메뉴 건너뛰기




Volumn 36, Issue 4, 1998, Pages 867-882

Setting WIP levels with statistical throughput control (STC) in CONWIP production lines

Author keywords

[No Author keywords available]

Indexed keywords

ADAPTIVE CONTROL SYSTEMS; COMPUTER SIMULATION; PRODUCTION; PRODUCTION CONTROL; STATISTICAL METHODS;

EID: 0032046661     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075498193435     Document Type: Article
Times cited : (112)

References (20)
  • 1
    • 0026153765 scopus 로고
    • Determining the number of kanbans in a multiproduct multistage production system
    • Bard, J. F., and Golany, B., 1991, Determining the number of kanbans in a multiproduct multistage production system. International Journal of Production Research, 29 (5), 881- 895.
    • (1991) International Journal of Production Research , vol.29 , Issue.5
    • Bard, J.F.1    Golany, B.2
  • 2
    • 84985774777 scopus 로고
    • A decomposition approximation for periodic kanban-controlled flow shops
    • Berkley, B. J., 1992, A decomposition approximation for periodic kanban-controlled flow shops. Decision Sciences, 23, 291-310.
    • (1992) Decision Sciences , vol.23 , pp. 291-310
    • Berkley, B.J.1
  • 4
    • 0026938171 scopus 로고
    • Comparing trigger and kanban control of flow-line manufacture
    • Graham, I., 1992, Comparing trigger and kanban control of flow-line manufacture. International Journal of Production Research, 30 (10), 2351-2362.
    • (1992) International Journal of Production Research , vol.30 , Issue.10 , pp. 2351-2362
    • Graham, I.1
  • 5
    • 0004102424 scopus 로고
    • Homewood, IL: Dow Jones-Irwin)
    • Hall, R. W., 1983, Zero Inventories (Homewood, IL: Dow Jones-Irwin).
    • (1983) Zero Inventories
    • Hall, R.W.1
  • 7
    • 0025894459 scopus 로고
    • A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
    • Li, A., and Co, H. C., 1991, A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system. International Journal of Production Research, 29 (1), 1-16.
    • (1991) International Journal of Production Research , vol.29 , Issue.1 , pp. 1-16
    • Li, A.1    Co, H.C.2
  • 8
    • 84985779120 scopus 로고
    • An approximate solution to deterministic kanban systems
    • Moeeni, F., and Chang, Y. L., 1990, An approximate solution to deterministic kanban systems. Decision Sciences, 21, 596-606.
    • (1990) Decision Sciences , vol.21 , pp. 596-606
    • Moeeni, F.1    Chang, Y.L.2
  • 9
    • 0003449926 scopus 로고
    • (Atlanta, GA: Industrial Engineering and Management Press, Institute of Industrial Engineers)
    • Monden, Y., 1983, Toyota Production Systems (Atlanta, GA: Industrial Engineering and Management Press, Institute of Industrial Engineers).
    • (1983) Toyota Production Systems
    • Monden, Y.1
  • 11
    • 0004220333 scopus 로고
    • (Cambridge, MA: Productivity Press). (Translation of Toyota seisan hoshiki, Tokyo: Diamond
    • Ohno, T., 1988, Toyota Production System: Beyond Large-Scale Production (Cambridge, MA: Productivity Press). (Translation of Toyota seisan hoshiki, Tokyo: Diamond, 1978).
    • (1988) Toyota Production System: Beyond Large-Scale Production , pp. 1978
    • Ohno, T.1
  • 12
    • 0023310442 scopus 로고
    • An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans
    • Philipoom, P. R., Rees, L. P., Taylor, B. W., III, and Huang, P. Y., 1987, An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans. International Journal of Production Research, 25 (3), 457-472.
    • (1987) International Journal of Production Research , vol.25 , Issue.3 , pp. 457-472
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3    Huang, P.Y.4
  • 14
    • 0023365980 scopus 로고
    • Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime
    • Rees, L. P., Philipoom, P. R., Taylor, B. W., III, and Huang, P. Y., 1987, Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime. IIE Transactions, 19 (2), 199-207.
    • (1987) IIE Transactions , vol.19 , Issue.2 , pp. 199-207
    • Rees, L.P.1    Philipoom, P.R.2    Taylor, B.W.3    Huang, P.Y.4
  • 16
    • 0026208470 scopus 로고
    • An analytical congestion model for closed production systems with IFR processing times
    • Spearman, M. L., 1991, An analytical congestion model for closed production systems with IFR processing times. Management Science, 37 (8), 1015-1029.
    • (1991) Management Science , vol.37 , Issue.8 , pp. 1015-1029
    • Spearman, M.L.1
  • 17
    • 0000170779 scopus 로고
    • A hierarchical control architecture for constant work-in-process (CONWIP) production systems
    • Spearman, M. L., Woodruff, D. L., and Hopp, W J., 1989, A hierarchical control architecture for constant work-in-process (CONWIP) production systems. Journal of Manufacturing Operations Management, 2, 147-171.
    • (1989) Journal of Manufacturing Operations Management , vol.2 , pp. 147-171
    • Spearman, M.L.1    Woodruff, D.L.2    Hopp, W.J.3
  • 19
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M. L., and Zazanis, M. A., 1992, Push and pull production systems: issues and comparisons. Operations Research, 40 (3), 521-532.
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 20
    • 3343026463 scopus 로고
    • Optimum number of kanbans between two adjacent workstations in a JIT system
    • Wang, H., and Wang, H. P., 1993, Optimum number of kanbans between two adjacent workstations in a JIT system. International Journal of Production Economics, 29, 89-101.
    • (1993) International Journal of Production Economics , vol.29 , pp. 89-101
    • Wang, H.1    Wang, H.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.