메뉴 건너뛰기




Volumn 11, Issue 2, 2000, Pages 157-167

Evolutionary approach to select a pull system among Kanban, Conwip and Hybrid

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; INVENTORY CONTROL; LEARNING ALGORITHMS; OPTIMIZATION; PROCESS ENGINEERING; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 0033749924     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1008938816257     Document Type: Article
Times cited : (79)

References (35)
  • 1
    • 0030784108 scopus 로고    scopus 로고
    • Control policies for multi-product multi-stage manufacturing systems: An experimental approach
    • Amin, M. and Altiok, T. (1997) Control policies for multi-product multi-stage manufacturing systems: an experimental approach. International Journal of Production Research, 35(1), 201-223.
    • (1997) International Journal of Production Research , vol.35 , Issue.1 , pp. 201-223
    • Amin, M.1    Altiok, T.2
  • 2
    • 84986958388 scopus 로고
    • A review of the Kanban production control research literature
    • Berkley, B. J. (1992) A review of the Kanban production control research literature. Production and Operations Management, 1(4), 393-411.
    • (1992) Production and Operations Management , vol.1 , Issue.4 , pp. 393-411
    • Berkley, B.J.1
  • 3
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J. W. M. (1983) The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3(2), 79-92.
    • (1983) Journal of Operations Management , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 6
    • 0024719991 scopus 로고
    • Queuing models of Kanban and MRP controlled production systems
    • Buzacott, J. A. (1989) Queuing models of Kanban and MRP controlled production systems. Engineering Cost and Production Economics, 17, 3-20.
    • (1989) Engineering Cost and Production Economics , vol.17 , pp. 3-20
    • Buzacott, J.A.1
  • 8
    • 0000053668 scopus 로고
    • A new Kanban-type pull control mechanism for multi-stage manufacturing systems
    • Rome, September 5-8
    • Dallery, Y. and Liberopoulos, G. (1995) A new Kanban-type pull control mechanism for multi-stage manufacturing systems, Proceedings of the 3rd European Control Conference, Rome, September 5-8, 4(2), 3543-3548.
    • (1995) Proceedings of the 3rd European Control Conference , vol.4 , Issue.2 , pp. 3543-3548
    • Dallery, Y.1    Liberopoulos, G.2
  • 9
    • 0023345352 scopus 로고
    • Configuring a Kanban system using a discrete optimization of multiple stochastic responses
    • Davis, W. J. and Stubitz, S. J. (1987) Configuring a Kanban system using a discrete optimization of multiple stochastic responses, International Journal of Production Research, 25(5), 721-740.
    • (1987) International Journal of Production Research , vol.25 , Issue.5 , pp. 721-740
    • Davis, W.J.1    Stubitz, S.J.2
  • 16
    • 0024607145 scopus 로고
    • A system dynamic model for multi-stage multi-line dual-card JIT-Kanban system
    • Gupta, P. Y. and Gupta, C. M. (1989) A system dynamic model for multi-stage multi-line dual-card JIT-Kanban system. International Journal of Production Research, 27, 309-352.
    • (1989) International Journal of Production Research , vol.27 , pp. 309-352
    • Gupta, P.Y.1    Gupta, C.M.2
  • 18
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese Just-In-Time technique (with Kanbans) for a multiline, multistage production system
    • Huang, P. Y., Rees, L. P. and Taylor, B. W. (1983) A simulation analysis of the Japanese Just-In-Time technique (with Kanbans) for a multiline, multistage production system. Decision Sciences, 14(3), 326-344.
    • (1983) Decision Sciences , vol.14 , Issue.3 , pp. 326-344
    • Huang, P.Y.1    Rees, L.P.2    Taylor, B.W.3
  • 19
    • 84952179325 scopus 로고
    • Design and analysis of pull system, a method of multi-stage production control
    • Kimura, O. and Terada, H. (1981) Design and analysis of pull system, a method of multi-stage production control. International Journal of Production Research, 19(3), 241-253.
    • (1981) International Journal of Production Research , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 21
    • 0001831793 scopus 로고
    • How Toyota shortened lot production time, waiting time and conveyance time
    • Monden, Y. (1981) How Toyota shortened lot production time, waiting time and conveyance time. Industrial Engineer, 13, 22-30.
    • (1981) Industrial Engineer , vol.13 , pp. 22-30
    • Monden, Y.1
  • 23
    • 0012664009 scopus 로고    scopus 로고
    • Une méthode d’optimisation-simulation par algorithme évolutionniste en gestion de production juste-à-temps
    • Paris, J. L., Pierreval, H. and Tautou, L. (1996) Une méthode d’optimisation-simulation par algorithme évolutionniste en gestion de production juste-à-temps. Journal Européen des Systèmes Automatisés (JESA), 30(7), 929-944.
    • (1996) Journal Européen des Systèmes Automatisés (JESA) , vol.30 , Issue.7 , pp. 929-944
    • Paris, J.L.1    Pierreval, H.2    Tautou, L.3
  • 24
    • 0031098736 scopus 로고    scopus 로고
    • Using evolutionary algorithms and simulation for the optimization of manufacturing systems
    • Pierreval, H. and Tautou, L. (1997) Using evolutionary algorithms and simulation for the optimization of manufacturing systems. IIE Transactions, 29(3), 181-189.
    • (1997) IIE Transactions , vol.29 , Issue.3 , pp. 181-189
    • Pierreval, H.1    Tautou, L.2
  • 29
    • 0022111332 scopus 로고
    • Just-In-Time (JIT), with Kanban, manufacturing system simulation on a microcomputer
    • Schroer, B. J., Black, J. T. and Zhang, S. X. (1985) Just-In-Time (JIT), with Kanban, manufacturing system simulation on a microcomputer. Simulation, 45(2), 62-70.
    • (1985) Simulation , vol.45 , Issue.2 , pp. 62-70
    • Schroer, B.J.1    Black, J.T.2    Zhang, S.X.3
  • 31
    • 32144463959 scopus 로고
    • Production rates, flow times and work in process levels in a generalized pull production system
    • Department of Industrial Engineering and Management Sciences, Northwestern University, Evanstin IL, Department of Industrial Engineering, Texas A&M University, College Station, TX
    • Spearman, M. L. and Hogg, G. L. (1986) Production rates, flow times and work in process levels in a generalized pull production system. Manuscript, Department of Industrial Engineering and Management Sciences, Northwestern University, Evanstin IL, Department of Industrial Engineering, Texas A&M University, College Station, TX.
    • (1986) Manuscript
    • Spearman, M.L.1    Hogg, G.L.2
  • 34
    • 0017557653 scopus 로고
    • Toyota production system and Kanban system materialization of just-in-time and respect-for-human system
    • Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S. (1977) Toyota production system and Kanban system materialization of just-in-time and respect-for-human system. International Journal of Production Research, 15(6), 553-564.
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 35
    • 0024108248 scopus 로고
    • Increasing the production rate of a just-in-time production system with variable operation times
    • Villeda, R., Dudek, R. and Smith, M. L. (1988) Increasing the production rate of a just-in-time production system with variable operation times. International Journal of Production Research, 26, 1749-1768.
    • (1988) International Journal of Production Research , vol.26 , pp. 1749-1768
    • Villeda, R.1    Dudek, R.2    Smith, M.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.