메뉴 건너뛰기




Volumn 51, Issue 21, 2012, Pages 7300-7319

Production scheduling of a large-scale steelmaking continuous casting process via unit-specific event-based continuous-time models: Short-term and medium-term scheduling

Author keywords

[No Author keywords available]

Indexed keywords

COMPLEX OPTIMIZATION; COMPUTATIONAL RESULTS; CONTINUOUS CASTING PROCESS; CONTINUOUS TIME; CONTINUOUS TIME MODELS; EVENT-BASED; FLOW-TIME; INDUSTRIAL PROBLEM; INTEGER SOLUTIONS; IRON AND STEEL; MIXED-INTEGER LINEAR OPTIMIZATIONS; OPTIMAL SCHEDULING; PRODUCTION COST; PRODUCTION SCHEDULING; ROLLING HORIZON; SCHEDULING MODELS;

EID: 84866929231     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie2015944     Document Type: Article
Times cited : (55)

References (54)
  • 1
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang, L. X.; Liu, J. Y.; Rong, A. Y.; Yang, Z. H. A Review of Planning and Scheduling Systems and Methods for Integrated Steel Production. Eur. J. Oper. Res. 2001, 133, 1-20.
    • (2001) Eur. J. Oper. Res. , vol.133 , pp. 1-20
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 2
    • 70449590249 scopus 로고    scopus 로고
    • A scheduling system for the steelmaking continuous casting process. A case study from the steel-making industry
    • Missbauer, H.; Hauber, W.; Stadler, W. A Scheduling System for the Steelmaking Continuous Casting Process. A Case Study from the Steel-Making Industry. J. Prod. Res. 2009, 47, 4147-4172.
    • (2009) J. Prod. Res. , vol.47 , pp. 4147-4172
    • Missbauer, H.1    Hauber, W.2    Stadler, W.3
  • 3
    • 0037050386 scopus 로고    scopus 로고
    • Steel-making process scheduling using lagrangian relaxation
    • Tang, L. X.; Lih, P. B.; Liu, J. Y.; Fang, L. Steel-Making Process Scheduling using Lagrangian Relaxation. Int. J. Prod. Res. 2002, 40, 55-70.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 55-70
    • Tang, L.X.1    Lih, P.B.2    Liu, J.Y.3    Fang, L.4
  • 4
    • 0033892353 scopus 로고    scopus 로고
    • A mathematical programming model for scheduling steelmaking-continuous casting production
    • Tang, L. X.; Liu, J. Y.; Rong, A. Y.; Yang, Z. H. A Mathematical Programming Model for Scheduling Steelmaking-Continuous Casting Production. Eur. J. Oper. Res. 2000, 120, 423-435.
    • (2000) Eur. J. Oper. Res. , vol.120 , pp. 423-435
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 5
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant
    • Harjunkoski, I.; Grossmann, I. E. A Decomposition Approach for the Scheduling of a Steel Plant. Comput. Chem. Eng. 2001, 25, 1647-1660.
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 6
    • 33748751184 scopus 로고    scopus 로고
    • A mixed-integer linear programming model for the continuous casting planning
    • Bellabdaoui, A.; Teghem, J. A Mixed-Integer Linear Programming Model for the Continuous Casting Planning. Int. J. Prod. Econ. 2006, 104, 260-270.
    • (2006) Int. J. Prod. Econ. , vol.104 , pp. 260-270
    • Bellabdaoui, A.1    Teghem, J.2
  • 8
    • 34249044485 scopus 로고    scopus 로고
    • Metaheuristics for meltshop scheduling in the steel industry
    • Huegler, P. A.; Vasko, F. J. Metaheuristics for Meltshop Scheduling in the Steel Industry. J. Oper. Res. Soc. 2007, 58, 791-796.
    • (2007) J. Oper. Res. Soc. , vol.58 , pp. 791-796
    • Huegler, P.A.1    Vasko, F.J.2
  • 9
    • 70449602086 scopus 로고    scopus 로고
    • A heuristic algorithm for scheduling the steelmaking continuous casting process
    • Bellabdaoui, A.; Fiordaliso, A.; Teghem, J. A Heuristic Algorithm for Scheduling the Steelmaking Continuous Casting Process. Pac. J. Optim. 2005, 1, 447-464.
    • (2005) Pac. J. Optim. , vol.1 , pp. 447-464
    • Bellabdaoui, A.1    Fiordaliso, A.2    Teghem, J.3
  • 10
    • 84856063669 scopus 로고    scopus 로고
    • GA-cdfm based hybrid optimization method for steelmaking scheduling and caster operation
    • Luo, X. C.; Na, C. Z. GA-CDFM Based Hybrid Optimization Method for Steelmaking Scheduling and Caster Operation. Adv. Mater. Res. 2012, 424-425, 994-998.
    • (2012) Adv. Mater. Res. , vol.424-425 , pp. 994-998
    • Luo, X.C.1    Na, C.Z.2
  • 11
    • 83755161490 scopus 로고    scopus 로고
    • Hybrid genetic algorithm-based production planning for steelmaking and continuous casting process
    • Zhu, D. F.; Hua, W.; Wang, S. B.; Xu, J. X. Hybrid Genetic Algorithm-Based Production Planning for Steelmaking and Continuous Casting Process. Adv. Mater. Res. 2012, 383-390, 1677-1683.
    • (2012) Adv. Mater. Res. , vol.383-390 , pp. 1677-1683
    • Zhu, D.F.1    Hua, W.2    Wang, S.B.3    Xu, J.X.4
  • 12
    • 84863261660 scopus 로고    scopus 로고
    • Steel-making and continuous/ingot casting scheduling of mixed charging plan based on batch splitting policy
    • Liu, W.; Sun, L. Steel-Making and Continuous/Ingot Casting Scheduling of Mixed Charging Plan Based on Batch Splitting Policy. J. Iron Steel Res. Int. 2012, 19, 17-21.
    • (2012) J. Iron Steel Res. Int. , vol.19 , pp. 17-21
    • Liu, W.1    Sun, L.2
  • 13
    • 79952459535 scopus 로고    scopus 로고
    • Simulation based genetic algorithm for production planning of steelmaking continuous castig process
    • Lu, K. B.; Huang, K. W.; Zhang, R. Y.; Wang, D. W. Simulation Based Genetic Algorithm for Production Planning of Steelmaking Continuous Castig Process. Control Decision 2011, 26, 137-140.
    • (2011) Control Decision , vol.26 , pp. 137-140
    • Lu, K.B.1    Huang, K.W.2    Zhang, R.Y.3    Wang, D.W.4
  • 14
    • 84866947094 scopus 로고    scopus 로고
    • Discrete-event simulation in steel manufacturing: A case study
    • Stellenbosch, South Africa
    • Bekker, J. Discrete-Event Simulation in Steel Manufacturing: A Case Study. In International Conference on Competitive Manufacturing, Stellenbosch, South Africa, 2001; pp 469-476.
    • (2001) International Conference on Competitive Manufacturing , pp. 469-476
    • Bekker, J.1
  • 15
    • 33748756829 scopus 로고    scopus 로고
    • Computer simulation of the steelmaking process with arena
    • Um, W. S. Computer Simulation of the Steelmaking Process with ARENA. J. Korean Soc. Maint. Eng. 2002, 7, 77-90.
    • (2002) J. Korean Soc. Maint. Eng. , vol.7 , pp. 77-90
    • Um, W.S.1
  • 16
    • 0346607177 scopus 로고    scopus 로고
    • A survey of mathematical programming applications in integrated steel plants
    • Dutta, G.; Fourer, R. A Survey of Mathematical Programming Applications in Integrated Steel Plants. Manuf. Serv. Oper. Manage. 2001, 3, 387-400.
    • (2001) Manuf. Serv. Oper. Manage. , vol.3 , pp. 387-400
    • Dutta, G.1    Fourer, R.2
  • 18
    • 84866946212 scopus 로고    scopus 로고
    • A review of production planning and scheduling in iron and steel supply chain
    • Li, J. X.; Tang, L. X. A Review of Production Planning and Scheduling in Iron and Steel Supply Chain. Control Eng. China 2010, 17, 123-126.
    • (2010) Control Eng. China , vol.17 , pp. 123-126
    • Li, J.X.1    Tang, L.X.2
  • 19
    • 58549106334 scopus 로고    scopus 로고
    • A novel hybrid algorithm for scheduling steelmaking continuous casting production
    • Atighehchian, A.; Bijari, M.; Tarkesh, H. A Novel Hybrid Algorithm for Scheduling Steelmaking Continuous Casting Production. Comput. Oper. Res. 2009, 36, 2450-2461.
    • (2009) Comput. Oper. Res. , vol.36 , pp. 2450-2461
    • Atighehchian, A.1    Bijari, M.2    Tarkesh, H.3
  • 20
    • 33846049584 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant. i. Short-term and medium-term scheduling
    • Janak, S. L.; Floudas, C. A.; Kallrath, J.; Vormbrock, N. Production Scheduling of a Large-Scale Industrial Batch Plant. I. Short-Term and Medium-Term Scheduling. Ind. Eng. Chem. Res. 2006, 45, 8234-8252.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 8234-8252
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 21
    • 0000142257 scopus 로고
    • Cooperative scheduling and its application to steelmaking processes
    • Numao, M.; Morishita, S. I. Cooperative Scheduling and Its Application to Steelmaking Processes. IEEE Trans. Ind. Electron. 1991, 38, 150-155.
    • (1991) IEEE Trans. Ind. Electron. , vol.38 , pp. 150-155
    • Numao, M.1    Morishita, S.I.2
  • 22
    • 79954425247 scopus 로고    scopus 로고
    • A combination of lagrangian relaxation and column generation for order batching in steelmaking and continuous-casting production
    • Tang, L. X.; Wang, G. S.; Liu, J. Y.; Liu, J. A Combination of Lagrangian Relaxation and Column Generation for Order Batching in Steelmaking and Continuous-Casting Production. Naval Res. Logistics 2011, 58, 370-388.
    • (2011) Naval Res. Logistics , vol.58 , pp. 370-388
    • Tang, L.X.1    Wang, G.S.2    Liu, J.Y.3    Liu, J.4
  • 23
    • 0037036735 scopus 로고    scopus 로고
    • Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
    • Lin, X.; Floudas, C. A.; Modi, S.; Juhasz, N. M. Continuous-Time Optimization Approach for Medium-Range Production Scheduling of a Multiproduct Batch Plant. Ind. Eng. Chem. Res. 2002, 41, 3884-3906.
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 3884-3906
    • Lin, X.1    Floudas, C.A.2    Modi, S.3    Juhasz, N.M.4
  • 24
    • 49249099572 scopus 로고    scopus 로고
    • Integrated operational planning and medium-term scheduling for large-scale industrial batch plants
    • Verderame, P. M.; Floudas, C. A. Integrated Operational Planning and Medium-Term Scheduling for Large-Scale Industrial Batch Plants. Ind. Eng. Chem. Res. 2008, 47 (14), 4845-4860.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , Issue.14 , pp. 4845-4860
    • Verderame, P.M.1    Floudas, C.A.2
  • 25
    • 63749087988 scopus 로고    scopus 로고
    • Operational planning framework for multisite production and distribution networks
    • Verderame, P. M.; Floudas, C. A. Operational Planning Framework for Multisite Production and Distribution Networks. Comput. Chem. Eng. 2009, 33 (5), 1036-1050.
    • (2009) Comput. Chem. Eng. , vol.33 , Issue.5 , pp. 1036-1050
    • Verderame, P.M.1    Floudas, C.A.2
  • 26
    • 68849109211 scopus 로고    scopus 로고
    • Operational planning of large-scale industrial batch plants under demand due date and amount uncertainty: I. robust optimization framework
    • Verderame, P. M.; Floudas, C. A. Operational Planning of Large-Scale Industrial Batch Plants under Demand Due Date and Amount Uncertainty: I. Robust Optimization Framework. Ind. Eng. Chem. Res. 2010, 48, 7214-7231.
    • (2010) Ind. Eng. Chem. Res. , vol.48 , pp. 7214-7231
    • Verderame, P.M.1    Floudas, C.A.2
  • 27
    • 74249090426 scopus 로고    scopus 로고
    • Operational planning of large-scale industrial batch plants under demand due date and amount uncertainty: Ii. contional value-at-risk framework
    • Verderame, P. M.; Floudas, C. A. Operational Planning of Large-Scale Industrial Batch Plants under Demand Due Date and Amount Uncertainty: II. Contional Value-at-Risk Framework. Ind. Eng. Chem. Res. 2010, 49, 260-275.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 260-275
    • Verderame, P.M.1    Floudas, C.A.2
  • 28
    • 77952403402 scopus 로고    scopus 로고
    • Integration of operational planning and medium-term scheduling for large-scale industrial batch plants under demand and processing time uncertainty
    • Verderame, P. M.; Floudas, C. A. Integration of Operational Planning and Medium-Term Scheduling for Large-Scale Industrial Batch Plants under Demand and Processing Time Uncertainty. Ind. Eng. Chem. Res. 2010, 49, 4948-4965.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 4948-4965
    • Verderame, P.M.1    Floudas, C.A.2
  • 29
    • 79955528820 scopus 로고    scopus 로고
    • Multisite planning under demand and transportation uncertainty: Robust optimization and contitional value at risk framework
    • Verderame, P. M.; Floudas, C. A. Multisite Planning under Demand and Transportation Uncertainty: Robust Optimization and Contitional Value at Risk Framework. Ind. Eng. Chem. Res. 2011, 50, 4959-4982.
    • (2011) Ind. Eng. Chem. Res. , vol.50 , pp. 4959-4982
    • Verderame, P.M.1    Floudas, C.A.2
  • 30
    • 59249096047 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling
    • Shaik, M. A.; Floudas, C. A.; Kallrath, J.; Pitz, H.-J. Production Scheduling of a Large-Scale Industrial Continuous Plant: Short-Term and Medium-Term Scheduling. Comput. Chem. Eng. 2009, 33, 670-686.
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 670-686
    • Shaik, M.A.1    Floudas, C.A.2    Kallrath, J.3    Pitz, H.-J.4
  • 31
    • 0037109620 scopus 로고    scopus 로고
    • The alternative graph formulation for solving complex factory scheduling problems
    • Pacciarelli, D. The Alternative Graph Formulation for Solving Complex Factory Scheduling Problems. Int. J. Prod. Res. 2002, 40, 3641-3653.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 3641-3653
    • Pacciarelli, D.1
  • 32
    • 9644281095 scopus 로고    scopus 로고
    • Production scheduling in a steelmaking continuous casting plant
    • Pacciarelli, D.; Pranzo, M. Production Scheduling in a Steelmaking Continuous Casting Plant. Comput. Chem. Eng. 2004, 28, 2823-2835.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2823-2835
    • Pacciarelli, D.1    Pranzo, M.2
  • 33
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas, C. A.; Lin, X. Continuous-Time versus Discrete-Time Approaches for Scheduling of Chemical Processes: A Review. Comput. Chem. Eng. 2004, 8, 2109-2129.
    • (2004) Comput. Chem. Eng. , vol.8 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 34
    • 25144491255 scopus 로고    scopus 로고
    • Mixed-integer linear programming in processing scheduling: Modeling, algorithms, and applications
    • Floudas, C. A.; Lin, X. Mixed-Integer Linear Programming in Processing Scheduling: Modeling, Algorithms, and Applications. Ann. Oper. Res. 2005, 139, 131-162.
    • (2005) Ann. Oper. Res. , vol.139 , pp. 131-162
    • Floudas, C.A.1    Lin, X.2
  • 35
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 1. multipurpose batch processes
    • Ierapetritou, M. G.; Floudas, C. A. Effective Continuous-Time Formulation for Short-Term Scheduling: 1. Multipurpose Batch Processes. Ind. Eng. Chem. Res. 1998, 37, 4341-4359.
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 36
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. continuous and semi-continuous process
    • Ierapetritou, M. G.; Floudas, C. A. Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semi-Continuous Process. Ind. Eng. Chem. Res. 1998, 37, 4360-4374.
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 37
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 3. multiple intermediate due dates
    • Ierapetritou, M. G.; Hene, T. S.; Floudas, C. A. Effective Continuous-Time Formulation for Short-Term Scheduling. 3. Multiple Intermediate Due Dates. Ind. Eng. Chem. Res. 1999, 38, 3446-3461.
    • (1999) Ind. Eng. Chem. Res. , vol.38 , pp. 3446-3461
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 38
    • 0035340986 scopus 로고    scopus 로고
    • Synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation
    • Lin, X. X.; Floudas, C. A. Design, Synthesis and Scheduling of Multipurpose Batch Plants via an Effective Continuous-Time Formulation. Comput. Chem. Eng. 2001, 25, 665-674.
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 665-674
    • Lin, X.X.1    Design, A.F.C.2
  • 39
    • 0037036735 scopus 로고    scopus 로고
    • Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
    • Lin, X. X.; Floudas, C. A.; Modi, S.; Juhasz, N. M. Continuous-Time Optimization Approach for Medium-Range Production Scheduling of a Multiproduct Batch Plant. Ind. Eng. Chem. Res. 2002, 41, 3884-3906.
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 3884-3906
    • Lin, X.X.1    Floudas, C.A.2    Modi, S.3    Juhasz, N.M.4
  • 40
    • 0141678021 scopus 로고    scopus 로고
    • Schedulign of tankder lightering via a novel continuous-time optimization framework
    • Lin, X. X.; Chajakis, E. D.; Floudas, C. A. Schedulign of Tankder Lightering via a Novel Continuous-Time Optimization Framework. Ind. Eng. Chem. Res. 2003, 42, 4441-4451.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 4441-4451
    • Lin, X.X.1    Chajakis, E.D.2    Floudas, C.A.3
  • 41
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for shor-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • Janak, S. L.; Lin, X.; Floudas, C. A. Enhanced Continuous-Time Unit-Specific Event-Based Formulation for Shor-Term Scheduling of Multipurpose Batch Processes: Resource Constraints and Mixed Storage Policies. Ind. Eng. Chem. Res. 2004, 43, 2516-2533.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 42
    • 11844290763 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • Janak, S. L.; Lin, X. X.; Floudas, C. A. Comments on "Enhanced Continuous-Time Unit-Specific Event-Based Formulation for Short-Term Scheduling of Multipurpose Batch Processes: Resource Constraints and Mixed Storage Policies". Ind. Eng. Chem. Res. 2005, 44, 426-.
    • (2005) Ind. Eng. Chem. Res. , vol.44
    • Janak, S.L.1    Lin, X.X.2    On Comments, A.F.C.3
  • 43
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event-based continuous-time approaches for batch processes: Integrality gap and task splitting
    • Janak, S. L.; Floudas, C. A. Improving Unit-Specific Event-Based Continuous-Time Approaches for Batch processes: Integrality Gap and Task Splitting. Comput. Chem. Eng. 2008, 32, 913-955.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 44
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: A comparative study
    • Shaik, M. A.; Janak, S. L.; Floudas, C. A. Continuous-Time Models for Short-Term Scheduling of Multipurpose Batch Plants: A Comparative Study. Ind. Eng. Chem. Res. 2006, 45, 6190-6209.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 45
    • 33947498929 scopus 로고    scopus 로고
    • Improved unit-specific event-based model continuous-time model for short-term scheduling of continuous processes: Rigorous treatment of storage requirement
    • Shaik, M. A.; Floudas, C. A. Improved Unit-Specific Event-Based Model Continuous-Time Model for Short-Term Scheduling of Continuous Processes: Rigorous Treatment of Storage Requirement. Ind. Eng. Chem. Res. 2007, 46, 1764-1779.
    • (2007) Ind. Eng. Chem. Res. , vol.46 , pp. 1764-1779
    • Shaik, M.A.1    Floudas, C.A.2
  • 46
    • 35549009402 scopus 로고    scopus 로고
    • Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using rtn framework
    • Shaik, M. A.; Floudas, C. A. Unit-Specific Event-Based Continuous-Time Approach for Short-Term Scheduling of Batch Plants Using RTN Framework. Comput. Chem. Eng. 2008, 32, 260-274.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 260-274
    • Shaik, M.A.1    Floudas, C.A.2
  • 47
    • 65349119397 scopus 로고    scopus 로고
    • Novel unified modeling approach for short-term scheduling
    • Shaik, M. A.; Floudas, C. A. Novel Unified Modeling Approach for Short-Term Scheduling. Ind. Eng. Chem. Res. 2009, 48, 2947-2964.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 2947-2964
    • Shaik, M.A.1    Floudas, C.A.2
  • 48
    • 79955548378 scopus 로고    scopus 로고
    • Optimal event point determination for short-term scheduling of multipurpose batch plants via unit-specific event-based continuous-time approaches
    • Li, J.; Floudas, C. A. Optimal Event Point Determination for Short-Term Scheduling of Multipurpose Batch Plants via Unit-Specific Event-Based Continuous-Time Approaches. Ind. Eng. Chem. Res. 2010, 49, 7446-7469.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 7446-7469
    • Li, J.1    Floudas, C.A.2
  • 49
    • 83255192156 scopus 로고    scopus 로고
    • Continuous-time modeling and global optimization approach for scheduling of crude oil operations
    • Li, J.; Misener, R.; Floudas, C. A. Continuous-Time Modeling and Global Optimization Approach for Scheduling of Crude Oil Operations. AIChE J. 2012, 58, 205-226.
    • (2012) AIChE J. , vol.58 , pp. 205-226
    • Li, J.1    Misener, R.2    Floudas, C.A.3
  • 50
    • 84859158409 scopus 로고    scopus 로고
    • Optimization framework for process scheduling of sequence-dependent automobile assembly line
    • Tang, Q. H.; Li, J.; Floudas, C. A.; Deng, M. X.; Yan, Y. B.; Xi, Z. H.; Chen, P. H.; Kong, J. Y. Optimization Framework for Process Scheduling of Sequence-Dependent Automobile Assembly Line. Optim. Lett. 2012, 6, 797-824.
    • (2012) Optim. Lett. , vol.6 , pp. 797-824
    • Tang, Q.H.1    Li, J.2    Floudas, C.A.3    Deng, M.X.4    Yan, Y.B.5    Xi, Z.H.6    Chen, P.H.7    Kong, J.Y.8
  • 51
    • 33845624253 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: Ii. uncertainty with known probability distribution
    • Janak, S. L.; Lin, X.; Floudas, C. A. A New Robust Optimization Approach for Scheduling under Uncertainty: II. Uncertainty with Known Probability Distribution. Comput. Chem. Eng. 2007, 31, 171-195.
    • (2007) Comput. Chem. Eng. , vol.31 , pp. 171-195
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 52
    • 33846071077 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant. ii. reactive scheduling
    • Janak, S. L.; Floudas, C. A.; Kallrath, J.; Vormbrock, N. Production Scheduling of a Large-Scale Industrial Batch Plant. II. Reactive Scheduling. Ind. Eng. Chem. Res. 2006, 45, 8253-8269.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 8253-8269
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 53
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I. bounded uncertainty
    • Lin, X.; Janak, S. L.; Floudas, C. A. A New Robust Optimization Approach for Scheduling under Uncertainty: I. Bounded Uncertainty. Comput. Chem. Eng. 2004, 28, 1069-1085.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 54
    • 84863571593 scopus 로고    scopus 로고
    • Scheduling of crude oil operations under demand uncertainty: A robust optimization framework coupled with global optimization
    • DOI: 10.1002/aic.12772
    • Li, J.; Misener, R.; Floudas, C. A. Scheduling of Crude Oil Operations under Demand Uncertainty: A Robust Optimization Framework Coupled with Global Optimization. AIChE J. 2012, DOI: 10.1002/aic.12772.
    • (2012) AIChE J.
    • Li, J.1    Misener, R.2    Floudas, C.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.