메뉴 건너뛰기




Volumn 38, Issue 18, 2000, Pages 4589-4598

Input control and dispatching rules in a dynamic CONWIP flow-shop

Author keywords

[No Author keywords available]

Indexed keywords

JOB ANALYSIS; ROBUSTNESS (CONTROL SYSTEMS); SCHEDULING;

EID: 0034672912     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540050205523     Document Type: Article
Times cited : (33)

References (26)
  • 1
    • 0031147439 scopus 로고    scopus 로고
    • Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
    • Anwar, M.F. and Nagi, R., 1997, Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups. International Journal of Production Research, 35, 1447-1470.
    • (1997) International Journal of Production Research , vol.35 , pp. 1447-1470
    • Anwar, M.F.1    Nagi, R.2
  • 2
    • 0031529082 scopus 로고    scopus 로고
    • Analysis of local decision rules in a dual-kanban flowshop
    • Ardalan, A., 1997, Analysis of local decision rules in a dual-kanban flowshop. Decision Sciences, 28, 195-211.
    • (1997) Decision Sciences , vol.28 , pp. 195-211
    • Ardalan, A.1
  • 3
    • 0027813686 scopus 로고
    • Effect of buffer capacity and sequencing rules on single-card kanban system performance
    • Berkley, B.J., 1993, Effect of buffer capacity and sequencing rules on single-card kanban system performance. International Journal of Production Research, 31, 2875-2893.
    • (1993) International Journal of Production Research , vol.31 , pp. 2875-2893
    • Berkley, B.J.1
  • 4
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a kanban controlled flowshop
    • Berkley, B.J. and Kiran, A.S., 1991, A simulation study of sequencing rules in a kanban controlled flowshop. Decision Sciences, 22, 559-582.
    • (1991) Decision Sciences , vol.22 , pp. 559-582
    • Berkley, B.J.1    Kiran, A.S.2
  • 9
    • 0011729170 scopus 로고
    • Scheduling production on one machine with changeover times
    • Driscoll, W.C., 1975, Scheduling production on one machine with changeover times, ORSA-TIMS Joint National Meeting.
    • (1975) ORSA-TIMS Joint National Meeting
    • Driscoll, W.C.1
  • 10
    • 0028547827 scopus 로고
    • A simple release policy for networks of queues with controllable input
    • Duenyas, I., 1994, A simple release policy for networks of queues with controllable input. Operations Research, 42, 1162-1171.
    • (1994) Operations Research , vol.42 , pp. 1162-1171
    • Duenyas, I.1
  • 13
    • 0031124565 scopus 로고    scopus 로고
    • Mathematical programming formulation of CONWIP based production lines and relationships to MRP
    • Herer, Y.T. and Masin, M., 1997, Mathematical programming formulation of CONWIP based production lines and relationships to MRP. International Journal of Production Research, 35, 1067-1076.
    • (1997) International Journal of Production Research , vol.35 , pp. 1067-1076
    • Herer, Y.T.1    Masin, M.2
  • 14
    • 0026119502 scopus 로고
    • Throughput of a constant work in process manufacturing line subject to failures
    • Hopp, W.J. and Spearman, M.L., 1991, Throughput of a constant work in process manufacturing line subject to failures. International Journal of Production Research, 29, 635-655.
    • (1991) International Journal of Production Research , vol.29 , pp. 635-655
    • Hopp, W.J.1    Spearman, M.L.2
  • 17
    • 0031200164 scopus 로고    scopus 로고
    • Flow control in kanban based multicell manufacturing: I- A structural analysis of general blocking design space
    • Ramesh, R., Prasad, S.Y. and Thirumurthy, M.V., 1997, Flow control in kanban based multicell manufacturing: I: A structural analysis of general blocking design space. International Journal of Production Research, 35, 2327-2343.
    • (1997) International Journal of Production Research , vol.35 , pp. 2327-2343
    • Ramesh, R.1    Prasad, S.Y.2    Thirumurthy, M.V.3
  • 21
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M.L. and Zazanis, M.A., 1992, Push and pull production systems: issues and comparisons. Operations Research, 40, 521-532.
    • (1992) Operations Research , vol.40 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 24
    • 0025510925 scopus 로고
    • Scheduling networks of queues: Heavy traffic analysis of a two-station network with controllable inputs
    • Wein, L.M., 1990, Scheduling networks of queues: Heavy traffic analysis of a two-station network with controllable inputs. Operations Research, 38, 1065-1078.
    • (1990) Operations Research , vol.38 , pp. 1065-1078
    • Wein, L.M.1
  • 25
    • 0026859187 scopus 로고
    • Scheduling networks of queues: Heavy traffic analysis of a multistation network with controllable inputs
    • Wein, L.M., 1992, Scheduling networks of queues: heavy traffic analysis of a multistation network with controllable inputs. Operations Research, 40, S312-S334.
    • (1992) Operations Research , vol.40
    • Wein, L.M.1
  • 26


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.