메뉴 건너뛰기




Volumn 14, Issue 1, 2003, Pages 15-32

An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios

Author keywords

Bottleneck flow control; CONWIP; Drum buffer rope; Dynamic flow control; Output flow control

Indexed keywords

ENTERPRISE RESOURCE PLANNING; FEEDBACK; MARKETING;

EID: 0142258726     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/0953728021000039416     Document Type: Article
Times cited : (18)

References (31)
  • 2
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • BAKER, K. R., 1984, The effects of input control in a simple scheduling model. Journal of Operations Management, 4(2), 99-112.
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 4
    • 0036610796 scopus 로고    scopus 로고
    • Designing unbalanced lines - Understanding protective capacity and protective inventory
    • 2002
    • BLACKSTONE, J. H., and Cox, J. F., 2002, Designing unbalanced lines - understanding protective capacity and protective inventory, Production Planning and Control, 2002, Vol. 13, No. 4, pp. 416-423.
    • (2002) Production Planning and Control , vol.13 , Issue.4 , pp. 416-423
    • Blackstone, J.H.1    Cox, J.F.2
  • 5
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • BLACKSTONE, J. H., PHILLIPS, D. T., and HOGG, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20(1), 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 7
    • 0022744002 scopus 로고
    • Performance analysis modeling for manufacturing systems
    • FREDERICKS, A. A., 1986, Performance analysis modeling for manufacturing systems. AT&T Technical Journal, 65(4), 25-34.
    • (1986) AT&T Technical Journal , vol.65 , Issue.4 , pp. 25-34
    • Fredericks, A.A.1
  • 10
    • 0003710588 scopus 로고
    • Croton-on-Hudson, NY: North River Press, Inc.
    • GOLDRATT, E. M., and Fox, R. E., 1986, The Race (Croton-on-Hudson, NY: North River Press, Inc.).
    • (1986) The Race
    • Goldratt, E.M.1    Fox, R.E.2
  • 12
    • 0037051313 scopus 로고    scopus 로고
    • TOC-based performance measures and five focusing steps in a job-shop manufacturing environment
    • GUPTA, M. C., Ko, H. J., and MIN, H., 2002, TOC-based performance measures and five focusing steps in a job-shop manufacturing environment. International Journal of Production Research, 40(4), 907-930.
    • (2002) International Journal of Production Research , vol.40 , Issue.4 , pp. 907-930
    • Gupta, M.C.1    Ko, H.J.2    Min, H.3
  • 13
    • 0026119502 scopus 로고
    • Throughput of a constant work-in-process manufacturing line subject to failures
    • HOPP, W. J., and SPEARMAN, M. L., 1991, Throughput of a constant work-in-process manufacturing line subject to failures. International Journal of Production Research, 29(3), 635-655.
    • (1991) International Journal of Production Research , vol.29 , Issue.3 , pp. 635-655
    • Hopp, W.J.1    Spearman, M.L.2
  • 14
    • 38249027443 scopus 로고
    • Load-limited order release in job shop scheduling systems
    • KANET, J. J., 1988, Load-limited order release in job shop scheduling systems. Journal of Operations Management, 7(3), 44-58.
    • (1988) Journal of Operations Management , vol.7 , Issue.3 , pp. 44-58
    • Kanet, J.J.1
  • 18
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job-shop environment
    • RAGANTZ, G. L., and MABERT, V. A., 1989, An evaluation of order release mechanisms in a job-shop environment. Decision Sciences Journal, 19(1), 167-189.
    • (1989) Decision Sciences Journal , vol.19 , Issue.1 , pp. 167-189
    • Ragantz, G.L.1    Mabert, V.A.2
  • 20
    • 0025657214 scopus 로고
    • Synchronized manufacturing as in OPT: From practice to theory
    • RONEN, B., and STARR, M. K., 1990, Synchronized manufacturing as in OPT: from practice to theory. Computers and Industrial Engineering, 18(4), 585-600.
    • (1990) Computers and Industrial Engineering , vol.18 , Issue.4 , pp. 585-600
    • Ronen, B.1    Starr, M.K.2
  • 22
    • 0142235519 scopus 로고
    • Application of work centre control rules in a job shop environment
    • SEAGLE, J. P., and FISK, J. C., 1982, Application of work centre control rules in a job shop environment. Journal of Operations Management, 3(1), 43-48.
    • (1982) Journal of Operations Management , vol.3 , Issue.1 , pp. 43-48
    • Seagle, J.P.1    Fisk, J.C.2
  • 24
    • 0000996514 scopus 로고
    • Customer service in pull production systems
    • SPEARMAN, M. L., 1992, Customer service in pull production systems. Operations Research, 40(5), 948-958.
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 948-958
    • Spearman, M.L.1
  • 25
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • SPEARMAN, M. L., and ZAZANIS, M. A., 1992, Push and pull production systems: Issues and comparisons. Operations Research, 40(3), 521-532.
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 31
    • 0002112447 scopus 로고
    • The statistical analysis of simulation results
    • S. S. Lavenberg (Ed.), Academic Press
    • WELCH, P. D., 1983, The statistical analysis of simulation results. In S. S. Lavenberg (Ed.) Computer Performance Modeling Handbook, (Academic Press).
    • (1983) Computer Performance Modeling Handbook
    • Welch, P.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.