메뉴 건너뛰기




Volumn 52, Issue 10, 2013, Pages 3832-3841

Reformulations and branching methods for mixed-integer programming chemical production scheduling models

Author keywords

[No Author keywords available]

Indexed keywords

CHEMICAL PRODUCTION SCHEDULING; COMPUTATIONAL REQUIREMENTS; DECISION VARIABLES; MIXED-INTEGER PROGRAMMING; MIXED-INTEGER PROGRAMS; OBJECTIVE FUNCTION VALUES; ORDERS-OF-MAGNITUDE; SYMMETRIC SOLUTION;

EID: 84875000745     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie303421h     Document Type: Article
Times cited : (41)

References (50)
  • 1
    • 0029215490 scopus 로고
    • Issues in Solving Large-Scale Planning, Design and Scheduling Problems in Batch Chemical Plants
    • Subrahmanyam, S.; Bassett, M. H.; Pekny, J. F.; Reklaitis, G. V. Issues in Solving Large-Scale Planning, Design and Scheduling Problems in Batch Chemical Plants Comput. Chem. Eng. 1995, 19, S577-S582
    • (1995) Comput. Chem. Eng. , vol.19
    • Subrahmanyam, S.1    Bassett, M.H.2    Pekny, J.F.3    Reklaitis, G.V.4
  • 2
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-Art Review of Optimization Methods for Short-Term Scheduling of Batch Processes
    • Mendez, C. A.; Cerda, J.; Grossmann, I. E.; Harjunkoski, I.; Fahl, M. State-of-the-Art Review of Optimization Methods for Short-Term Scheduling of Batch Processes Comput. Chem. Eng. 2006, 30 (6-7) 913-946
    • (2006) Comput. Chem. Eng. , vol.30 , Issue.67 , pp. 913-946
    • Mendez, C.A.1    Cerda, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 3
    • 84860610233 scopus 로고    scopus 로고
    • General Framework and Modeling Approach Classification for Chemical Production Scheduling
    • Maravelias, C. T. General Framework and Modeling Approach Classification for Chemical Production Scheduling AIChE J. 2012, 58 (6) 1812-1828
    • (2012) AIChE J. , vol.58 , Issue.6 , pp. 1812-1828
    • Maravelias, C.T.1
  • 4
    • 0018651022 scopus 로고
    • Production Planning and Scheduling for Multipurpose Batch Chemical Plants
    • Mauderli, A.; Rippin, D. W. T. Production Planning and Scheduling for Multipurpose Batch Chemical Plants Comput. Chem. Eng. 1979, 3 (1-4) 199-206
    • (1979) Comput. Chem. Eng. , vol.3 , Issue.14 , pp. 199-206
    • Mauderli, A.1    Rippin, D.W.T.2
  • 5
    • 0022901698 scopus 로고
    • Short-Term Scheduling for Multiproduct Batch Chemical Plants
    • Egli, U. M.; Rippin, D. W. T. Short-Term Scheduling for Multiproduct Batch Chemical Plants Comput. Chem. Eng. 1986, 10 (4) 303-325
    • (1986) Comput. Chem. Eng. , vol.10 , Issue.4 , pp. 303-325
    • Egli, U.M.1    Rippin, D.W.T.2
  • 6
    • 0020291533 scopus 로고
    • Review of Scheduling of Process Operation
    • Reklaitis, G. V. Review of Scheduling of Process Operation AIChE Symp. Ser. 1982, 78, 119-133
    • (1982) AIChE Symp. Ser. , vol.78 , pp. 119-133
    • Reklaitis, G.V.1
  • 7
    • 0027545176 scopus 로고
    • A General Algorithm for Short-Term Scheduling of Batch Operations. 1. MILP Formulation
    • Kondili, E.; Pantelides, C. C.; Sargent, R. W. H. A General Algorithm for Short-Term Scheduling of Batch Operations. 1. MILP Formulation Comput. Chem. Eng. 1993, 17 (2) 211-227
    • (1993) Comput. Chem. Eng. , vol.17 , Issue.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 8
    • 0027545175 scopus 로고
    • A General Algorithm for Short-Term Scheduling of Batch Operations. 2. Computational Issues
    • Shah, N.; Pantelides, C. C.; Sargent, R. W. H. A General Algorithm for Short-Term Scheduling of Batch Operations. 2. Computational Issues Comput. Chem. Eng. 1993, 17 (2) 229-244
    • (1993) Comput. Chem. Eng. , vol.17 , Issue.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 10
    • 0029717404 scopus 로고    scopus 로고
    • A Simple Continuous-Time Process Scheduling Formulation and a Novel Solution Algorithm
    • Schilling, G.; Pantelides, C. C. A Simple Continuous-Time Process Scheduling Formulation and a Novel Solution Algorithm Comput. Chem. Eng. 1996, 20, S1221-S1226
    • (1996) Comput. Chem. Eng. , vol.20
    • Schilling, G.1    Pantelides, C.C.2
  • 11
    • 0030174820 scopus 로고    scopus 로고
    • The Optimal Operation of Mixed Production Facilities -A General Formulation and Some Approaches for the Solution
    • Zhang, X.; Sargent, R. W. H. The Optimal Operation of Mixed Production Facilities-A General Formulation and Some Approaches for the Solution Comput. Chem. Eng. 1996, 20 (6-7) 897-904
    • (1996) Comput. Chem. Eng. , vol.20 , Issue.67 , pp. 897-904
    • Zhang, X.1    Sargent, R.W.H.2
  • 12
    • 0032216021 scopus 로고    scopus 로고
    • Effective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch Processes
    • Ierapetritou, M. G.; Floudas, C. A. Effective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch Processes Ind. Eng. Chem. Res. 1998, 37 (11) 4341-4359
    • (1998) Ind. Eng. Chem. Res. , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 13
    • 0032997426 scopus 로고    scopus 로고
    • Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 1. Minlp Formulation
    • Mockus, L.; Reklaitis, G. V. Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 1. Minlp Formulation Ind. Eng. Chem. Res. 1999, 38 (1) 197-203
    • (1999) Ind. Eng. Chem. Res. , vol.38 , Issue.1 , pp. 197-203
    • Mockus, L.1    Reklaitis, G.V.2
  • 14
    • 0035795519 scopus 로고    scopus 로고
    • An Improved RTN Continuous-Time Formulation for the Short-Term Scheduling of Multipurpose Batch Plants
    • Castro, P.; Barbosa-Povoa, A. P. F. D.; Matos, H. An Improved RTN Continuous-Time Formulation for the Short-Term Scheduling of Multipurpose Batch Plants Ind. Eng. Chem. Res. 2001, 40 (9) 2059-2068
    • (2001) Ind. Eng. Chem. Res. , vol.40 , Issue.9 , pp. 2059-2068
    • Castro, P.1    Barbosa-Povoa, A.P.F.D.2    Matos, H.3
  • 15
    • 0037635200 scopus 로고    scopus 로고
    • New General Continuous-Time State-Task Network Formulation for Short-Term Scheduling of Multipurpose Batch Plants
    • Maravelias, C. T.; Grossmann, I. E. New General Continuous-Time State-Task Network Formulation for Short-Term Scheduling of Multipurpose Batch Plants Ind. Eng. Chem. Res. 2003, 42 (13) 3056-3074
    • (2003) Ind. Eng. Chem. Res. , vol.42 , Issue.13 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 16
    • 0037092994 scopus 로고    scopus 로고
    • A Novel Event-Driven Formulation for Short-Term Scheduling of Multipurpose Continuous Processes
    • Giannelos, N. F.; Georgiadis, M. C. A Novel Event-Driven Formulation for Short-Term Scheduling of Multipurpose Continuous Processes Ind. Eng. Chem. Res. 2002, 41 (10) 2431-2439
    • (2002) Ind. Eng. Chem. Res. , vol.41 , Issue.10 , pp. 2431-2439
    • Giannelos, N.F.1    Georgiadis, M.C.2
  • 17
    • 15344346066 scopus 로고    scopus 로고
    • A Simpler Better Slot-Based Continuous-Time Formulation for Short-Term Scheduling in Multipurpose Batch Plants
    • Sundaramoorthy, A.; Karimi, I. A. A Simpler Better Slot-Based Continuous-Time Formulation for Short-Term Scheduling in Multipurpose Batch Plants Chem. Eng. Sci. 2005, 60 (10) 2679-2702
    • (2005) Chem. Eng. Sci. , vol.60 , Issue.10 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 18
    • 29144475374 scopus 로고    scopus 로고
    • Mixed-Time Representation for State-Task Network Models
    • Maravelias, C. T. Mixed-Time Representation for State-Task Network Models Ind. Eng. Chem. Res. 2005, 44 (24) 9129-9145
    • (2005) Ind. Eng. Chem. Res. , vol.44 , Issue.24 , pp. 9129-9145
    • Maravelias, C.T.1
  • 19
    • 0041346170 scopus 로고    scopus 로고
    • Crude Oil Blend Scheduling Optimization: An Application with Multimillion Dollar Benefits -Part 2. The Ability to Schedule the Crude Oil Blendshop More Effectively Provides Substantial Downstream Benefits
    • Kelly, J. D.; Mann, J. L. Crude Oil Blend Scheduling Optimization: An Application with Multimillion Dollar Benefits-Part 2. The Ability to Schedule the Crude Oil Blendshop More Effectively Provides Substantial Downstream Benefits Hydrocarbon Process. 2003, 82 (7) 72-79
    • (2003) Hydrocarbon Process. , vol.82 , Issue.7 , pp. 72-79
    • Kelly, J.D.1    Mann, J.L.2
  • 20
    • 50549101227 scopus 로고    scopus 로고
    • Hierarchical Decomposition Heuristic for Scheduling: Coordinated Reasoning for Decentralized and Distributed Decision-Making Problems
    • Kelly, J. D.; Zyngier, D. Hierarchical Decomposition Heuristic for Scheduling: Coordinated Reasoning for Decentralized and Distributed Decision-Making Problems Comput. Chem. Eng. 2008, 32 (11) 2684-2705
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.11 , pp. 2684-2705
    • Kelly, J.D.1    Zyngier, D.2
  • 21
    • 0032386621 scopus 로고    scopus 로고
    • Assignment and Sequencing Models for the Scheduling of Process Systems
    • Pinto, J. M.; Grossmann, I. E. Assignment and Sequencing Models for the Scheduling of Process Systems Ann. Oper. Res. 1998, 81, 433-466
    • (1998) Ann. Oper. Res. , vol.81 , pp. 433-466
    • Pinto, J.M.1    Grossmann, I.E.2
  • 22
    • 0024090948 scopus 로고
    • Scheduling in Serial Multiproduct Batch Processes with Finite Interstage Storage: A Mixed Integer Linear Program Formulation
    • Ku, H. M.; Karimi, I. A. Scheduling in Serial Multiproduct Batch Processes with Finite Interstage Storage: A Mixed Integer Linear Program Formulation Ind. Eng. Chem. Res. 1988, 27 (10) 1840-1848
    • (1988) Ind. Eng. Chem. Res. , vol.27 , Issue.10 , pp. 1840-1848
    • Ku, H.M.1    Karimi, I.A.2
  • 23
    • 3543065189 scopus 로고    scopus 로고
    • A New Model for Scheduling of Batch Process with Mixed Intermediate Storage Policies
    • Wu, J. Y.; He, X. R. A New Model for Scheduling of Batch Process with Mixed Intermediate Storage Policies J. Chin. Inst. Chem. Eng. 2004, 35 (3) 381-387
    • (2004) J. Chin. Inst. Chem. Eng. , vol.35 , Issue.3 , pp. 381-387
    • Wu, J.Y.1    He, X.R.2
  • 24
    • 2442495043 scopus 로고    scopus 로고
    • An MILP Continuous-Time Framework for Short-Term Scheduling of Multipurpose Batch Processes under Different Operation Strategies
    • Mendez, C. A.; Cerda, J. An MILP Continuous-Time Framework for Short-Term Scheduling of Multipurpose Batch Processes under Different Operation Strategies Optim. Eng. 2003, 4 (1-2) 7-22
    • (2003) Optim. Eng. , vol.4 , Issue.12 , pp. 7-22
    • Mendez, C.A.1    Cerda, J.2
  • 25
    • 0035339828 scopus 로고    scopus 로고
    • An MILP Continuous-Time Approach to Short-Term Scheduling of Resource-Constrained Multistage Flowshop Batch Facilities
    • Mendez, C. A.; Henning, G. P.; Cerda, J. An MILP Continuous-Time Approach to Short-Term Scheduling of Resource-Constrained Multistage Flowshop Batch Facilities Comput. Chem. Eng. 2001, 25 (4-6) 701-711
    • (2001) Comput. Chem. Eng. , vol.25 , Issue.46 , pp. 701-711
    • Mendez, C.A.1    Henning, G.P.2    Cerda, J.3
  • 26
    • 41149128843 scopus 로고    scopus 로고
    • Batch Selection, Assignment and Sequencing in Multi-Stage Multi-Product Processes
    • Prasad, P.; Maravelias, C. T. Batch Selection, Assignment and Sequencing in Multi-Stage Multi-Product Processes Comput. Chem. Eng. 2008, 32 (6) 1106-1119
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.6 , pp. 1106-1119
    • Prasad, P.1    Maravelias, C.T.2
  • 27
    • 41749109623 scopus 로고    scopus 로고
    • Simultaneous Batching and Scheduling in Multistage Multiproduct Processes
    • Sundaramoorthy, A.; Maravelias, C. T. Simultaneous Batching and Scheduling in Multistage Multiproduct Processes Ind. Eng. Chem. Res. 2008, 47 (5) 1546-1555
    • (2008) Ind. Eng. Chem. Res. , vol.47 , Issue.5 , pp. 1546-1555
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 28
    • 51849108013 scopus 로고    scopus 로고
    • Modeling of Storage in Batching and Scheduling of Multistage Processes
    • Sundaramoorthy, A.; Maravelias, C. T. Modeling of Storage in Batching and Scheduling of Multistage Processes Ind. Eng. Chem. Res. 2008, 47 (17) 6648-6660
    • (2008) Ind. Eng. Chem. Res. , vol.47 , Issue.17 , pp. 6648-6660
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 29
    • 67650805901 scopus 로고    scopus 로고
    • Scheduling of Multistage Batch Processes under Utility Constraints
    • Sundaramoorthy, A.; Maravelias, C. T.; Prasad, P. Scheduling of Multistage Batch Processes under Utility Constraints Ind. Eng. Chem. Res. 2009, 48 (13) 9
    • (2009) Ind. Eng. Chem. Res. , vol.48 , Issue.13 , pp. 9
    • Sundaramoorthy, A.1    Maravelias, C.T.2    Prasad, P.3
  • 30
    • 84976518397 scopus 로고    scopus 로고
    • Multiproduct Inventory Logistics Modeling in the Process Industries
    • In; Chaovalitwongse, W. Furman, K. C. Pardalos, P. M. Springer: New York -95
    • Kelly, J. D.; Zyngier, D. Multiproduct Inventory Logistics Modeling in the Process Industries. In Optimization and Logistics Challenges in the Enterprise; Chaovalitwongse, W.; Furman, K. C.; Pardalos, P. M., Eds.; Springer: New York, 2009; pp 61-95.
    • (2009) Optimization and Logistics Challenges in the Enterprise , pp. 61
    • Kelly, J.D.1    Zyngier, D.2
  • 31
    • 0041805289 scopus 로고    scopus 로고
    • Scheduling of a Multiproduct Pipeline System
    • Rejowski, R.; Pinto, J. M. Scheduling of a Multiproduct Pipeline System Comput. Chem. Eng. 2003, 27 (8-9) 1229-1246
    • (2003) Comput. Chem. Eng. , vol.27 , Issue.89 , pp. 1229-1246
    • Rejowski, R.1    Pinto, J.M.2
  • 32
    • 57049159782 scopus 로고    scopus 로고
    • Scheduling of a Continuous Plant with Recycling of Byproducts: A Case Study from a Tissue Paper Mill
    • Castro, P. M.; Westerlund, J.; Forssell, S. Scheduling of a Continuous Plant with Recycling of Byproducts: A Case Study from a Tissue Paper Mill Comput. Chem. Eng. 2009, 33 (1) 347-358
    • (2009) Comput. Chem. Eng. , vol.33 , Issue.1 , pp. 347-358
    • Castro, P.M.1    Westerlund, J.2    Forssell, S.3
  • 33
    • 67651092136 scopus 로고    scopus 로고
    • A Novel Network-Based Continuous-Time Representation for Process Scheduling: Part I. Main Concepts and Mathematical Formulation
    • Giménez, D. M.; Henning, G. P.; Maravelias, C. T. A Novel Network-Based Continuous-Time Representation for Process Scheduling: Part I. Main Concepts and Mathematical Formulation Comput. Chem. Eng. 2009, 33 (9) 1511-1528
    • (2009) Comput. Chem. Eng. , vol.33 , Issue.9 , pp. 1511-1528
    • Giménez, D.M.1    Henning, G.P.2    Maravelias, C.T.3
  • 34
    • 68549088725 scopus 로고    scopus 로고
    • A Novel Network-Based Continuous-Time Representation for Process Scheduling: Part II. General Framework
    • Giménez, D. M.; Henning, G. P.; Maravelias, C. T. A Novel Network-Based Continuous-Time Representation for Process Scheduling: Part II. General Framework Comput. Chem. Eng. 2009, 33 (10) 1644-1660
    • (2009) Comput. Chem. Eng. , vol.33 , Issue.10 , pp. 1644-1660
    • Giménez, D.M.1    Henning, G.P.2    Maravelias, C.T.3
  • 35
    • 79551710495 scopus 로고    scopus 로고
    • A General Framework for Process Scheduling
    • Sundaramoorthy, A.; Maravelias, C. T. A General Framework for Process Scheduling AIChE J. 2011, 57 (3) 695-710
    • (2011) AIChE J. , vol.57 , Issue.3 , pp. 695-710
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 36
    • 50549092936 scopus 로고    scopus 로고
    • A Tighter Continuous Time Formulation for the Cyclic Scheduling of a Mixed Plant
    • Pochet, Y.; Warichet, F. A Tighter Continuous Time Formulation for the Cyclic Scheduling of a Mixed Plant Comput. Chem. Eng. 2008, 32 (11) 2723-2744
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.11 , pp. 2723-2744
    • Pochet, Y.1    Warichet, F.2
  • 37
    • 70249129347 scopus 로고    scopus 로고
    • Polyhedral Results for Discrete-Time Production Planning MIP Formulations for Continuous Processes
    • Maravelias, C. T.; Papalamprou, K. Polyhedral Results for Discrete-Time Production Planning MIP Formulations for Continuous Processes Comput. Chem. Eng. 2009, 33 (11) 1890-1904
    • (2009) Comput. Chem. Eng. , vol.33 , Issue.11 , pp. 1890-1904
    • Maravelias, C.T.1    Papalamprou, K.2
  • 38
    • 84857444291 scopus 로고    scopus 로고
    • On the Combinatorial Structure of Discrete-Time MIP Formulations for Chemical Production Scheduling
    • Maravelias, C. T. On the Combinatorial Structure of Discrete-Time MIP Formulations for Chemical Production Scheduling Comput. Chem. Eng. 2012, 38, 204-212
    • (2012) Comput. Chem. Eng. , vol.38 , pp. 204-212
    • Maravelias, C.T.1
  • 39
    • 0026143149 scopus 로고
    • Reformulation of Multiperiod MILP Models for Planning and Scheduling of Chemical Processes
    • Sahinidis, N. V.; Grossmann, I. E. Reformulation of Multiperiod MILP Models for Planning and Scheduling of Chemical Processes Comput. Chem. Eng. 1991, 15 (4) 255-272
    • (1991) Comput. Chem. Eng. , vol.15 , Issue.4 , pp. 255-272
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 40
    • 0000965083 scopus 로고    scopus 로고
    • Improving the Efficiency of Discrete Time Scheduling Formulation
    • Yee, K. L.; Shah, N. Improving the Efficiency of Discrete Time Scheduling Formulation Comput. Chem. Eng. 1998, 22 (Suppl. 1) S403-S410
    • (1998) Comput. Chem. Eng. , vol.22 , Issue.SUPPL.. 1
    • Yee, K.L.1    Shah, N.2
  • 41
    • 22944446817 scopus 로고    scopus 로고
    • Review, Extensions and Computational Comparison of MILP Formulations for Scheduling of Batch Processes
    • Burkard, R. E.; Hatzl, J. Review, Extensions and Computational Comparison of MILP Formulations for Scheduling of Batch Processes Comput. Chem. Eng. 2005, 29 (8) 1752-1769
    • (2005) Comput. Chem. Eng. , vol.29 , Issue.8 , pp. 1752-1769
    • Burkard, R.E.1    Hatzl, J.2
  • 42
    • 0344063349 scopus 로고    scopus 로고
    • Minimization of the Makespan with a Discrete-Time State-Task Network Formulation
    • Maravelias, C. T.; Grossmann, I. E. Minimization of the Makespan with a Discrete-Time State-Task Network Formulation Ind. Eng. Chem. Res. 2003, 42 (24) 6252-6257
    • (2003) Ind. Eng. Chem. Res. , vol.42 , Issue.24 , pp. 6252-6257
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 43
    • 30344468781 scopus 로고    scopus 로고
    • A Decomposition Framework for the Scheduling of Single-and Multi-Stage Processes
    • Maravelias, C. T. A Decomposition Framework for the Scheduling of Single-and Multi-Stage Processes Comput. Chem. Eng. 2006, 30 (3) 407-420
    • (2006) Comput. Chem. Eng. , vol.30 , Issue.3 , pp. 407-420
    • Maravelias, C.T.1
  • 44
    • 38849197825 scopus 로고    scopus 로고
    • Improving Unit-Specific Event Based Continuous-Time Approaches for Batch Processes: Integrality Gap and Task Splitting
    • Janak, S. L.; Floudas, C. A. Improving Unit-Specific Event Based Continuous-Time Approaches for Batch Processes: Integrality Gap and Task Splitting Comput. Chem. Eng. 2008, 32 (4-5) 913-955
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.45 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 45
    • 68749118271 scopus 로고    scopus 로고
    • Simultaneous Batching and Scheduling Using Dynamic Decomposition on a Grid
    • Ferris, M.; Maravelias, C. T.; Sundaramoorthy, A. Simultaneous Batching and Scheduling Using Dynamic Decomposition on a Grid INFORMS J. Comput. 2009, 21 (3) 13
    • (2009) INFORMS J. Comput. , vol.21 , Issue.3 , pp. 13
    • Ferris, M.1    Maravelias, C.T.2    Sundaramoorthy, A.3
  • 46
    • 79955536361 scopus 로고    scopus 로고
    • Computational Study of Network-Based Mixed-Integer Programming Approaches for Chemical Production Scheduling
    • Sundaramoorthy, A.; Maravelias, C. T. Computational Study of Network-Based Mixed-Integer Programming Approaches for Chemical Production Scheduling Ind. Eng. Chem. Res. 2011, 50 (9) 5023-5040
    • (2011) Ind. Eng. Chem. Res. , vol.50 , Issue.9 , pp. 5023-5040
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 47
    • 84874546620 scopus 로고    scopus 로고
    • Valid Inequalities Based on Demand Propagation for Chemical Production Scheduling MIP Models
    • Velez, S.; Sundaramoorthy, A.; Maravelias, C. T. Valid Inequalities Based on Demand Propagation for Chemical Production Scheduling MIP Models AIChE J. 2013, 59 (3) 872-887
    • (2013) AIChE J. , vol.59 , Issue.3 , pp. 872-887
    • Velez, S.1    Sundaramoorthy, A.2    Maravelias, C.T.3
  • 48
    • 84875778960 scopus 로고    scopus 로고
    • Multiple and Nonuniform Time Grids in Discrete-Time MIP Models for Chemical Production Scheduling
    • in press; DOI: 10.1016/j.compchemeng.2013.01.014
    • Velez, S.; Maravelias, C. T. Multiple and Nonuniform Time Grids in Discrete-Time MIP Models for Chemical Production Scheduling. Comput. Chem. Eng., in press; DOI: 10.1016/j.compchemeng.2013.01.014.
    • Comput. Chem. Eng.
    • Velez, S.1    Maravelias, C.T.2
  • 49
    • 84874902668 scopus 로고    scopus 로고
    • A Mixed-Integer Programming Model and Tightening Methods for Scheduling in General Chemical Production Environments
    • published online Feb 1, 2013, 10.1021/ie302741b
    • Velez, S.; Maravelias, C. T. A Mixed-Integer Programming Model and Tightening Methods for Scheduling in General Chemical Production Environments. Ind. Eng. Chem. Res., published online Feb 1, 2013, 10.1021/ie302741b.
    • Ind. Eng. Chem. Res.
    • Velez, S.1    Maravelias, C.T.2
  • 50
    • 0030085944 scopus 로고    scopus 로고
    • Optimal Campaign Planning Scheduling of Multipurpose Batch Semicontinuous Plants. 1. Mathematical Formulation
    • Papageorgiou, L. G.; Pantelides, C. C. Optimal Campaign Planning Scheduling of Multipurpose Batch Semicontinuous Plants. 1. Mathematical Formulation Ind. Eng. Chem. Res. 1996, 35 (2) 488-509
    • (1996) Ind. Eng. Chem. Res. , vol.35 , Issue.2 , pp. 488-509
    • Papageorgiou, L.G.1    Pantelides, C.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.