메뉴 건너뛰기




Volumn 59, Issue 4, 2005, Pages 467-497

Operations research in passenger railway transportation

Author keywords

Literature review; Optimization; Overview on planning problems arising at Netherlands Railways

Indexed keywords


EID: 27144535175     PISSN: 00390402     EISSN: 14679574     Source Type: Journal    
DOI: 10.1111/j.1467-9574.2005.00303.x     Document Type: Article
Times cited : (125)

References (83)
  • 1
    • 27144491426 scopus 로고    scopus 로고
    • Reinventing crew scheduling at Netherlands Railways
    • Tech. rept. ERS-2004-046-LIS. Erasmus Research Institute of Management, Erasmus University Rotterdam, the Netherlands, to appear in
    • ABBINK, E., M. FISCHETTI, L. G. KROON, G. TIMMER and M. J. C. M. VROMANS (2004a), Reinventing crew scheduling at Netherlands Railways, Tech. rept. ERS-2004-046-LIS. Erasmus Research Institute of Management, Erasmus University Rotterdam, the Netherlands, to appear in Interfaces.
    • (2004) Interfaces
    • Abbink, E.1    Fischetti, M.2    Kroon, L.G.3    Timmer, G.4    Vromans, M.J.C.M.5
  • 4
    • 0019230108 scopus 로고
    • Models for rail transportation
    • ASSAD, A. A. (1980), Models for rail transportation, Transportation Research A 14, 205-220.
    • (1980) Transportation Research A , vol.14 , pp. 205-220
    • Assad, A.A.1
  • 6
    • 0039506457 scopus 로고    scopus 로고
    • Schedule optimization at SNCF: From conception to day of departure
    • BEN-KHEDHER, N., J. KINTANAR, C. QUEILLE and W. STRIPLING (1998), Schedule optimization at SNCF: From conception to day of departure, Interfaces 28, 6-23.
    • (1998) Interfaces , vol.28 , pp. 6-23
    • Ben-Khedher, N.1    Kintanar, J.2    Queille, C.3    Stripling, W.4
  • 7
    • 0030408029 scopus 로고    scopus 로고
    • Railroad capacity and traffic analysis using SIMON
    • B. MELLITT et al. (eds), WIT Press, Southampton
    • BERGMARK, R. (1996), Railroad capacity and traffic analysis using SIMON, in: B. MELLITT et al. (eds), Computers in Railways V, WIT Press, Southampton, 183-191.
    • (1996) Computers in Railways V , pp. 183-191
    • Bergmark, R.1
  • 8
    • 0042205090 scopus 로고    scopus 로고
    • Using integer programming to solve the train-platforming problem
    • BILLIONNET, A. (2003), Using integer programming to solve the train-platforming problem, Transportation Science 37, 213-222.
    • (2003) Transportation Science , vol.37 , pp. 213-222
    • Billionnet, A.1
  • 14
    • 0033351565 scopus 로고    scopus 로고
    • A heuristic algorithm for the Set Covering Problem
    • CAPRARA, A., M. FISCHETTI and P. TOTH (1999), A heuristic algorithm for the Set Covering Problem, Operations Research 47, 730-743.
    • (1999) Operations Research , vol.47 , pp. 730-743
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 15
    • 0028530808 scopus 로고
    • A model and strategy for train pathing with choice of lines, platforms and routes
    • CAREY, M. (1994), A model and strategy for train pathing with choice of lines, platforms and routes, Transportation Research Part B 28, 333-353.
    • (1994) Transportation Research Part B , vol.28 , pp. 333-353
    • Carey, M.1
  • 16
    • 0031594060 scopus 로고    scopus 로고
    • Optimizing scheduled times, allowing for behavioural response
    • CAREY, M. (1998), Optimizing scheduled times, allowing for behavioural response, Transportation Research Part B 32, 329-342.
    • (1998) Transportation Research Part B , vol.32 , pp. 329-342
    • Carey, M.1
  • 17
    • 0032885173 scopus 로고    scopus 로고
    • Ex ante heuristic measures of schedule reliability
    • CAREY, M. (1999), Ex ante heuristic measures of schedule reliability, Transportation Research Part B 33, 473-494.
    • (1999) Transportation Research Part B , vol.33 , pp. 473-494
    • Carey, M.1
  • 18
    • 0037355373 scopus 로고    scopus 로고
    • Scheduling and platforming trains at busy complex stations
    • CAREY, M. and S. CARVILLE (2003), Scheduling and platforming trains at busy complex stations, Transportation Research Part A 37, 195-224.
    • (2003) Transportation Research Part A , vol.37 , pp. 195-224
    • Carey, M.1    Carville, S.2
  • 19
    • 0011074380 scopus 로고
    • Properties of expected costs and performance measures in stochastic models of scheduled transport
    • CAREY, M. and A. KWIECIŃSKI (1995), Properties of expected costs and performance measures in stochastic models of scheduled transport, European Journal of Operational Research 83, 182-199.
    • (1995) European Journal of Operational Research , vol.83 , pp. 182-199
    • Carey, M.1    Kwieciński, A.2
  • 20
    • 0032203702 scopus 로고    scopus 로고
    • A survey of optimization models for train routing and scheduling
    • CORDEAU, J.-F., P. TOTH and D. VIGO (1998), A survey of optimization models for train routing and scheduling, Transportation Science 32, 380-404.
    • (1998) Transportation Science , vol.32 , pp. 380-404
    • Cordeau, J.-F.1    Toth, P.2    Vigo, D.3
  • 21
    • 0034187909 scopus 로고    scopus 로고
    • A Benders decomposition approach for the locomotive and car assignment problem
    • CORDEAU, J.-F., F. SOUMIS and J. DESROSIERS (2000), A Benders decomposition approach for the locomotive and car assignment problem, Transportation Science 34, 133-149.
    • (2000) Transportation Science , vol.34 , pp. 133-149
    • Cordeau, J.-F.1    Soumis, F.2    Desrosiers, J.3
  • 22
    • 0034751170 scopus 로고    scopus 로고
    • Simultaneous assignment of locomotives and cars to passenger trains
    • CORDEAU, J.-F., F. SOUMIS and J. DESROSIERS (2001), Simultaneous assignment of locomotives and cars to passenger trains. Operations Research 49, 531-548.
    • (2001) Operations Research , vol.49 , pp. 531-548
    • Cordeau, J.-F.1    Soumis, F.2    Desrosiers, J.3
  • 24
    • 0004596365 scopus 로고
    • Schedule synchronization for public transit networks
    • DOMSCHKE, W. (1989), Schedule synchronization for public transit networks, OR Spektrum 11, 17-24.
    • (1989) OR Spektrum , vol.11 , pp. 17-24
    • Domschke, W.1
  • 25
    • 27144436259 scopus 로고    scopus 로고
    • A rolling stock circulation model for combining and splitting of passenger trains
    • Tech. rept. PNA-E0420, Center for Mathematics and Computer Science, Amsterdam, to appear in
    • FIOOLE, P.-J., L. G. KROON, G. MARÓTI and A. SCHRIJVER (2004), A rolling stock circulation model for combining and splitting of passenger trains, Tech. rept. PNA-E0420, Center for Mathematics and Computer Science, Amsterdam, to appear in European Journal of Operational Research.
    • (2004) European Journal of Operational Research
    • Fioole, P.-J.1    Kroon, L.G.2    Maróti, G.3    Schrijver, A.4
  • 27
    • 27144541217 scopus 로고    scopus 로고
    • Estimates on rolling stock and crew in DSB S-tog based on timetables
    • Tech. rept. DSBS-tog, submitted to Lecture Notes in Computer Science, Springer
    • FOLKMANN, M., J. JESPERSEN and M. N. NIELSEN (2004), Estimates on rolling stock and crew in DSB S-tog based on timetables, Tech. rept. DSBS-tog, submitted to Algorithmic Methods for Railway Optimization, Lecture Notes in Computer Science, Springer.
    • (2004) Algorithmic Methods for Railway Optimization
    • Folkmann, M.1    Jespersen, J.2    Nielsen, M.N.3
  • 28
    • 0010651659 scopus 로고    scopus 로고
    • Experiences with a flexible driver scheduler
    • S. Voß and J. R. DADUNA (eds), Springer, Berlin
    • FORES, S., L. PROLL and A. WREN (2001), Experiences with a flexible driver scheduler, in: S. Voß and J. R. DADUNA (eds), Computer-Aided Scheduling of Public Transport, Springer, Berlin, 137-152.
    • (2001) Computer-Aided Scheduling of Public Transport , pp. 137-152
    • Fores, S.1    Proll, L.2    Wren, A.3
  • 30
    • 27144454417 scopus 로고
    • An object-oriented approach to the train platforming problem
    • T. K. S. MURTHY et al. (eds), WIT Press, Southampton
    • GALAVERNA, M., A. IMOVILLI and G. SCIUTTO (1994), An object-oriented approach to the train platforming problem, in: T. K. S. MURTHY et al. (eds), Computers in Railway IV, vol. 1, WIT Press, Southampton, 19-25.
    • (1994) Computers in Railway IV , vol.1 , pp. 19-25
    • Galaverna, M.1    Imovilli, A.2    Sciutto, G.3
  • 31
    • 0035413715 scopus 로고    scopus 로고
    • Dispatching buses in parking depots
    • GALLO, G. and F. DI MIELE (2001), Dispatching buses in parking depots, Transportation Science 35, 322-330.
    • (2001) Transportation Science , vol.35 , pp. 322-330
    • Gallo, G.1    Miele, F.D.I.2
  • 33
    • 4544336693 scopus 로고    scopus 로고
    • A branch-and-cut approach for solving railway line-planning problems
    • GOOSSENS, J. H. M., C. P. M. VAN HOESEL and L. G. KROON (2004), A Branch-and-Cut approach for solving railway line-planning problems, Transportation Science 38, 379-393.
    • (2004) Transportation Science , vol.38 , pp. 379-393
    • Goossens, J.H.M.1    Van Hoesel, C.P.M.2    Kroon, L.G.3
  • 34
    • 0042961292 scopus 로고    scopus 로고
    • Improving punctuality and transfer reliability by railway timetable optimization
    • Delft University Press, Delft
    • GOVERDE, R. M. P. (1999), Improving punctuality and transfer reliability by railway timetable optimization, in: Proceedings TRAIL 5th Annual Congress, vol. 2. Delft University Press, Delft.
    • (1999) Proceedings TRAIL 5th Annual Congress , vol.2
    • Goverde, R.M.P.1
  • 35
    • 4544322159 scopus 로고    scopus 로고
    • TNV-prepare: Analysis of Dutch railway operations based on train detection data
    • J. ALLEN et al. (eds), WIT Press, Southampton
    • GOVERDE, R. M. P. and I. A. HANSEN (2000), TNV-prepare: Analysis of Dutch railway operations based on train detection data, in: J. ALLEN et al. (eds), Computers in Railways VII, WIT Press, Southampton, 779-788.
    • (2000) Computers in Railways VII , pp. 779-788
    • Goverde, R.M.P.1    Hansen, I.A.2
  • 39
    • 27144455436 scopus 로고    scopus 로고
    • Station capacity and stability of train operations
    • J. ALLEN et al. (eds), WIT Press, Southampton
    • HANSEN, I. A. (2000), Station capacity and stability of train operations, in: J. ALLEN et al. (eds), Computers in Railways VII, WIT Press, Southampton, 853-860.
    • (2000) Computers in Railways VII , pp. 853-860
    • Hansen, I.A.1
  • 40
    • 0032206316 scopus 로고    scopus 로고
    • Modeling train delays in urban networks
    • HIGGINS, A. and E. KOZAN (1998), Modeling train delays in urban networks, Transportation Science 32, 346-357.
    • (1998) Transportation Science , vol.32 , pp. 346-357
    • Higgins, A.1    Kozan, E.2
  • 42
    • 0035263422 scopus 로고    scopus 로고
    • Running times on railway sections with heterogeneous train traffic
    • HUISMAN, T. and R. J. BOUCHERIE (2001), Running times on railway sections with heterogeneous train traffic, Transportation Research Part B 35, 271-292.
    • (2001) Transportation Research Part B , vol.35 , pp. 271-292
    • Huisman, T.1    Boucherie, R.J.2
  • 43
    • 0036794824 scopus 로고    scopus 로고
    • A solvable queueing network model for railway networks and its validation and applications for the Netherlands
    • HUISMAN, T., R. J. BOUCHERIE and N. M. VAN DIJK (1998), A solvable queueing network model for railway networks and its validation and applications for the Netherlands, European Journal of Operational Research 142, 30-51.
    • (1998) European Journal of Operational Research , vol.142 , pp. 30-51
    • Huisman, T.1    Boucherie, R.J.2    Van Dijk, N.M.3
  • 45
    • 27144496725 scopus 로고    scopus 로고
    • Punctuality model for railways
    • J. ALLEN et al. (eds), WIT Press, Southampton
    • KAAS, A. H. (2000), Punctuality model for railways, in: J. ALLEN et al. (eds), Computers in Railways VII, WIT Press, Southampton, 809-816.
    • (2000) Computers in Railways VII , pp. 809-816
    • Kaas, A.H.1
  • 46
    • 27144466083 scopus 로고    scopus 로고
    • Solving the world's largest crew scheduling problem
    • Kohl, N. (2003), Solving the world's largest crew scheduling problem, O Rbit Xtra, 8-12.
    • (2003) O Rbit , vol.XTRA , pp. 8-12
    • Kohl, N.1
  • 47
    • 4043107907 scopus 로고    scopus 로고
    • Airline crew rostering: Problem types, modeling and optimization
    • KOHL, N. and S. E. KARISCH (2004), Airline crew rostering: problem types, modeling and optimization, Annals of Operations Research 127, 223-257.
    • (2004) Annals of Operations Research , vol.127 , pp. 223-257
    • Kohl, N.1    Karisch, S.E.2
  • 48
    • 27144517715 scopus 로고    scopus 로고
    • VirtuOS, simulieren von Bahnbetrieb
    • in German
    • KÖNIG, H. (2001), VirtuOS, simulieren von Bahnbetrieb (Simulation of railway operations). Betrieb und Verkehr 50, 44-47, in German.
    • (2001) Betrieb und Verkehr , vol.50 , pp. 44-47
    • König, H.1
  • 49
    • 0010651529 scopus 로고    scopus 로고
    • Crew scheduling for Netherlands railways 'destination: Customer'
    • S. Voß and J. R. DADUNA (eds), Springer, Berlin
    • KROON, L. G. and M. FISCHETTI (2001), Crew scheduling for Netherlands Railways 'Destination: Customer', in: S. Voß and J. R. DADUNA (eds), Computer-Aided Scheduling of Public Transport, Springer, Berlin, 181-201.
    • (2001) Computer-aided Scheduling of Public Transport , pp. 181-201
    • Kroon, L.G.1    Fischetti, M.2
  • 50
    • 0043207353 scopus 로고    scopus 로고
    • A variable trip time model for cyclic railway timetabling
    • KROON, L. G. and L. W. P. PEETERS (2003), A variable trip time model for cyclic railway timetabling, Transportation Science 37, 198-212.
    • (2003) Transportation Science , vol.37 , pp. 198-212
    • Kroon, L.G.1    Peeters, L.W.P.2
  • 54
    • 27144494648 scopus 로고    scopus 로고
    • Maintenance routing for train units: The transition model
    • Tech. rept. PNA-E0415, Center for Mathematics and Computer Science, Amsterdam, to appear in
    • MARÓTI, G. and L. G. KROON (2004a), Maintenance routing for train units: the transition model, Tech. rept. PNA-E0415, Center for Mathematics and Computer Science, Amsterdam, to appear in Transportation Science.
    • (2004) Transportation Science
    • Maróti, G.1    Kroon, L.G.2
  • 55
    • 27144494648 scopus 로고    scopus 로고
    • Maintenance routing for train units: The scenario model
    • Tech. rept. PNA-E0414, Center for Mathematics and Computer Science, Amsterdam, to appear in
    • MARÓTI, G. and L. G. KROON (2004b), Maintenance routing for train units: the scenario model, Tech. rept. PNA-E0414, Center for Mathematics and Computer Science, Amsterdam, to appear in Computers and Operations Research.
    • (2004) Computers and Operations Research
    • Maróti, G.1    Kroon, L.G.2
  • 56
    • 0345097656 scopus 로고    scopus 로고
    • Train network simulator for support of network wide planning of infrastructure and timetables
    • J. ALLEN et al. (eds), WIT Press, Southampton
    • MIDDELKOOP, D. and M. BOUWMAN (2000), Train network simulator for support of network wide planning of infrastructure and timetables, in: J. ALLEN et al. (eds), Computers in Railways VII, WIT Press, Southampton, 267-276.
    • (2000) Computers in Railways VII , pp. 267-276
    • Middelkoop, D.1    Bouwman, M.2
  • 58
    • 0030143150 scopus 로고    scopus 로고
    • A genetic algorithm approach to periodic railway synchronization
    • NACHTIGALL, K. and S. VOGET (1996), A genetic algorithm approach to periodic railway synchronization, Computers and Operations Research 23, 453-463.
    • (1996) Computers and Operations Research , vol.23 , pp. 453-463
    • Nachtigall, K.1    Voget, S.2
  • 59
    • 0030412990 scopus 로고    scopus 로고
    • A constraint generation algorithm for the construction of periodic railway timetables
    • ODIJK, M. (1996), A constraint generation algorithm for the construction of periodic railway timetables, Transportation Research 30, 455-464.
    • (1996) Transportation Research , vol.30 , pp. 455-464
    • Odijk, M.1
  • 60
    • 4644250272 scopus 로고    scopus 로고
    • Ph.D. thesis, Rotterdam School of Management, ERIM Ph.D. Series Research in Management, Rotterdam
    • PEETERS, L. W. P. (2003), Cyclic railway timetable optimization, Ph.D. thesis, Rotterdam School of Management, ERIM Ph.D. Series Research in Management, Rotterdam.
    • (2003) Cyclic Railway Timetable Optimization
    • Peeters, L.W.P.1
  • 61
    • 0041959616 scopus 로고    scopus 로고
    • A cycle based optimization model for the cyclic railway timetabling problem
    • S. Voß and J. R. DADUNA (eds), Springer, Berlin
    • PEETERS, L. W. P. and L. G. KROON (2001), A cycle based optimization model for the cyclic railway timetabling problem, in: S. Voß and J. R. DADUNA (eds), Computer aided scheduling of public transport, Springer, Berlin, 275-296.
    • (2001) Computer Aided Scheduling of Public Transport , pp. 275-296
    • Peeters, L.W.P.1    Kroon, L.G.2
  • 65
    • 0043210328 scopus 로고
    • Minimum circulation of railway stock
    • SCHRIJVER, A. (1993), Minimum circulation of railway stock, CWI Quarterly 6, 205-217.
    • (1993) CWI Quarterly , vol.6 , pp. 205-217
    • Schrijver, A.1
  • 67
    • 0008917539 scopus 로고
    • A mathematical model for periodic event scheduling problems
    • SERAFINI, P. and W. UKOVICH (1989), A mathematical model for Periodic Event Scheduling Problems, SI AM Journal of Discrete Mathematics 2, 550-581.
    • (1989) SI AM Journal of Discrete Mathematics , vol.2 , pp. 550-581
    • Serafini, P.1    Ukovich, W.2
  • 68
    • 4043092239 scopus 로고    scopus 로고
    • A flexible, fast, and optimal modeling approach applied to crew rostering at London Underground
    • SODHI, M. and S. NORRIS (2004), A flexible, fast, and optimal modeling approach applied to crew rostering at London Underground, Annals of Operations Research 127, 259-281.
    • (2004) Annals of Operations Research , vol.127 , pp. 259-281
    • Sodhi, M.1    Norris, S.2
  • 70
    • 0035466857 scopus 로고    scopus 로고
    • An optimization model for the simultaneous operational flight and pilot scheduling problem
    • STOJKOVIĆ, M. and F. SOUMIS (2001), An optimization model for the simultaneous operational flight and pilot scheduling problem, Management Science 47 1290-1305.
    • (2001) Management Science , vol.47 , pp. 1290-1305
    • Stojković, M.1    Soumis, F.2
  • 72
    • 4544289806 scopus 로고    scopus 로고
    • Depot shunting scheduling using combined genetic algorithm and PERT
    • J. ALLEN et al. (eds), WIT Press, Southampton
    • TOMII, N. and L. J. ZHOU (2000), Depot shunting scheduling using combined genetic algorithm and PERT, in: J. ALLEN et al. (eds), Computers in Railways VII, WIT Press, Southampton, 437-446.
    • (2000) Computers in Railways VII , pp. 437-446
    • Tomii, N.1    Zhou, L.J.2
  • 74
    • 27144531623 scopus 로고    scopus 로고
    • Internet (10-22-2004)
    • ULLIUS, M. (2004), Open Timetable, Internet (10-22-2004): http://www.ivt.baug.ethz.ch/oev/opentimetable_e.html.
    • (2004) Open Timetable
    • Ullius, M.1
  • 75
    • 27144537466 scopus 로고    scopus 로고
    • Stochastic optimization of railway time-tables
    • Delft University Press, Delft
    • VROMANS, M. J. C. M. and L. G. KROON (2004), Stochastic optimization of railway time-tables, in: Proceedings TRAIL 8th Annual Congress, Delft University Press, Delft, 423-445.
    • (2004) Proceedings TRAIL 8th Annual Congress , pp. 423-445
    • Vromans, M.J.C.M.1    Kroon, L.G.2
  • 76
    • 0030396273 scopus 로고    scopus 로고
    • Simulation models: Important aids for Banverket's planning process
    • B. MELLITT et al. (eds), WIT Press, Southampton
    • WAHLBORG, M. (1996), Simulation models: important aids for Banverket's planning process, in: B. MELLITT et al. (eds), Computers in Railways V, WIT Press, Southampton, 175-181.
    • (1996) Computers in Railways V , pp. 175-181
    • Wahlborg, M.1
  • 77
    • 0020717153 scopus 로고
    • The man-machine dialogue and timetable planning
    • WEIGAND, W. (1983), The man-machine dialogue and timetable planning, Rail International 3, 8-25.
    • (1983) Rail International , vol.3 , pp. 8-25
    • Weigand, W.1
  • 81
    • 27144471094 scopus 로고    scopus 로고
    • Analyses of scheduled and real capacity utilization of a major Dutch railway station
    • J. ALLAN et al. (eds), WIT Press, Southampton
    • YUAN, J. and I. A. HANSEN (2004), Analyses of scheduled and real capacity utilization of a major Dutch railway station, in: J. ALLAN et al. (eds), Computers in Railways IX, WIT Press, Southampton, 595-602.
    • (2004) Computers in Railways IX , pp. 595-602
    • Yuan, J.1    Hansen, I.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.