-
1
-
-
0026153765
-
Determining the number of kanbans in a multiproduct multistage production system
-
Bard, J. F., and Golany, B., 1991, Determining the number of kanbans in a multiproduct multistage production system. International Journal of Production Research, 29 (5), 881- 895.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.5
-
-
Bard, J.F.1
Golany, B.2
-
2
-
-
84985774777
-
A decomposition approximation for periodic kanban-controlled flow shops
-
Berkley, B. J., 1992, A decomposition approximation for periodic kanban-controlled flow shops. Decision Sciences, 23, 291-310.
-
(1992)
Decision Sciences
, vol.23
, pp. 291-310
-
-
Berkley, B.J.1
-
3
-
-
0000436165
-
Kanban controlled pull systems: Analytic approach
-
Deleersnyder, J. L., Hodgson, T. J., Muller, H., and O’ Grady, P. J., 1989, Kanban controlled pull systems: analytic approach. Management Science, 35 (9), 1079-1091.
-
(1989)
Management Science
, vol.35
, Issue.9
, pp. 1079-1091
-
-
Deleersnyder, J.L.1
Hodgson, T.J.2
Muller, H.3
O’ Grady, P.J.4
-
4
-
-
0026938171
-
Comparing trigger and kanban control of flow-line manufacture
-
Graham, I., 1992, Comparing trigger and kanban control of flow-line manufacture. International Journal of Production Research, 30 (10), 2351-2362.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.10
, pp. 2351-2362
-
-
Graham, I.1
-
5
-
-
0004102424
-
-
Homewood, IL: Dow Jones-Irwin)
-
Hall, R. W., 1983, Zero Inventories (Homewood, IL: Dow Jones-Irwin).
-
(1983)
Zero Inventories
-
-
Hall, R.W.1
-
7
-
-
0025894459
-
A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
-
Li, A., and Co, H. C., 1991, A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system. International Journal of Production Research, 29 (1), 1-16.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.1
, pp. 1-16
-
-
Li, A.1
Co, H.C.2
-
8
-
-
84985779120
-
An approximate solution to deterministic kanban systems
-
Moeeni, F., and Chang, Y. L., 1990, An approximate solution to deterministic kanban systems. Decision Sciences, 21, 596-606.
-
(1990)
Decision Sciences
, vol.21
, pp. 596-606
-
-
Moeeni, F.1
Chang, Y.L.2
-
9
-
-
0003449926
-
-
(Atlanta, GA: Industrial Engineering and Management Press, Institute of Industrial Engineers)
-
Monden, Y., 1983, Toyota Production Systems (Atlanta, GA: Industrial Engineering and Management Press, Institute of Industrial Engineers).
-
(1983)
Toyota Production Systems
-
-
Monden, Y.1
-
11
-
-
0004220333
-
-
(Cambridge, MA: Productivity Press). (Translation of Toyota seisan hoshiki, Tokyo: Diamond
-
Ohno, T., 1988, Toyota Production System: Beyond Large-Scale Production (Cambridge, MA: Productivity Press). (Translation of Toyota seisan hoshiki, Tokyo: Diamond, 1978).
-
(1988)
Toyota Production System: Beyond Large-Scale Production
, pp. 1978
-
-
Ohno, T.1
-
12
-
-
0023310442
-
An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans
-
Philipoom, P. R., Rees, L. P., Taylor, B. W., III, and Huang, P. Y., 1987, An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans. International Journal of Production Research, 25 (3), 457-472.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.3
, pp. 457-472
-
-
Philipoom, P.R.1
Rees, L.P.2
Taylor, B.W.3
Huang, P.Y.4
-
13
-
-
0028429481
-
Review of optimization models of kanban-based production systems
-
Price, W., Gravel, M., and Nsakanda, A. L., 1994, Review of optimization models of kanban-based production systems. European Journal of Operational Research, 75, 1-12.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 1-12
-
-
Price, W.1
Gravel, M.2
Nsakanda, A.L.3
-
14
-
-
0023365980
-
Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime
-
Rees, L. P., Philipoom, P. R., Taylor, B. W., III, and Huang, P. Y., 1987, Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime. IIE Transactions, 19 (2), 199-207.
-
(1987)
IIE Transactions
, vol.19
, Issue.2
, pp. 199-207
-
-
Rees, L.P.1
Philipoom, P.R.2
Taylor, B.W.3
Huang, P.Y.4
-
16
-
-
0026208470
-
An analytical congestion model for closed production systems with IFR processing times
-
Spearman, M. L., 1991, An analytical congestion model for closed production systems with IFR processing times. Management Science, 37 (8), 1015-1029.
-
(1991)
Management Science
, vol.37
, Issue.8
, pp. 1015-1029
-
-
Spearman, M.L.1
-
17
-
-
0000170779
-
A hierarchical control architecture for constant work-in-process (CONWIP) production systems
-
Spearman, M. L., Woodruff, D. L., and Hopp, W J., 1989, A hierarchical control architecture for constant work-in-process (CONWIP) production systems. Journal of Manufacturing Operations Management, 2, 147-171.
-
(1989)
Journal of Manufacturing Operations Management
, vol.2
, pp. 147-171
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
18
-
-
0025430443
-
CONWIP a pull alternative to kanban
-
Spearman, M. L., Woodruff, D. L., and Hopp, W. J., 1990, CONWIP a pull alternative to kanban. International Journal of Production Research, 28 (5), 879-894.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.5
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
19
-
-
0026859945
-
Push and pull production systems: Issues and comparisons
-
Spearman, M. L., and Zazanis, M. A., 1992, Push and pull production systems: issues and comparisons. Operations Research, 40 (3), 521-532.
-
(1992)
Operations Research
, vol.40
, Issue.3
, pp. 521-532
-
-
Spearman, M.L.1
Zazanis, M.A.2
-
20
-
-
3343026463
-
Optimum number of kanbans between two adjacent workstations in a JIT system
-
Wang, H., and Wang, H. P., 1993, Optimum number of kanbans between two adjacent workstations in a JIT system. International Journal of Production Economics, 29, 89-101.
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 89-101
-
-
Wang, H.1
Wang, H.P.2
|