메뉴 건너뛰기




Volumn 37, Issue 11, 1998, Pages 4341-4359

Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes

Author keywords

[No Author keywords available]

Indexed keywords

INDUSTRIAL PLANTS; INTEGER PROGRAMMING; MATHEMATICAL MODELS; NONLINEAR PROGRAMMING; PROBLEM SOLVING; SCHEDULING;

EID: 0032216021     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie970927g     Document Type: Article
Times cited : (477)

References (2)
  • 2
    • 0027545176 scopus 로고
    • A General Algorithm for Short-Term Scheduling of Batch Operations - I. MILP Formulation
    • Kondili, E.; Pantelides, C. C.; Sargent, R. A General Algorithm for Short-Term Scheduling of Batch Operations - I. MILP Formulation. Comput. Chem. Eng. 1993, 17, 211.
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.