메뉴 건너뛰기




Volumn 56, Issue 7, 2010, Pages 1859-1879

A novel approach to scheduling multipurpose batch plants using unit-slots

Author keywords

Batch processes; Continuous time; Multipurpose plants; Scheduling; Slot based formulations; Unit slots

Indexed keywords

BATCH PROCESS; CONTINUOUS TIME; MULTIPURPOSE PLANTS; SLOT-BASED FORMULATIONS; UNIT-SLOTS;

EID: 77955820606     PISSN: 00011541     EISSN: 15475905     Source Type: Journal    
DOI: 10.1002/aic.12120     Document Type: Article
Times cited : (66)

References (53)
  • 1
    • 33748102266 scopus 로고    scopus 로고
    • Stateof-the-art review of optimization methods for short-term scheduling of batch processes
    • Méndez CA, Cerdá J, Grossmann IE, Harjunkoski I, Fahl M. Stateof-the-art review of optimization methods for short-term scheduling of batch processes. Comput Chem Eng. 2006;30:913-946.
    • (2006) Comput Chem Eng , vol.30 , pp. 913-946
    • Méndez, C.A.1    Cerdá, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 2
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Floudas CA, Xiaoxia L. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput Chem Eng. 2004;28:2109-2129.
    • (2004) Comput Chem Eng , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Xiaoxia, L.2
  • 3
    • 77951687462 scopus 로고    scopus 로고
    • Novel MILP models for scheduling permutation flowshops
    • Pitty SS, Karimi IA. Novel MILP models for scheduling permutation flowshops. Chem Product Process Model. 2008;3:22.
    • (2008) Chem Product Process Model , vol.3 , pp. 22
    • Pitty, S.S.1    Karimi, I.A.2
  • 4
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event based continuous-time approaches for batch processes: integrality gap and task splitting
    • Janak SL, Floudas CA. Improving unit-specific event based continuous-time approaches for batch processes: integrality gap and task splitting. Comput Chem Eng. 2008;32:913-955.
    • (2008) Comput Chem Eng , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 5
    • 65349119397 scopus 로고    scopus 로고
    • Novel unified modeling approach for shortterm scheduling
    • Shaik M, Floudas C. Novel unified modeling approach for shortterm scheduling. Ind Eng Chem Res. 2009;48:2947-2964.
    • (2009) Ind Eng Chem Res , vol.48 , pp. 2947-2964
    • Shaik, M.1    Floudas, C.2
  • 6
    • 75249090444 scopus 로고    scopus 로고
    • An analysis of some unit-specific event-based models for the short-term scheduling of non-continuous processes
    • Accepted
    • Li J, Susarla N, Karimi IA, Shaik M, Floudas CA. An analysis of some unit-specific event-based models for the short-term scheduling of non-continuous processes. Ind Eng Chem Res. Accepted.
    • Ind Eng Chem Res.
    • Li, J.1    Susarla, N.2    Karimi I.A3    Shaik, M.4    Floudas, C.A.5
  • 7
    • 0343627890 scopus 로고    scopus 로고
    • Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby endproduct facilities
    • Méndez CA, Cerdá J. Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby endproduct facilities. Comput Chem Eng. 2000;24:369-376.
    • (2000) Comput Chem Eng , vol.24 , pp. 369-376
    • Méndez, C.A.1    Cerdá, J.2
  • 8
    • 0034387803 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints
    • Hui C-W, Gupta A, van der Meulen HAJ. A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints. Comput Chem Eng. 2000;24:2705-2717.
    • (2000) Comput Chem Eng , vol.24 , pp. 2705-2717
    • Hui, C.W.1    Gupta, A.2    van der Meulen, H.A.J.3
  • 9
    • 0037419775 scopus 로고    scopus 로고
    • Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage
    • Gupta S, Karimi IA. Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage. Ind Eng Chem Res. 2003;42:490-508.
    • (2003) Ind Eng Chem Res , vol.42 , pp. 490-508
    • Gupta, S.1    Karimi, I.A.2
  • 10
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for scheduling multiproduct, multistage batch plants
    • Gupta S, Karimi IA. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Ind Eng Chem Res. 2003;42: 2365-2380.
    • (2003) Ind Eng Chem Res , vol.42 , pp. 2365-2380
    • Gupta, S.1    Karimi, I.A.2
  • 11
    • 34548483161 scopus 로고    scopus 로고
    • Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units
    • Liu Y, Karimi IA. Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units. Comput Chem Eng. 2007;31:1671-1693.
    • (2007) Comput Chem Eng , vol.31 , pp. 1671-1693
    • Liu, Y.1    Karimi, I.A.2
  • 12
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Mendez CA, Henning GP, Cerda J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Comput Chem Eng. 2001;25:701-711.
    • (2001) Comput Chem Eng , vol.25 , pp. 701-711
    • Mendez, C.A.1    Henning, G.P.2    Cerda, J.3
  • 13
    • 2442495043 scopus 로고    scopus 로고
    • An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies
    • Mendez CA, Cerda J. An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies. Opt Eng. 2003;4:7-22.
    • (2003) Opt Eng , vol.4 , pp. 7-22
    • Mendez, C.A.1    Cerda, J.2
  • 14
    • 33748120584 scopus 로고    scopus 로고
    • Short-term scheduling of multistage batch processes subject to limited finite resources
    • Mendez CA, Cerda J. Short-term scheduling of multistage batch processes subject to limited finite resources. Comput Aided Chem Eng. 2004;15B:984-989.
    • (2004) Comput Aided Chem Eng , vol.15 B , pp. 984-989
    • Mendez, C.A.1    Cerda, J.2
  • 16
    • 0000518993 scopus 로고
    • An integer linear-programming model for machine scheduling
    • Wagner H. An integer linear-programming model for machine scheduling. Naval Res Logistics Q. 1959;6(2):131-140.
    • (1959) Naval Res Logistics Q , vol.6 , Issue.2 , pp. 131-140
    • Wagner, H.1
  • 18
    • 0024090948 scopus 로고
    • Scheduling in serial multiproduct batch processes with finite interstage storage: mixed integer linear program formulation
    • Ku HM, Karimi IA. Scheduling in serial multiproduct batch processes with finite interstage storage: mixed integer linear program formulation. Ind Eng Chem Res. 1988;27:1840-1848.
    • (1988) Ind Eng Chem Res , vol.27 , pp. 1840-1848
    • Ku, H.M.1    Karimi, I.A.2
  • 19
    • 0025414711 scopus 로고
    • Scheduling in serial multiproduct batch processes with due-date penalties
    • Ku HM, Karimi I. Scheduling in serial multiproduct batch processes with due-date penalties. Ind Eng Chem Res. 1990;29:580-590.
    • (1990) Ind Eng Chem Res , vol.29 , pp. 580-590
    • Ku, H.M.1    Karimi, I.2
  • 20
    • 0001719102 scopus 로고
    • Incorporating scheduling in the optimal design of multiproduct batch plants
    • Birewar D, Grossmann I. Incorporating scheduling in the optimal design of multiproduct batch plants. Comput Chem Eng. 1989;13: 141-161.
    • (1989) Comput Chem Eng , vol.13 , pp. 141-161
    • Birewar, D.1    Grossmann, I.2
  • 21
    • 0016971681 scopus 로고
    • Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach
    • Geoffrion A, Graves G. Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach. Oper Res. 1976:595-610.
    • (1976) Oper Res , pp. 595610
    • Geoffrion A1    Graves G2
  • 22
    • 0026108226 scopus 로고
    • MINLP model for cyclic multiproduct scheduling on continuous parallel lines
    • Sahinidis NV, Grossmann IE. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Comput Chem Eng. 1991; 15:85-103.
    • (1991) Comput Chem Eng , vol.15 , pp. 85-103
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 23
    • 0028500039 scopus 로고
    • Optimal cyclic scheduling of multistage continuous multiproduct plants
    • Pinto JM, Grossmann IE. Optimal cyclic scheduling of multistage continuous multiproduct plants. Comput Chem Eng. 1994;18:797- 816.
    • (1994) Comput Chem Eng , vol.18 , pp. 797-816
    • Pinto, J.M.1    Grossmann, I.E.2
  • 24
    • 0001690679 scopus 로고
    • A continuous-time mixed-integer linearprogramming model for short-term scheduling of multistage batch plants
    • Pinto JM, Grossmann IE. A continuous-time mixed-integer linearprogramming model for short-term scheduling of multistage batch plants. Ind Eng Chem Res. 1995;34:3037-3051.
    • (1995) Ind Eng Chem Res , vol.34 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 25
    • 0346734333 scopus 로고    scopus 로고
    • Resource-constrained scheduling of parallel production lines using asynchronous slots
    • Lim M-F, Karimi IA. Resource-constrained scheduling of parallel production lines using asynchronous slots. Ind Eng Chem Res. 2003;42:6832-6842.
    • (2003) Ind Eng Chem Res , vol.42 , pp. 6832-6842
    • Lim, M.-F.1    Karimi, I.A.2
  • 26
    • 33846785064 scopus 로고    scopus 로고
    • Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage
    • Liu Y, Karimi IA. Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage. Chem Eng Sci. 2007;62:1549-1566.
    • (2007) Chem Eng Sci , vol.62 , pp. 1549-1566
    • Liu, Y.1    Karimi, I.A.2
  • 27
    • 38849188495 scopus 로고    scopus 로고
    • Scheduling multistage batch plants with parallel units and no interstage storage
    • Liu Y, Karimi IA. Scheduling multistage batch plants with parallel units and no interstage storage. Comput Chem Eng. 2008;32:671-693.
    • (2008) Comput Chem Eng , vol.32 , pp. 671-693
    • Liu, Y.1    Karimi, I.A.2
  • 28
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G, Pantelides C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Comput Chem Eng. 1996;20:1221-1226.
    • (1996) Comput Chem Eng , vol.20 , pp. 1221-1226
    • Schilling, G.1    Pantelides, C.2
  • 29
    • 0031188902 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processesI. Production planning
    • McDonald CM, Karimi IA. Planning and scheduling of parallel semicontinuous processes. I. Production planning. Ind Eng Chem Res. 1997;36:2691-2700.
    • (1997) Ind Eng Chem Res. , vol.36 , pp. 2691-2700
    • McDonald, C.M.1    Karimi, I.A.2
  • 30
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. II. Short-term scheduling
    • Karimi IA, McDonald CM. Planning and scheduling of parallel semicontinuous processes. II. Short-term scheduling. Ind Eng Chem Res. 1997;36:2701-2714.
    • (1997) Ind Eng Chem Res. , vol.36 , pp. 2701-2714
    • Karimi, I.A.1    McDonald, C.M.2
  • 31
    • 0037138682 scopus 로고    scopus 로고
    • Scheduling parallel production lines with resource constraints. I. Model formulation
    • Lamba N, Karimi IA. Scheduling parallel production lines with resource constraints. I. Model formulation. Ind Eng Chem Res. 2002; 41:779-789.
    • (2002) Ind Eng Chem Res. , vol.41 , pp. 779-789
    • Lamba, N.1    Karimi, I.A.2
  • 32
    • 0037138595 scopus 로고    scopus 로고
    • Scheduling parallel production lines with resource constraints. II. Decomposition algorithm
    • Lamba N, Karimi IA. Scheduling parallel production lines with resource constraints. II. Decomposition algorithm. Ind Eng Chem Res. 2002;41:790-800.
    • (2002) Ind Eng Chem Res. , vol.41 , pp. 790-800
    • Lamba, N.1    Karimi, I.A.2
  • 33
    • 1642331599 scopus 로고    scopus 로고
    • A new continuous-time formulation for scheduling crude oil operations
    • Reddy PCP, Karimi IA, Srinivasan R. A new continuous-time formulation for scheduling crude oil operations. Chem Eng Sci. 2004;59:1325-1341.
    • (2004) Chem Eng Sci , vol.59 , pp. 1325-1341
    • Reddy, P.C.P.1    Karimi, I.A.2    Srinivasan, R.3
  • 34
    • 15344346066 scopus 로고    scopus 로고
    • A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A, Karimi IA. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chem Eng Sci. 2005;60:2679-2702.
    • (2005) Chem Eng Sci , vol.60 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 35
    • 40449111439 scopus 로고    scopus 로고
    • Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers
    • Erdirik-Dogan M, Grossmann IE. Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers. Ind Eng Chem Res. 2008;47: 1159-1163.
    • (2008) Ind Eng Chem Res , vol.47 , pp. 1159-1163
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 36
    • 74349131396 scopus 로고    scopus 로고
    • Recipe determination and scheduling of gasoline blending and distribution operations
    • DOI: 10.1002/aic.11970
    • Li J, Karimi IA, Srinivasan R. Recipe determination and scheduling of gasoline blending and distribution operations. AIChE J. DOI: 10.1002/aic.11970.
    • (2000) AIChE J
    • Li, J.1    Karimi, I.A.2    Srinivasan, R.3
  • 37
    • 0028546642 scopus 로고
    • Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes
    • Zentner M, Pekny J, Reklaitis G, Gupta J. Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes. J Process Control. 1994;4:259-280.
    • (1994) J Process Control , vol.4 , pp. 259-280
    • Zentner, M.1    Pekny, J.2    Reklaitis, G.3    Gupta, J.4
  • 38
    • 0003428213 scopus 로고
    • Algorithms for Optimal Scheduling using Non-Linear Models
    • Zhang X. Algorithms for Optimal Scheduling using Non-Linear Models. Ph.D. Thesis, London: University of London, 1995;20:897-904.
    • (1995) Ph.D. Thesis London: University of London , vol.20 , pp. 897-904
    • Zhang, X.1
  • 39
    • 0030174820 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities-a general formulation and some approaches for the solution
    • Zhang X, Sargent R. The optimal operation of mixed production facilities-a general formulation and some approaches for the solution. Comput Chem Eng. 1996;20:897-904.
    • (1996) Comput Chem Eng , vol.20 , pp. 897-904
    • Zhang, X.1    Sargent, R.2
  • 40
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. I. Multipurpose batch processes
    • Ierapetritou MG, Floudas CA. Effective continuous-time formulation for short-term scheduling. I. Multipurpose batch processes. Ind Eng Chem Res. 1998;37:4341-4359.
    • (1998) Ind Eng Chem Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 41
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias CT, Grossmann IE. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind Eng Chem Res. 2003;42:3056- 3074.
    • (2003) Ind Eng Chem Res , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 42
    • 0346101524 scopus 로고    scopus 로고
    • Simple continuous-time formulation for short-term scheduling of batch and continuous processes
    • Castro PM, Barbosa P, voa AP, Matos HA, Novais AQ. Simple continuous-time formulation for short-term scheduling of batch and continuous processes. Ind Eng Chem Res. 2004;43:105-118.
    • (2004) Ind Eng Chem Res , vol.43 , pp. 105-118
    • Castro, P.M.1    Barbosa, P.2    voa, A.P.3    Matos, H.A.4    Novais, A.Q.5
  • 43
    • 50849099125 scopus 로고    scopus 로고
    • Short-term scheduling of multistage batch plants with unlimited intermediate storage
    • Castro P, Novais A. Short-term scheduling of multistage batch plants with unlimited intermediate storage. Ind Eng Chem Res. 2008;47:6126-6139.
    • (2008) Ind Eng Chem Res , vol.47 , pp. 6126-6139
    • Castro, P.1    Novais, A.2
  • 44
    • 29144514680 scopus 로고    scopus 로고
    • New continuous-time MILP model for the short-term scheduling of multistage batch plants
    • Castro P, Grossmann I. New continuous-time MILP model for the short-term scheduling of multistage batch plants. Ind Eng Chem Res. 2005;44:9175-9190.
    • (2005) Ind Eng Chem Res , vol.44 , pp. 9175-9190
    • Castro, P.1    Grossmann, I.2
  • 45
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak SL, Lin X, Floudas CA. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind Eng Chem Res. 2004;43:2516-2533.
    • (2004) Ind Eng Chem Res , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 46
    • 35549009402 scopus 로고    scopus 로고
    • Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework
    • Shaik MA, Floudas CA. Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework. Comput Chem Eng. 2008;32:260-274.
    • (2008) Comput Chem Eng , vol.32 , pp. 260-274
    • Shaik, M.A.1    Floudas, C.A.2
  • 47
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study
    • Shaik MA, Janak SL, Floudas CA. Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study. Ind Eng Chem Res. 2006;45:6190-6209.
    • (2006) Ind Eng Chem Res , vol.45 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 48
    • 11844300749 scopus 로고    scopus 로고
    • Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations
    • Castro PM, Barbosa-Povoa AP, Matos HA, Novais AQ. Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations. Ind Eng Chem Res. 2005;44:343-357.
    • (2005) Ind Eng Chem Res , vol.44 , pp. 343-357
    • Castro, P.M.1    Barbosa-Povoa, A.P.2    Matos, H.A.3    Novais, A.Q.4
  • 49
    • 67651092136 scopus 로고    scopus 로고
    • A novel network-based continuous-time representation for process scheduling. I. Main concepts and mathematical formulation.
    • Gimenez DM, Henning GP, Maravelias CT. A novel network-based continuous-time representation for process scheduling. I. Main concepts and mathematical formulation. Comput Chem Eng. 2009;33: 1511-1528.
    • (2009) Comput Chem Eng. , vol.33 , pp. 1511-1528
    • Gimenez, D.M.1    Henning, G.P.2    Maravelias, C.T.3
  • 50
    • 67651092136 scopus 로고    scopus 로고
    • A novel network-based continuous-time representation for process scheduling. II. General framework.
    • Gimenez DM, Henning GP, Maravelias CT. A novel network-based continuous-time representation for process scheduling. II. General framework. Comput Chem Eng. 2009;33:1511-1528.
    • (2009) Comput Chem Eng. , vol.33 , pp. 1511-1528
    • Gimenez, D.M.1    Henning, G.P.2    Maravelias, C.T.3
  • 51
    • 9644269022 scopus 로고    scopus 로고
    • An improved formulation for scheduling an automated wet-etch station
    • Karimi I, Tan Z, Bhushan S. An improved formulation for scheduling an automated wet-etch station. Comput Chem Eng. 2004;29:217- 224.
    • (2004) Comput Chem Eng , vol.29 , pp. 217-224
    • Karimi, I.1    Tan, Z.2    Bhushan, S.3
  • 53
    • 0027545176 scopus 로고
    • Sargent RWH. A general algorithm for short-term scheduling of batch operations. I. MILP formulation
    • Kondili E, Pantelides CC, Sargent RWH. A general algorithm for short-term scheduling of batch operations. I. MILP formulation. Comput Chem Eng. 1993;17:211-227.
    • (1993) Comput Chem Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.