메뉴 건너뛰기




Volumn 49, Issue 6, 2011, Pages 1511-1529

Lean-pull strategy in a re-entrant manufacturing environment: A pilot study for TFT-LCD array manufacturing

Author keywords

AMHS; buffer; CONWIP; lean pull strategy; simulation optimisation; TFT LCD

Indexed keywords

AMHS; BUFFER; CONWIP; LEAN-PULL STRATEGY; SIMULATION OPTIMISATION; TFT-LCDS;

EID: 78650604892     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903567333     Document Type: Article
Times cited : (33)

References (45)
  • 1
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean production and value stream mapping via simulation: A process sector case study
    • Abdulmalek, F.A. and Rajgopal, J., 2007. Analyzing the benefits of lean production and value stream mapping via simulation: a process sector case study. International Journal of Production Economics, 107 (1), 223-236.
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 2
    • 0033078286 scopus 로고    scopus 로고
    • Simulation optimization with qualitative variables and structural model changes: A genetic algorithm approach
    • Azadivar, F. and Tompkins, G., 1999. Simulation optimization with qualitative variables and structural model changes: a genetic algorithm approach. European Journal of Operational Research, 113 (1), 169-182.
    • (1999) European Journal of Operational Research , vol.113 , Issue.1 , pp. 169-182
    • Azadivar, F.1    Tompkins, G.2
  • 3
    • 0000025394 scopus 로고    scopus 로고
    • Scheduling manufacturing systems with work-in-process inventory control: Reentrant systems
    • Bai, S.X. and Gershwin, S.B., 1996. Scheduling manufacturing systems with work-in-process inventory control: reentrant systems. OR Spectrum, 18 (4), 187-195.
    • (1996) OR Spectrum , vol.18 , Issue.4 , pp. 187-195
    • Bai, S.X.1    Gershwin, S.B.2
  • 4
    • 0037334899 scopus 로고    scopus 로고
    • A framework for simulation-optimization software
    • Boesel, J., Nelson, B.L., and Ishii, N., 2003a. A framework for simulation-optimization software. IIE Transactions, 35 (3), 221-229.
    • (2003) IIE Transactions , vol.35 , Issue.3 , pp. 221-229
    • Boesel, J.1    Nelson, B.L.2    Ishii, N.3
  • 5
    • 0347556828 scopus 로고    scopus 로고
    • Using ranking and selection to clean up after simulation-optimization
    • Boesel, J., Nelson, B.L., and Kim, S.H., 2003b. Using ranking and selection to clean up after simulation-optimization. Operations Research, 51 (5), 814-825.
    • (2003) Operations Research , vol.51 , Issue.5 , pp. 814-825
    • Boesel, J.1    Nelson, B.L.2    Kim, S.H.3
  • 8
  • 9
    • 0033749924 scopus 로고    scopus 로고
    • An evolutionary approach to select a pull system among kanban, CONWIP and hybrid
    • Gaury, E.G.A., Pierreval, H., and Kleijnen, P.C., 2000. An evolutionary approach to select a pull system among kanban, CONWIP and hybrid. Journal of Intelligent Manufacturing, 11 (2), 157-167.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.2 , pp. 157-167
    • Gaury, E.G.A.1    Pierreval, H.2    Kleijnen, P.C.3
  • 10
    • 0030418937 scopus 로고    scopus 로고
    • New advances and applications of combining simulation and optimization
    • 11 December, Coronado, California
    • Glover, F., Kelly, J.P., and Laguna, M., 1996. New advances and applications of combining simulation and optimization. In: Proceedings of the 28th conference on winter simulation, 11 December, Coronado, California, 144-152.
    • (1996) Proceedings of the 28th Conference on Winter Simulation , pp. 144-152
    • Glover, F.1    Kelly, J.P.2    Laguna, M.3
  • 11
    • 0347899800 scopus 로고    scopus 로고
    • Fundamentals of scatter search and path relinking
    • Glover, F. and Laguna, M., 2000. Fundamentals of scatter search and path relinking. Control and Cybernetics, 29 (3), 653-684.
    • (2000) Control and Cybernetics , vol.29 , Issue.3 , pp. 653-684
    • Glover, F.1    Laguna, M.2
  • 14
    • 61449233284 scopus 로고    scopus 로고
    • Extent of the use of lean concepts proposed for a value stream mapping application
    • Ibon, S.L., Rodolfo, D.C., and Carlos, L., 2009. Extent of the use of lean concepts proposed for a value stream mapping application. Production Planning and Control, 20 (1), 82-98.
    • (2009) Production Planning and Control , vol.20 , Issue.1 , pp. 82-98
    • Ibon, S.L.1    Rodolfo, D.C.2    Carlos, L.3
  • 15
    • 33847040477 scopus 로고    scopus 로고
    • Make-to-order scheduling in foundry semiconductor fabrication
    • Kang, K.H. and Lee, Y.H., 2007. Make-to-order scheduling in foundry semiconductor fabrication. International Journal of Production Research, 45 (3), 615-630.
    • (2007) International Journal of Production Research , vol.45 , Issue.3 , pp. 615-630
    • Kang, K.H.1    Lee, Y.H.2
  • 17
    • 33847084681 scopus 로고    scopus 로고
    • Effectiveness of vehicle reassignment in a large-scale overhead hoist transport system
    • Kim, B., et al., 2007. Effectiveness of vehicle reassignment in a large-scale overhead hoist transport system. International Journal of Production Research, 45 (4), 789-801.
    • (2007) International Journal of Production Research , vol.45 , Issue.4 , pp. 789-801
    • Kim, B.1
  • 18
    • 52649138438 scopus 로고    scopus 로고
    • Robust production control policies considering WIP balance and setup time in a semiconductor fabrication line
    • Kim, S., Lee, Y.H., and Yang, T., 2008. Robust production control policies considering WIP balance and setup time in a semiconductor fabrication line. International Journal of Advanced Manufacturing Technology, 39 (3-4), 333-343.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.39 , Issue.3-4 , pp. 333-343
    • Kim, S.1    Lee, Y.H.2    Yang, T.3
  • 19
    • 77952622121 scopus 로고    scopus 로고
    • An exploratory study of protective inventory in a re-entrant line with protective capacity
    • doi: 10.1080/00207540902991666.[In press]
    • Kim, S., Cox, J.F., and Mabin, V., 2009. An exploratory study of protective inventory in a re-entrant line with protective capacity. International Journal of Production Research, doi: 10.1080/ 00207540902991666. [In press].
    • (2009) International Journal of Production Research
    • Kim, S.1    Cox, J.F.2    Mabin, V.3
  • 21
    • 34249027911 scopus 로고    scopus 로고
    • Analyzing the effects of lean production using a value stream mapping-based simulation generator
    • Lian, Y.H. and Landeghem, H.V., 2007. Analyzing the effects of lean production using a value stream mapping-based simulation generator. International Journal of Production Research, 45 (13), 3037-3058.
    • (2007) International Journal of Production Research , vol.45 , Issue.13 , pp. 3037-3058
    • Lian, Y.H.1    Landeghem, H.V.2
  • 23
    • 3142592494 scopus 로고    scopus 로고
    • Virtual vehicle in the connecting transport automated material handling system
    • Lin, J.T., Wang, C.K., and Young, J.R., 2004. Virtual vehicle in the connecting transport automated material handling system. International Journal of Production Research, 42 (13), 2599-2610.
    • (2004) International Journal of Production Research , vol.42 , Issue.13 , pp. 2599-2610
    • Lin, J.T.1    Wang, C.K.2    Young, J.R.3
  • 24
    • 33746857517 scopus 로고    scopus 로고
    • Utilising simulation to enhance value stream mapping: A manufacturing case application
    • McDonald, T., Van Aken, E.M., and Rentes, A.F., 2002. Utilising simulation to enhance value stream mapping: a manufacturing case application. International Journal of Logistics, 5 (2), 213-232.
    • (2002) International Journal of Logistics , vol.5 , Issue.2 , pp. 213-232
    • McDonald, T.1    Van Aken, E.M.2    Rentes, A.F.3
  • 25
    • 34547246295 scopus 로고    scopus 로고
    • Production smoothing in just-in-time manufacturing systems: A review of the models and solution approaches
    • Mesut, Y. and Elif, A., 2007. Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches. International Journal of Production Research, 45 (16), 3579-3597.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3579-3597
    • Mesut, Y.1    Elif, A.2
  • 26
    • 51249112270 scopus 로고    scopus 로고
    • Throughput performance analysis for closed-loop vehicle-based material handling systems
    • Nazzal, D. and McGinnis, L., 2008. Throughput performance analysis for closed-loop vehicle-based material handling systems. IIE Transactions, 40 (11), 1097-1106.
    • (2008) IIE Transactions , vol.40 , Issue.11 , pp. 1097-1106
    • Nazzal, D.1    McGinnis, L.2
  • 27
    • 60749115904 scopus 로고    scopus 로고
    • Simulation based planning and scheduling system for TFT-LCD fab
    • 7-10 December, Washington DC
    • Park, B.C., et al., 2008. Simulation based planning and scheduling system for TFT-LCD fab. In: Proceedings of the 40th conference on winter simulation, 7-10 December, Washington, DC, 2271-2276.
    • (2008) Proceedings of the 40th Conference on Winter Simulation , pp. 2271-2276
    • Park, B.C.1
  • 28
    • 0031200370 scopus 로고    scopus 로고
    • Integrated facility layout and material handling system design in semiconductor fabrication facilities
    • Peters, B.A. and Yang, T., 1997. Integrated facility layout and material handling system design in semiconductor fabrication facilities. IEEE Transactions on Semiconductor Manufacturing, 10 (3), 360-369.
    • (1997) IEEE Transactions on Semiconductor Manufacturing , vol.10 , Issue.3 , pp. 360-369
    • Peters, B.A.1    Yang, T.2
  • 31
    • 38049086229 scopus 로고    scopus 로고
    • Performance evaluation of a multi-product system under CONWIP control
    • Satyam, K. and Krishnamurthy, A., 2008. Performance evaluation of a multi-product system under CONWIP control. IIE Transactions, 40 (3), 252-264.
    • (2008) IIE Transactions , vol.40 , Issue.3 , pp. 252-264
    • Satyam, K.1    Krishnamurthy, A.2
  • 32
    • 27844589388 scopus 로고    scopus 로고
    • Application of value stream mapping for lean operations and cycle time reduction: An Indian case study
    • Seth, D. and Gupta, V., 2005. Application of value stream mapping for lean operations and cycle time reduction: an Indian case study. Production Planning and Control, 16 (1), 44-59.
    • (2005) Production Planning and Control , vol.16 , Issue.1 , pp. 44-59
    • Seth, D.1    Gupta, V.2
  • 34
    • 2542539037 scopus 로고    scopus 로고
    • A survey of recent advances in discrete input parameter discrete-event simulation optimization
    • Swisher, J.R., et al., 2004. A survey of recent advances in discrete input parameter discrete-event simulation optimization. IIE Transactions, 36 (6), 591-600.
    • (2004) IIE Transactions , vol.36 , Issue.6 , pp. 591-600
    • Swisher, J.R.1
  • 38
    • 0033161827 scopus 로고    scopus 로고
    • Semiconductor fabrication facility design using a hybrid search methodology
    • Yang, T., Rajasekharan, M., and Peters, B.A., 1999. Semiconductor fabrication facility design using a hybrid search methodology. Computers and Industrial Engineering, 36 (3), 565-583.
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.3 , pp. 565-583
    • Yang, T.1    Rajasekharan, M.2    Peters, B.A.3
  • 39
    • 0036477198 scopus 로고    scopus 로고
    • Solving a multi-objective simulation model using a hybrid response surface method and lexicographical goal programming approach - A case study on integrated circuit ink-marking machines
    • Yang, T. and Tseng, L.P., 2002. Solving a multi-objective simulation model using a hybrid response surface method and lexicographical goal programming approach - a case study on integrated circuit ink-marking machines. Journal of the Operational Research Society, 53 (2), 211-221.
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.2 , pp. 211-221
    • Yang, T.1    Tseng, L.P.2
  • 40
    • 5144226254 scopus 로고    scopus 로고
    • Tabu-search simulation optimization approach for flowshop scheduling with multiple processors - A case study
    • Yang, T., Kuo, Y., and Chang, I., 2004. Tabu-search simulation optimization approach for flowshop scheduling with multiple processors - a case study. International Journal of Production Research, 42 (19), 4015-4030.
    • (2004) International Journal of Production Research , vol.42 , Issue.19 , pp. 4015-4030
    • Yang, T.1    Kuo, Y.2    Chang, I.3
  • 41
    • 18144363958 scopus 로고    scopus 로고
    • Solving a multiresponse simulation problem using a dual-response system and scatter search method
    • Yang, T., Kuo, Y., and Chou, P., 2005. Solving a multiresponse simulation problem using a dual-response system and scatter search method. Simulation Modeling Practice and Theory, 13 (4), 356-369.
    • (2005) Simulation Modeling Practice and Theory , vol.13 , Issue.4 , pp. 356-369
    • Yang, T.1    Kuo, Y.2    Chou, P.3
  • 42
    • 33644765739 scopus 로고    scopus 로고
    • Metamodeling approach in solving the machine parameters optimization problem using neural network and genetic algorithms: A case study
    • Yang, T., Lin, H.C., and Chen, M.L., 2006. Metamodeling approach in solving the machine parameters optimization problem using neural network and genetic algorithms: a case study. Robotics and Computer Integrated Manufacturing, 22 (4), 322-331.
    • (2006) Robotics and Computer Integrated Manufacturing , vol.22 , Issue.4 , pp. 322-331
    • Yang, T.1    Lin, H.C.2    Chen, M.L.3
  • 43
    • 33846932977 scopus 로고    scopus 로고
    • An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy - Acase study
    • Yang, T., Fu, H.P., and Yang, K.Y., 2007. An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy - a case study. International Journal of Production Economics, 107 (1), 104-114.
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 104-114
    • Yang, T.1    Fu, H.P.2    Yang, K.Y.3
  • 45
    • 13544255396 scopus 로고    scopus 로고
    • Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches
    • Zoghby, J., Barnes, J.W., and Hasenbein, J.J., 2005. Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches. European Journal of Operational Research, 167 (2), 336-348.
    • (2005) European Journal of Operational Research , vol.167 , Issue.2 , pp. 336-348
    • Zoghby, J.1    Barnes, J.W.2    Hasenbein, J.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.