2
-
62
-
-
0033307341
-
CONLOAD - A new lot release rule for semiconductor wafer fabs
-
Phoenix, AZ
-
Rose, O. 1999. "CONLOAD - A New Lot Release Rule for Semiconductor Wafer Fabs." In Proceedings of the 1999 Winter Simulation Conference, Phoenix, AZ, 850-855.
-
(1999)
Proceedings of the 1999 Winter Simulation Conference
, pp. 850-855
-
-
Rose, O.1
-
64
-
-
84988264752
-
Performance analyses of CONWIP-base stock controlled production system using simulation
-
Year XVI 20 (1). Univsersity of Pitesti, Romania
-
Rotaru, A. 2011. "Performance Analyses of CONWIP-Base Stock Controlled Production System Using Simulation." Scientific Bulletin, Automotive Series Year XVI 20 (1). University of Pitesti, Romania
-
(2011)
Scientific Bulletin, Automotive Series
-
-
Rotaru, A.1
-
65
-
-
0000115495
-
Setting base stock levels using product-form queueing networks
-
Rubio, R., and L. W. Wein. 1996. "Setting Base Stock Levels Using Product-form Queueing Networks." Management Science 42 (2): 259-268.
-
(1996)
Management Science
, vol.42
, Issue.2
, pp. 259-268
-
-
Rubio, R.1
Wein, L.W.2
-
66
-
-
0034135515
-
Determining inventory levels in a CONWIP controlled job shop
-
Ryan, S. M., B. Baynat, and F. Choobineh. 2000. "Determining Inventory Levels in a CONWIP Controlled Job Shop." IIE Transactions 32 (2): 105-114.
-
(2000)
IIE Transactions
, vol.32
, Issue.2
, pp. 105-114
-
-
Ryan, S.M.1
Baynat, B.2
Choobineh, F.3
-
67
-
-
27844560093
-
Allocating work in process in a multiple-product CONWIP system with lost sales
-
Ryan, S. M., and J. Vorasayan. 2005. "Allocating Work in Process in a Multiple-product CONWIP System with Lost Sales." International Journal of Production Research 43: 223-246.
-
(2005)
International Journal of Production Research
, vol.43
, pp. 223-246
-
-
Ryan, S.M.1
Vorasayan, J.2
-
68
-
-
0030408135
-
Evaluation of lot release policies for semiconductor manufacturing systems
-
Coronado, CA
-
Sandell, R., and K. Srinivasan. 1996. "Evaluation of Lot Release Policies for Semiconductor Manufacturing Systems." In Proceedings of the 1996 Winter Simulation Conference, Coronado, CA, 1014-1022.
-
(1996)
Proceedings of the 1996 Winter Simulation Conference
, pp. 1014-1022
-
-
Sandell, R.1
Srinivasan, K.2
-
69
-
-
33747781379
-
A dispatching rule for photolithography scheduling with an On-line rework strategy
-
Sha, D. Y., S. Y. Hsu, Z. H. Che, and C. H. Chen. 2006. "A Dispatching Rule for Photolithography Scheduling with an On-line Rework Strategy." Computers & Industrial Engineering 50: 233-247.
-
(2006)
Computers & Industrial Engineering
, vol.50
, pp. 233-247
-
-
Sha, D.Y.1
Hsu, S.Y.2
Che, Z.H.3
Chen, C.H.4
-
70
-
-
70349642237
-
A lean production control system for high-variety/Low-volume environments: A case study implementation
-
Slomp, J., J. A. C. Bokhorst, and R. Germs. 2009. "A Lean Production Control System for High-variety/Low-volume Environments: A Case Study Implementation." Production Planning & Control 20 (7): 586-595.
-
(2009)
Production Planning & Control
, vol.20
, Issue.7
, pp. 586-595
-
-
Slomp, J.1
Bokhorst, J.A.C.2
Germs, R.3
-
71
-
-
0000996514
-
Customer service in pull production systems
-
Spearman, M. L. 1992. "Customer Service in Pull Production Systems." Operations Research 40 (5): 948-958.
-
(1992)
Operations Research
, vol.40
, Issue.5
, pp. 948-958
-
-
Spearman, M.L.1
-
73
-
-
0026859945
-
Push and pull production systems: Issues and comparisons
-
Spearman, M. L., and M. A. Zazanis. 1992. "Push and Pull Production Systems: Issues and Comparisons." Operations Research 40 (3): 521-532.
-
(1992)
Operations Research
, vol.40
, Issue.3
, pp. 521-532
-
-
Spearman, M.L.1
Zazanis, M.A.2
-
76
-
-
21144459469
-
Properties of serial kanban systems
-
Tayur, S. R. 1992. "Properties of Serial Kanban Systems." Queueing Systems 12: 297-319.
-
(1992)
Queueing Systems
, vol.12
, pp. 297-319
-
-
Tayur, S.R.1
-
77
-
-
84860983716
-
JIT for repetitive and non-repetitive production
-
Chapter 21 (Draft textbook). non-commercial use at
-
Trietsch, D. 1995. "JIT for Repetitive and Non-repetitive Production." In Quality Management for System Optimization: Leadership, Focusing, Analysis and Engineering. Chapter 21 (Draft textbook). Available for non-commercial use at http://staff.business.auckland.ac.nz/staffpages/dtriets/HBC.htm.
-
(1995)
Quality Management for System Optimization: Leadership, Focusing, Analysis and Engineering
-
-
Trietsch, D.1
-
78
-
-
24044526888
-
From management by constraints (MBC) to management by criticalities (MBC II)
-
Trietsch, D. 2005. "From Management by Constraints (MBC) to Management by Criticalities (MBC II)." Human Systems Management 24: 105-115.
-
(2005)
Human Systems Management
, vol.24
, pp. 105-115
-
-
Trietsch, D.1
-
80
-
-
0034428778
-
Scheduling MEMS manufacturing
-
Orlando, FL
-
Wang, L. X., E. H. Tay, and L. H. Lee. 2000. "Scheduling MEMS Manufacturing." In Proceedings of the 2000 Winter Simulation Conference, Orlando, FL, 1472-1480.
-
(2000)
Proceedings of the 2000 Winter Simulation Conference
, pp. 1472-1480
-
-
Wang, L.X.1
Tay, E.H.2
Lee, L.H.3
-
81
-
-
0012706318
-
Managing a flow line with single-kanban, dual-kanban or CONWIP
-
Yang, K. K. 2000. "Managing a Flow Line with Single-kanban, Dual-kanban or CONWIP." Production and Operations Management 9 (4): 349-366.
-
(2000)
Production and Operations Management
, vol.9
, Issue.4
, pp. 349-366
-
-
Yang, K.K.1
-
82
-
-
33846932977
-
An evolutionary simulation approach for the optimization of multi-constant work-in-process strategy-A case study
-
Yang, T., H. P. Fu, and K. Y. Yang. 2007. "An Evolutionary simulation Approach for the Optimization of Multi-constant Work-in-process Strategy-a Case Study." International Journal of Production Economics 107 (1): 104-114.
-
(2007)
International Journal of Production Economics
, vol.107
, Issue.1
, pp. 104-114
-
-
Yang, T.1
Fu, H.P.2
Yang, K.Y.3
-
83
-
-
78650604892
-
Lean-pull strategy in a Re-entrant manufacturing environment: A pilot study for TFT-LCD array manufacturing
-
Yang, T., C. H. Hsieh, and B. Y. Cheng. 2011. "Lean-pull Strategy in a Re-entrant Manufacturing Environment: A Pilot Study for TFT-LCD Array Manufacturing." International Journal of Production Research 49 (6): 1511-1529.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.6
, pp. 1511-1529
-
-
Yang, T.1
Hsieh, C.H.2
Cheng, B.Y.3
|