메뉴 건너뛰기




Volumn 20, Issue 4, 1997, Pages 268-277

Dispatching scheme involving move control and weighted due date for wafer foundries

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; DECISION MAKING; FOUNDRIES; GENETIC ALGORITHMS; MANUFACTURE; MOTION CONTROL; PERFORMANCE;

EID: 0031246942     PISSN: 10834400     EISSN: None     Source Type: Journal    
DOI: 10.1109/3476.650956     Document Type: Article
Times cited : (12)

References (35)
  • 1
    • 0028585426 scopus 로고
    • I. M. Ovacik R. Uzsoy Exploiting shop floor status information to schedule complex job shops J. Manufact. Syst. 13 73 84 1994
    • (1994) , vol.13 , pp. 73-84
    • Ovacik, I.M.1    Uzsoy, R.2
  • 2
    • 0030257827 scopus 로고    scopus 로고
    • I. M. Ovacik R. Uzsoy Decomposition methods for scheduling semiconductor testing facilities Int. J. Flexible Manufact. Syst. 8 357 388 1996
    • (1996) , vol.8 , pp. 357-388
    • Ovacik, I.M.1    Uzsoy, R.2
  • 3
    • 84952240555 scopus 로고
    • R. Uzsoy C. Y. Lee L. A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry, Part I: System characteristics, performance evaluation and production planning IIE Trans. 24 4 47 60 1992
    • (1992) , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 4
    • 0023964289 scopus 로고
    • C. R. Glassey M. Resende Closed-loop job release control for VLSI circuit manufacturing IEEE Trans. Semiconduct. Manufact. 1 36 46 Feb. 1988 66 240 4371
    • (1988) , vol.1 , pp. 36-46
    • Glassey, C.R.1    Resende, M.2
  • 5
    • 85176688029 scopus 로고
    • P. R. Kumar Scheduling semiconductor manufacturing plants IEEE Contr. Syst. 33 40 Dec. 1994 37 7864 334413
    • (1994) , pp. 33-40
    • Kumar, P.R.1
  • 6
    • 0030150549 scopus 로고    scopus 로고
    • Y. F. Hung R. C. Leachman A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations IEEE Trans. Semiconduct. Manufact. 9 257 269 May 1996 66 10608 492820
    • (1996) , vol.9 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 7
    • 0030150598 scopus 로고    scopus 로고
    • H. Yan S. Lou S. Sethi A. Gardel P. Deosthali Testing the robustness of two-boundary control policies in semiconductor manufacturing IEEE Trans. Semiconduct. Manufact. 9 285 288 May 1996 66 10608 492825
    • (1996) , vol.9 , pp. 285-288
    • Yan, H.1    Lou, S.2    Sethi, S.3    Gardel, A.4    Deosthali, P.5
  • 8
    • 0028496979 scopus 로고
    • R. Uzsoy C. Y. Lee L. A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry Part II: Shop floor control IIE Trans. 26 44 55 1994
    • (1994) , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 9
    • 0024055865 scopus 로고
    • L. M. Wein Scheduling semiconductor wafer fabrication IEEE Trans. Semiconduct. Manufact. 1 115 130 Aug. 1988 66 242 4384
    • (1988) , vol.1 , pp. 115-130
    • Wein, L.M.1
  • 10
    • 85176678803 scopus 로고
    • Wiley New York
    • K. Baker Introduction to Sequencing and Scheduling 1974 Wiley New York
    • (1974)
    • Baker, K.1
  • 11
    • 0003054955 scopus 로고
    • S. S. Panwalkar W. Iskander A survey of scheduling rules Oper. Res. 25 1 45 61 1977
    • (1977) , vol.25 , Issue.1 , pp. 45-61
    • Panwalkar, S.S.1    Iskander, W.2
  • 12
    • 0025430088 scopus 로고
    • Y. Kim A comparison of dispatching rules for job shops with multiple identical jobs, and alternative routings Int. J. Prod. Res. 28 953 962 1990
    • (1990) , vol.28 , pp. 953-962
    • Kim, Y.1
  • 13
    • 85176687191 scopus 로고
    • Macmillan U.K., Manchester
    • J. McCartney B. K. Hinds Iterative scheduling procedures for flexible manufacturing systems Proc. 22nd Int. Mach. Tool Design Res. Conf. 47 54 Sept. 1981 Macmillan U.K., Manchester
    • (1981) , pp. 47-54
    • McCartney, J.1    Hinds, B.K.2
  • 14
    • 84952242943 scopus 로고
    • K. E. Stecke J. J. Solberg Loading and control policy for a flexible manufacturing system Int. J. Prod. Res. 19 5 481 490 1981
    • (1981) , vol.19 , Issue.5 , pp. 481-490
    • Stecke, K.E.1    Solberg, J.J.2
  • 15
    • 0025416939 scopus 로고
    • M. Montazeri L. N. van Wassenhove Analysis of scheduling rules for an FMS Int. J. Prod. Res. 28 4 785 802 1990
    • (1990) , vol.28 , Issue.4 , pp. 785-802
    • Montazeri, M.1    van Wassenhove, L.N.2
  • 16
    • 0030782894 scopus 로고    scopus 로고
    • O. Holthaus C. Rajendran Efficient dispatching rules for scheduling in a job shop Int. J. Prod. Econ. 48 87 105 1997
    • (1997) , vol.48 , pp. 87-105
    • Holthaus, O.1    Rajendran, C.2
  • 17
    • 85176672452 scopus 로고    scopus 로고
    • Taiwan, R.O.C., Hsinchu
    • C. H. Hung C. M. Liu T. Chen Managing on time delivery during foundry fab production ramp-up 1996 Semiconduct. Manufact. Technol. Workshop 18 39 22𔃋 Oct. 1996 Taiwan, R.O.C., Hsinchu
    • (1996) , pp. 18-39
    • Hung, C.H.1    Liu, C.M.2    Chen, T.3
  • 18
    • 0030084325 scopus 로고    scopus 로고
    • S. Li T. Tang D. W. Collins Minimum inventory variability schedule with applications in semiconductor fabrication IEEE Trans. Semiconduct. Manufact. 9 145 149 Feb. 1996 66 10241 484296
    • (1996) , vol.9 , pp. 145-149
    • Li, S.1    Tang, T.2    Collins, D.W.3
  • 19
    • 85176691568 scopus 로고    scopus 로고
    • Taiwan, R.O.C., Hsinchu
    • J. S. Wu J. M. Lin An application of genetic algorithm in scheduling problem of wafer probe center June 1996 Master's thesis Taiwan, R.O.C., Hsinchu
    • (1996)
    • Wu, J.S.1    Lin, J.M.2
  • 20
    • 0023868237 scopus 로고
    • S. D. Wu R. A. Wysk Multi-pass expert control system̵A control/scheduling for flexible manufacturing cells J. Manufact. Syst. 7 107 120 1988
    • (1988) , vol.7 , pp. 107-120
    • Wu, S.D.1    Wysk, R.A.2
  • 21
    • 0024731596 scopus 로고
    • S. D. Wu R. A. Wysk An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing Int. J. Prod. Res. 27 9 1603 1623 1989
    • (1989) , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, S.D.1    Wysk, R.A.2
  • 22
    • 0026374056 scopus 로고
    • N. Ishii J. Talavage A transient-based real-time scheduling algorithm in FMS Int. J. Prod. Res. 29 12 2501 2520 1991
    • (1991) , vol.29 , Issue.12 , pp. 2501-2520
    • Ishii, N.1    Talavage, J.2
  • 23
    • 85176671423 scopus 로고
    • A. Thesen L. Lei An expert scheduling system for material handling hoists J. Manufact. Syst. 9 3 247 252 1988
    • (1988) , vol.9 , Issue.3 , pp. 247-252
    • Thesen, A.1    Lei, L.2
  • 24
    • 0001403883 scopus 로고
    • Y. Yih Trace-driven knowledge acquisition for rule-based real time scheduling J. Intell. Manufact. 1 217 230 1990
    • (1990) , vol.1 , pp. 217-230
    • Yih, Y.1
  • 25
    • 0026819312 scopus 로고
    • S. Nakasuka T. Yoshida Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool Int. J. Prod. Res. 30 2 411 431 1992
    • (1992) , vol.30 , Issue.2 , pp. 411-431
    • Nakasuka, S.1    Yoshida, T.2
  • 26
    • 0029404744 scopus 로고
    • C. Chiu Y. Yih A learning-based methodology for dynamic scheduling in distributed manufacturing systems Int. J. Prod. Res. 33 11 3217 3232 1995
    • (1995) , vol.33 , Issue.11 , pp. 3217-3232
    • Chiu, C.1    Yih, Y.2
  • 27
    • 85176690320 scopus 로고
    • J. J. Golovin A total framework for semiconductor production planning and scheduling Solid State Technol. 167 170 May 1986
    • (1986) , pp. 167-170
    • Golovin, J.J.1
  • 28
    • 0030241820 scopus 로고    scopus 로고
    • T. Murata H. Ishibuchi H. Tanaka Multi-objective genetic algorithm and its applications to flowshop scheduling Comput. Industr. Eng. 30 4 957 968 1996
    • (1996) , vol.30 , Issue.4 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 29
    • 85176683663 scopus 로고    scopus 로고
    • Kluwer MA, Norwell
    • I. M. Ovacik R. Uzsoy Decomposition Methods for Complex Factory Scheduling Problems 1997 Kluwer MA, Norwell
    • (1997)
    • Ovacik, I.M.1    Uzsoy, R.2
  • 30
    • 0024765326 scopus 로고
    • S. Lou P. W. Kager A robust production control policy for VLSI wafer fabrication IEEE Trans. Semiconduct. Manufact. 2 159 164 1989 66 1695 44620
    • (1989) , vol.2 , pp. 159-164
    • Lou, S.1    Kager, P.W.2
  • 31
    • 0008197170 scopus 로고
    • Production planning and scheduling practice across the semiconductor industry
    • OR Center, Univ. California Berkeley
    • R. C. Leachman Production planning and scheduling practice across the semiconductor industry 1994 OR Center, Univ. California Berkeley ERSC Rep. 94-29/CSM-18
    • (1994)
    • Leachman, R.C.1
  • 32
    • 0025430443 scopus 로고
    • M. L. Spearman D. L. Woodruff W. J. Hopp CONWIP. A pull alternative to Kanban Int. J. Prod. Res. 28 5 879 894 1990
    • (1990) , vol.28 , Issue.5 , pp. 879-894
    • Spearman, M.L.1    Woodruff, D.L.2    Hopp, W.J.3
  • 33
    • 0028481114 scopus 로고
    • S. C. H. Lu D. Ramaswamy P. R. Kumar Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants IEEE Trans. Semiconduct. Manufact. 7 374 388 Aug. 1994 66 7544 311341
    • (1994) , vol.7 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 34
    • 0020013653 scopus 로고
    • J. H. J. R. Blackstone D. Phillips G. Hogg A state-of-the-art survey of dispatching rules for manufacturing job shop operations Int. J. Prod. Res. 20 27 45 1982
    • (1982) , vol.20 , pp. 27-45
    • Blackstone, J.H.J.R.1    Phillips, D.2    Hogg, G.3
  • 35
    • 0000658024 scopus 로고
    • J. C. Hershauer J. Ebert Search and simulation selection of a job shop scheduling rule Manage. Sci. 21 7 833 843 1975
    • (1975) , vol.21 , Issue.7 , pp. 833-843
    • Hershauer, J.C.1    Ebert, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.