메뉴 건너뛰기




Volumn 20, Issue 8, 2009, Pages 785-800

Production and changeover control policies of a class of failure prone buffered flow-shops

Author keywords

Buffered flow shops; Numerical methods; Production and setup control; Production control; Real time scheduling; Stochastic dynamic programming

Indexed keywords

BREAKDOWNS AND REPAIRS; BUFFERED FLOW-SHOPS; COMPLEX FLOW; CONTINUOUS DYNAMICS; CONTROL POLICY; FLOW-SHOPS; HEURISTIC POLICIES; MANUFACTURING SYSTEM; NUMERICAL SCHEME; OPTIMAL POLICIES; OPTIMALITY CONDITIONS; PRODUCTION PLANS; REAL-TIME SCHEDULING; RESEARCH STUDIES; SERIAL MACHINE; SET-UP TIME; STOCHASTIC DYNAMIC PROGRAMMING; STOCHASTIC OPTIMAL CONTROL PROBLEM; SYSTEM STATE;

EID: 70449408043     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280903232354     Document Type: Article
Times cited : (10)

References (24)
  • 1
    • 0031103568 scopus 로고    scopus 로고
    • Scheduling of flexible flow lines in an automobile assembly plant
    • Agnetis, A., et al., 1997. Scheduling of flexible flow lines in an automobile assembly plant. European Journal of Operational Research, 97, 348-362.
    • (1997) European Journal of Operational Research , vol.97 , pp. 348-362
    • Agnetis, A.1
  • 2
    • 0043223939 scopus 로고    scopus 로고
    • Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns
    • Bai, S.X., et al., 1996. Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns. OR Spectrum, 18, 81-96.
    • (1996) OR Spectrum , vol.18 , pp. 81-96
    • Bai, S.X.1
  • 6
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas, C.A. and Lin, X., 2004. Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering, 28, 2109-2129.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 7
    • 30844471148 scopus 로고    scopus 로고
    • Operational level-based policies in production rate control of unreliable manufacturing systems with setups
    • Gharbi, A., Kenne, J.P., and Hajji, A., 2006. Operational level-based policies in production rate control of unreliable manufacturing systems with setups. International Journal of Production Research, 44 (3), 545-567.
    • (2006) International Journal of Production Research , vol.44 , Issue.3 , pp. 545-567
    • Gharbi, A.1    Kenne, J.P.2    Hajji, A.3
  • 8
    • 0030170411 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
    • Guinet, A.G.P. and Solomon, M., 1996. Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time. International Journal of Production Research, 34 (6), 1643-1654.
    • (1996) International Journal of Production Research , vol.34 , Issue.6 , pp. 1643-1654
    • Guinet, A.G.P.1    Solomon, M.2
  • 10
    • 1242265221 scopus 로고    scopus 로고
    • Production and setup control of a failure prone manufacturing system
    • Hajji, A, Gharbi, A., and Kenne, J.P., 2004. Production and setup control of a failure prone manufacturing system. International Journal of Production Research, 42 (6), 1107-1130.
    • (2004) International Journal of Production Research , vol.42 , Issue.6 , pp. 1107-1130
    • Hajji, A.1    Gharbi, A.2    Kenne, J.P.3
  • 11
    • 70449385392 scopus 로고    scopus 로고
    • Joint optimal production/setup policies for three family products in unreliable supply chains
    • Beijing, China, 30 May-2 June, [CD-ROM]
    • Hajji, A., Gharbi, A., and Kenne, J.P. 2007. Joint optimal production/setup policies for three family products in unreliable supply chains. In: Proceedings of IESM 2007, Beijing, China, 30 May-2 June, [CD-ROM] 327.
    • (2007) Proceedings of IESM 2007 , pp. 327
    • Hajji, A.1    Gharbi, A.2    Kenne, J.P.3
  • 12
    • 70449424754 scopus 로고    scopus 로고
    • Joint replenishment and manufacturing activities control in two stage unreliable supply chain
    • Hajji, A., Gharbi, A., and Kenne, J.P., 2009. Joint replenishment and manufacturing activities control in two stage unreliable supply chain. International Journal of Production Research, 47 (12), 3231-3251.
    • (2009) International Journal of Production Research , vol.47 , Issue.12 , pp. 3231-3251
    • Hajji, A.1    Gharbi, A.2    Kenne, J.P.3
  • 14
    • 58249092203 scopus 로고    scopus 로고
    • Optimization of production control policies in failure prone homogenous transfer lines
    • Lavoie, P., Kenné , J.-P., and Gharbi, A., 2009. Optimization of production control policies in failure prone homogenous transfer lines. IIE Transactions, 4 (3), 209-222.
    • (2009) IIE Transactions , vol.4 , Issue.3 , pp. 209-222
    • Lavoie, P.1    Kenné, J.-P.2    Gharbi, A.3
  • 17
    • 0031250948 scopus 로고    scopus 로고
    • Existence of optimal feedback production plans in stochastic flowshops with limited buffers
    • Presman, E., Sethi, S., and Suo, W., 1997. Existence of optimal feedback production plans in stochastic flowshops with limited buffers. Automatica, 33 (10), 1899-1903.
    • (1997) Automatica , vol.33 , Issue.10 , pp. 1899-1903
    • Presman, E.1    Sethi, S.2    Suo, W.3
  • 18
    • 0029378614 scopus 로고
    • Optimal feedback production planning in a stochastic N-machine flowshop
    • Presman, E., Sethi, S., and Zhang, Q., 1995. Optimal feedback production planning in a stochastic N-machine flowshop. Automatica, 31 (9), 1325-1332.
    • (1995) Automatica , vol.31 , Issue.9 , pp. 1325-1332
    • Presman, E.1    Sethi, S.2    Zhang, Q.3
  • 19
    • 70449453954 scopus 로고    scopus 로고
    • On Optimality of Stochastic N-machine Flowshop with Long-run Average Cost
    • B. Pasik-Duncan, ed, LNCIS 280. Berlin, Heidelberg: Springer-Verlag
    • Presman, E., et al., 2002. On optimality of stochastic N-machine flowshop with long-run average cost. In: B. Pasik-Duncan, ed. Stochastic theory and control, LNCIS 280. Berlin, Heidelberg: Springer-Verlag, 399-417.
    • (2002) Stochastic Theory and Control , pp. 399-417
    • Presman, E.1
  • 20
    • 33751071385 scopus 로고    scopus 로고
    • A taxonomy of flexible flow line scheduling procedures
    • Quadt, D. and Kuhn, H., 2007. A taxonomy of flexible flow line scheduling procedures. European Journal of Operational Research, 178, 686-698.
    • (2007) European Journal of Operational Research , vol.178 , pp. 686-698
    • Quadt, D.1    Kuhn, H.2
  • 21
    • 0742286690 scopus 로고    scopus 로고
    • Decomposition/ aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines
    • Sadr, J. and Malhame, R.P., 2004. Decomposition/ aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines. IEEE Transactions on Automatic Control, 49 (1), 68-81.
    • (2004) IEEE Transactions on Automatic Control , vol.49 , Issue.1 , pp. 68-81
    • Sadr, J.1    Malhame, R.P.2
  • 22
    • 0034311173 scopus 로고    scopus 로고
    • Hierarchical production control in a stochastic N-machine flowshop with long-run average cost
    • Sethi, S.P., Zhang, H., and Zhang, Q., 2000. Hierarchical production control in a stochastic N-machine flowshop with long-run average cost. Journal of Mathematical Analysis and Applications, 251, 285-309.
    • (2000) Journal of Mathematical Analysis and Applications , vol.251 , pp. 285-309
    • Sethi, S.P.1    Zhang, H.2    Zhang, Q.3
  • 23
    • 0024016313 scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • Wittrock, R.J., 1988. An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36 (4), 445-453.
    • (1988) Operations Research , vol.36 , Issue.4 , pp. 445-453
    • Wittrock, R.J.1
  • 24
    • 33750699292 scopus 로고    scopus 로고
    • Dynamic programming solution to the batching problem in just-in-time flowshops
    • Yavuz, M. and Tufekci, S., 2006. Dynamic programming solution to the batching problem in just-in-time flowshops. Computers & Industrial Engineering, 51, 416-432.
    • (2006) Computers & Industrial Engineering , vol.51 , pp. 416-432
    • Yavuz, M.1    Tufekci, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.