메뉴 건너뛰기




Volumn 201, Issue 1, 2010, Pages 99-111

Concerning the theory of workload control

Author keywords

Job shop; Order release; Workload control

Indexed keywords

AGGREGATION METHODS; DATA ANALYSIS; DBR; JOB SHOP; LEAN PRODUCTION; ORDER RELEASE; ORDER SELECTION; POSITIVE EFFECTS; PROTECTIVE CAPACITY; SHOP PERFORMANCE; WORKLOAD CONTROL;

EID: 70249135320     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2009.02.003     Document Type: Article
Times cited : (116)

References (66)
  • 1
    • 84985810576 scopus 로고
    • Due date assignment, job order release, and sequencing interaction in job shop scheduling
    • Ahmed I., and Fisher W.W. Due date assignment, job order release, and sequencing interaction in job shop scheduling. Decision Sciences 23 3 (1992) 633-647
    • (1992) Decision Sciences , vol.23 , Issue.3 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 2
    • 1342330563 scopus 로고    scopus 로고
    • A study of the utilization of capacity constrained resources in drum-buffer-rope systems
    • Atwater J.B., and Chakravorty S.S. A study of the utilization of capacity constrained resources in drum-buffer-rope systems. Production and Operations Management 11 2 (2002) 259-273
    • (2002) Production and Operations Management , vol.11 , Issue.2 , pp. 259-273
    • Atwater, J.B.1    Chakravorty, S.S.2
  • 3
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker K.R. The effects of input control in a simple scheduling model. Journal of Operations Management 4 2 (1984) 99-112
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 4
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte W. Theory and practice of load-oriented manufacturing control. International Journal of Production Research 26 3 (1988) 375-395
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 5
    • 0031078124 scopus 로고    scopus 로고
    • Order review and release strategies in a job shop environment: A review and a classification
    • Bergamaschi D.R., Cigolini M.P., and Portioli A. Order review and release strategies in a job shop environment: A review and a classification. International Journal of Production Research 35 2 (1997) 399-420
    • (1997) International Journal of Production Research , vol.35 , Issue.2 , pp. 399-420
    • Bergamaschi, D.R.1    Cigolini, M.P.2    Portioli, A.3
  • 6
    • 0036820319 scopus 로고    scopus 로고
    • Workload based order release and productivity: A missing link
    • Bertrand J.W.M., and Van Ooijen H.P.G. Workload based order release and productivity: A missing link. Production Planning and Control 13 7 (2002) 665-678
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 665-678
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 7
    • 0023861277 scopus 로고
    • Multiproduct queuing networks with deterministic routing: Decomposition approach and the notion of interference
    • Bitran G.R., and Tirupati D. Multiproduct queuing networks with deterministic routing: Decomposition approach and the notion of interference. Management Science 34 1 (1988) 75-100
    • (1988) Management Science , vol.34 , Issue.1 , pp. 75-100
    • Bitran, G.R.1    Tirupati, D.2
  • 8
    • 0024769152 scopus 로고
    • Implementing a loading heuristic in a discrete release job shop
    • Bobrowski P.M. Implementing a loading heuristic in a discrete release job shop. International Journal of Production Research 27 11 (1989) 1935-1948
    • (1989) International Journal of Production Research , vol.27 , Issue.11 , pp. 1935-1948
    • Bobrowski, P.M.1
  • 9
    • 84985841594 scopus 로고
    • Alternate routing strategies in batch manufacturing: An evaluation
    • Bobrowski P.M., and Mabert V.A. Alternate routing strategies in batch manufacturing: An evaluation. Decision Sciences 19 4 (1988) 713-733
    • (1988) Decision Sciences , vol.19 , Issue.4 , pp. 713-733
    • Bobrowski, P.M.1    Mabert, V.A.2
  • 11
    • 0001267220 scopus 로고
    • The strategic use of capacity slack in the economic lot scheduling problem with random demand
    • Bourland K.E., and Yano C.A. The strategic use of capacity slack in the economic lot scheduling problem with random demand. Management Science 40 12 (1994) 1690-1704
    • (1994) Management Science , vol.40 , Issue.12 , pp. 1690-1704
    • Bourland, K.E.1    Yano, C.A.2
  • 13
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • Breithaupt J., Land M., and Nyhuis P. The workload control concept: Theory and practical extensions of load oriented order release. Production Planning and Control 13 7 (2002) 625-638
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 625-638
    • Breithaupt, J.1    Land, M.2    Nyhuis, P.3
  • 14
    • 0041917736 scopus 로고    scopus 로고
    • An evaluation of the DBR control mechanism in a job shop environment
    • Chakravorty S.S. An evaluation of the DBR control mechanism in a job shop environment. Omega 29 4 (2001) 335-342
    • (2001) Omega , vol.29 , Issue.4 , pp. 335-342
    • Chakravorty, S.S.1
  • 17
    • 0032628093 scopus 로고    scopus 로고
    • CONWIP-based production lines with multiple bottlenecks: Performance and design implications
    • Dar-El E.M., Herer Y.T., and Masin M. CONWIP-based production lines with multiple bottlenecks: Performance and design implications. IIE Transactions 31 (1999) 99-111
    • (1999) IIE Transactions , vol.31 , pp. 99-111
    • Dar-El, E.M.1    Herer, Y.T.2    Masin, M.3
  • 18
    • 0031640498 scopus 로고    scopus 로고
    • The influence of protective capacity on the performance of a shop flow line: A simulation analysis
    • San Diego, CA, pp
    • Davis, K.R., Knight, C.S., Kim, S., Turner, C.F., 1999. The influence of protective capacity on the performance of a shop flow line: A simulation analysis, in: Decision Science Institute Proceedings 1999, San Diego, CA, pp. 1384-1386.
    • (1999) Decision Science Institute Proceedings , pp. 1384-1386
    • Davis, K.R.1    Knight, C.S.2    Kim, S.3    Turner, C.F.4
  • 20
    • 0031168222 scopus 로고    scopus 로고
    • Improving the product mix heuristic in the theory of constraints
    • Fredendall L.D., and Lea B.R. Improving the product mix heuristic in the theory of constraints. International Journal of Production Research 35 6 (1997) 1535-1544
    • (1997) International Journal of Production Research , vol.35 , Issue.6 , pp. 1535-1544
    • Fredendall, L.D.1    Lea, B.R.2
  • 22
    • 0024102409 scopus 로고
    • A scheduling rule for job release in semiconductor fabrication
    • Glassey C.R., and Resende M.G.C. A scheduling rule for job release in semiconductor fabrication. Operations Research Letters 7 5 (1988) 213-217
    • (1988) Operations Research Letters , vol.7 , Issue.5 , pp. 213-217
    • Glassey, C.R.1    Resende, M.G.C.2
  • 24
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry L.C., and Wong S.K. Alternative order release mechanisms: A comparison by simulation. International Journal of Production Research 32 12 (1994) 2827-2842
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 25
    • 0031632563 scopus 로고    scopus 로고
    • The effect of workload control (WLC) on performance in make-to-order companies
    • Hendry L.C., Kingsman B.G., and Cheung P. The effect of workload control (WLC) on performance in make-to-order companies. Journal of Operations Management 16 (1998) 63-75
    • (1998) Journal of Operations Management , vol.16 , pp. 63-75
    • Hendry, L.C.1    Kingsman, B.G.2    Cheung, P.3
  • 26
    • 0032046661 scopus 로고    scopus 로고
    • Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
    • Hopp W.J., and Roof M. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines. International Journal of Production Research 36 4 (1998) 869-882
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 869-882
    • Hopp, W.J.1    Roof, M.2
  • 29
    • 38249027443 scopus 로고
    • Load-limited order release in job shop scheduling systems
    • Kanet J.J. Load-limited order release in job shop scheduling systems. Journal of Operations Management 7 (1988) 44-58
    • (1988) Journal of Operations Management , vol.7 , pp. 44-58
    • Kanet, J.J.1
  • 30
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent setup times
    • Kim S., and Bobrowski P.M. Evaluating order release mechanisms in a job shop with sequence-dependent setup times. Production and Operations Management 4 2 (1995) 163-180
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.1    Bobrowski, P.M.2
  • 31
    • 0036819875 scopus 로고    scopus 로고
    • The relative contributions of input and output controls on the performance of a workload control system in make-to-order companies
    • Kingsman B., and Hendry L. The relative contributions of input and output controls on the performance of a workload control system in make-to-order companies. Production Planning and Control 13 7 (2002) 579-590
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 579-590
    • Kingsman, B.1    Hendry, L.2
  • 32
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops: A critical assessment
    • Land M., and Gaalman G. Workload control concepts in job shops: A critical assessment. International Journal Production Economics 46 (1996) 535-548
    • (1996) International Journal Production Economics , vol.46 , pp. 535-548
    • Land, M.1    Gaalman, G.2
  • 33
    • 84987012876 scopus 로고
    • Shifting production bottlenecks: Causes, cures, and conundrums
    • Lawrence S.R., and Buss A.H. Shifting production bottlenecks: Causes, cures, and conundrums. Production and Operations Management 3 1 (1994) 21-37
    • (1994) Production and Operations Management , vol.3 , Issue.1 , pp. 21-37
    • Lawrence, S.R.1    Buss, A.H.2
  • 34
    • 84990574744 scopus 로고
    • Order release in automated manufacturing systems
    • Lingayat S., Mittenthal J., and O'Keefe R.M. Order release in automated manufacturing systems. Decision Sciences 26 2 (1995) 175-205
    • (1995) Decision Sciences , vol.26 , Issue.2 , pp. 175-205
    • Lingayat, S.1    Mittenthal, J.2    O'Keefe, R.M.3
  • 35
    • 0026880669 scopus 로고
    • Theory of constraints and linear programming: A comparison
    • Luebbe R., and Finch B. Theory of constraints and linear programming: A comparison. International Journal Production Research 30 6 (1992) 1471-1478
    • (1992) International Journal Production Research , vol.30 , Issue.6 , pp. 1471-1478
    • Luebbe, R.1    Finch, B.2
  • 36
    • 84990609932 scopus 로고
    • Management of vital customer priorities in job shop manufacturing environments
    • Malhotra M.K., Jensen J.B., and Philipoom P.R. Management of vital customer priorities in job shop manufacturing environments. Decision Sciences 25 5/6 (1994) 711-736
    • (1994) Decision Sciences , vol.25 , Issue.5-6 , pp. 711-736
    • Malhotra, M.K.1    Jensen, J.B.2    Philipoom, P.R.3
  • 38
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems: A simulation experiment
    • Melnyk S.A., Ragatz G.L., and Fredendall L.D. Load smoothing by the planning and order review/release systems: A simulation experiment. Journal of Operations Management 10 4 (1992) 512-523
    • (1992) Journal of Operations Management , vol.10 , Issue.4 , pp. 512-523
    • Melnyk, S.A.1    Ragatz, G.L.2    Fredendall, L.D.3
  • 40
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • Missbauer H. Aggregate order release planning for time-varying demand. International Journal of Production Research 40 3 (2002) 699-718
    • (2002) International Journal of Production Research , vol.40 , Issue.3 , pp. 699-718
    • Missbauer, H.1
  • 42
    • 0002087205 scopus 로고    scopus 로고
    • Toward the estimation of bottleneck shiftiness in a manufacturing operation
    • Moss H.K., and Yu W.B. Toward the estimation of bottleneck shiftiness in a manufacturing operation. Production and Inventory Management Journal 40 2 (1999) 53-58
    • (1999) Production and Inventory Management Journal , vol.40 , Issue.2 , pp. 53-58
    • Moss, H.K.1    Yu, W.B.2
  • 44
    • 38249005828 scopus 로고
    • Job release and labor flexibility in a dual resource constrained job shop
    • Park P.S., and Bobrowski P.M. Job release and labor flexibility in a dual resource constrained job shop. Journal of Operations Management 8 3 (1989) 230-249
    • (1989) Journal of Operations Management , vol.8 , Issue.3 , pp. 230-249
    • Park, P.S.1    Bobrowski, P.M.2
  • 46
    • 0029732560 scopus 로고    scopus 로고
    • An enhanced loading model for the probabilistic workload control under workload imbalance
    • Perona M., and Portioli A. An enhanced loading model for the probabilistic workload control under workload imbalance. Production Planning and Control 7 1 (1996) 68-78
    • (1996) Production Planning and Control , vol.7 , Issue.1 , pp. 68-78
    • Perona, M.1    Portioli, A.2
  • 47
    • 0033101604 scopus 로고    scopus 로고
    • Order review/release in the absence of adherence to formal scheduling policies
    • Philipoom P.R., and Fry T.D. Order review/release in the absence of adherence to formal scheduling policies. Journal of Operations Management 17 3 (1999) 327-342
    • (1999) Journal of Operations Management , vol.17 , Issue.3 , pp. 327-342
    • Philipoom, P.R.1    Fry, T.D.2
  • 48
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom P.R., Malhorta M.K., and Jensen J.B. An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sciences 24 6 (1993) 1109-1133
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Philipoom, P.R.1    Malhorta, M.K.2    Jensen, J.B.3
  • 50
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job-shop environment
    • Ragatz G.L., and Mabert V.A. An evaluation of order release mechanisms in a job-shop environment. Decision Sciences 19 (1988) 167-189
    • (1988) Decision Sciences , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 54
    • 0034135515 scopus 로고    scopus 로고
    • Determining inventory levels in a CONWIP controlled job shop
    • Ryan S.M., Baybat B., and Choobineh F.F. Determining inventory levels in a CONWIP controlled job shop. IIE Transactions 32 (2000) 104-114
    • (2000) IIE Transactions , vol.32 , pp. 104-114
    • Ryan, S.M.1    Baybat, B.2    Choobineh, F.F.3
  • 56
    • 0034371598 scopus 로고    scopus 로고
    • A load-based and due-date-oriented approach to order review/release in job shops
    • Sabuncuoglu I., and Karapinar H.Y. A load-based and due-date-oriented approach to order review/release in job shops. Decision Sciences 31 2 (2000) 413-447
    • (2000) Decision Sciences , vol.31 , Issue.2 , pp. 413-447
    • Sabuncuoglu, I.1    Karapinar, H.Y.2
  • 59
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman M.L., and Zazanis M. Push and pull production systems: Issues and comparisons. Operations Research 40 3 (1992) 521-532
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.2
  • 62
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make-to-order industry
    • Stevenson M., Hendry L.C., and Kingsman B G. A review of production planning and control: The applicability of key concepts to the make-to-order industry. International Journal of Production Research 43 5 (2005) 869-898
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman B, G.3
  • 65
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein L.M., and Chevalier P.B. A broader view of the job-shop scheduling problem. Management Science 38 7 (1992) 1018-1033
    • (1992) Management Science , vol.38 , Issue.7 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.