메뉴 건너뛰기




Volumn 35, Issue 3, 1997, Pages 789-804

A comparison of production-line control mechanisms

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMOBILE MANUFACTURE; COMPUTER SIMULATION; OPTIMIZATION; PERFORMANCE; PRODUCTION;

EID: 0031095866     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497195713     Document Type: Article
Times cited : (209)

References (26)
  • 3
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J., 1992, A review of the kanban production control research literature. Production and Operations Management, 1(4), 393 -411.
    • (1992) Production and Operations Management , vol.1 , Issue.4
    • Berkley, B.J.1
  • 4
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bielecki, T. and Kumar, P. R., 1988, Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36(4), 532-541.
    • (1988) Operations Research , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 5
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks-a review and comparison
    • Buzacott, J. A. and Hanifin, L. E., 1978, Models of automatic transfer lines with inventory banks-a review and comparison. AIIE Transactions, 10(2), 197-207.
    • (1978) AIIE Transactions , vol.10 , Issue.2 , pp. 197-207
    • Buzacott, J.A.1    Hanifin, L.E.2
  • 6
    • 84987012950 scopus 로고
    • A general approach for coordinating production in multiple-cell manufacturing systems
    • Buzacott, J. A. and Shantikumar, J. G., 1992, A general approach for coordinating production in multiple-cell manufacturing systems. Production and Operations Management, 1(1), 34-52.
    • (1992) Production and Operations Management , vol.1 , Issue.1 , pp. 34-52
    • Buzacott, J.A.1    Shantikumar, J.G.2
  • 7
    • 0000879068 scopus 로고
    • Optimal policies for the multi-echelon inventory problem
    • Clark, A. J. and Scarf, H., 1960, Optimal policies for the multi-echelon inventory problem. Management Science, 6(4), 475 -490.
    • (1960) Management Science , vol.6 , Issue.4
    • Clark, A.J.1    Scarf, H.2
  • 8
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results. SpecialIssue on queuing models of manufacturing systems
    • Dallery, Y. and Gershwin, S. B., 1992, Manufacturing flow line systems: a review of models and analytical results. SpecialIssue on queuing models of manufacturing systems. Queuing Systems Theory and Applications, 12(1-2), 3-94.
    • (1992) Queuing Systems Theory and Applications , vol.12 , Issue.1-2 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 9
    • 3843115388 scopus 로고
    • An analytical method for performance evaluation of kanban controlled production systems
    • on new directions for operations management research, in press
    • Di Mascolo, M., Frein, Y. and Dallery, Y., 1994, An analytical method for performance evaluation of kanban controlled production systems. Operational Research, SpecialIssue on new directions for operations management research, in press.
    • (1994) Operational Research
    • Di Mascolo, M.1    Frein, Y.2    Dallery, Y.3
  • 10
    • 3543118988 scopus 로고
    • On the design of generalized kanban control systems
    • on modelling and analysis of just-in-time manufacturing systems, in press
    • Frein, Y., Di Mascolo, M. and Dallery, Y., 1994, On the design of generalized kanban control systems. International Journal of Operations and Production Management, SpecialIssue on modelling and analysis of just-in-time manufacturing systems, in press.
    • (1994) International Journal of Operations and Production Management
    • Frein, Y.1    Di Mascolo, M.2    Dallery, Y.3
  • 13
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J. and Gershwin, S. B., 1983, An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15(4), 353-362.
    • (1983) IIE Transactions , vol.15 , Issue.4 , pp. 353-362
    • Kimemia, J.1    Gershwin, S.B.2
  • 14
    • 84952179325 scopus 로고
    • Design and analysis of pull system, a method of multi-stage production control
    • Kimura, O. and Terada, H., 1981, Design and analysis of pull system, a method of multi-stage production control. International Journal of Production Research, 19(3), 241-253.
    • (1981) International Journal of Production Research , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 15
    • 0026923203 scopus 로고
    • Tandem queues with planned inventories
    • Lee, Y.-J. and Zipkin, P., 1992, Tandem queues with planned inventories. Operations Research, 40(5), 936-947.
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 936-947
    • Lee, Y.-J.1    Zipkin, P.2
  • 16
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines, part I
    • Mitra, D. and Mitrani, I., 1990, Analysis of a kanban discipline for cell coordination in production lines, part I. Management Science, 36(12), 1548-1566.
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 17
    • 0026223819 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines, Part II: Stochastic demands
    • Mitra, D. and Mitrani, I., 1991, Analysis of a kanban discipline for cell coordination in production lines, Part II: Stochastic demands. Operations Research, 39(5), 807-823.
    • (1991) Operations Research , vol.39 , Issue.5 , pp. 807-823
    • Mitra, D.1    Mitrani, I.2
  • 21
    • 0017557653 scopus 로고
    • Toyota production system and kanban system materialization of just-in-time and respect-for-human systems
    • Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S., 1977, Toyota production system and kanban system materialization of just-in-time and respect-for-human systems. International Journal of Production Research, 15(6), 553-564.
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 22
    • 0018986640 scopus 로고
    • Analysis of production ordering quantities and inventory variations in a multi-stage production ordering system
    • Tabe, T., Muramatsu, R. and Tanaka, Y., 1980, Analysis of production ordering quantities and inventory variations in a multi-stage production ordering system. International Journal of Production Research, 18(2), 245-257.
    • (1980) International Journal of Production Research , vol.18 , Issue.2 , pp. 245-257
    • Tabe, T.1    Muramatsu, R.2    Tanaka, Y.3
  • 23
    • 0027666614 scopus 로고
    • Production control for a tandem two-machine system
    • Van Ryzin, G., Lou, S. X. C. and Gershwin, S. B., 1993, Production control for a tandem two-machine system. IIE Transactions, 25(5), 5-20.
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 5-20
    • Van Ryzin, G.1    Lou, S.X.C.2    Gershwin, S.B.3
  • 24
    • 0028383504 scopus 로고
    • Optimal control of a two-station tandem production/ inventory system
    • Veatch, M. H. and Wein, L. M., 1994, Optimal control of a two-station tandem production/ inventory system. Operations Research, 42(2), 337-350.
    • (1994) Operations Research , vol.42 , Issue.2 , pp. 337-350
    • Veatch, M.H.1    Wein, L.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.