메뉴 건너뛰기




Volumn 219, Issue 3, 2012, Pages 727-737

Nominal and robust train timetabling problems

Author keywords

Cyclic and non cyclic timetabling; Nominal and robust problems; Train timetabling; Transportation

Indexed keywords

RAILROAD TRANSPORTATION; RAILROADS; SCHEDULING; TRANSPORTATION;

EID: 84857921061     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2011.11.003     Document Type: Article
Times cited : (315)

References (48)
  • 1
    • 0032203470 scopus 로고    scopus 로고
    • Railway timetabling using Lagrangian relaxation
    • U. Brännlund, P.O. Lindberg, A. Nöu, and J.E. Nilsson Allocation of scarce track capacity using Lagrangian relaxation Transportation Science 32 1998 358 369 (Pubitemid 128608923)
    • (1998) Transportation Science , vol.32 , Issue.4 , pp. 358-369
    • Brannlund, U.1    Lindberg, P.O.2    Nou, A.3    Nilsson, J.-E.4
  • 4
    • 84882951020 scopus 로고    scopus 로고
    • A Suitable Model for a Bi-criteria Optimization Approach to Railway Track Allocation
    • March
    • R. Borndörfer, T. Schlechte, A Suitable Model for a Bi-criteria Optimization Approach to Railway Track Allocation, ZIB-Report 08-22, March 2008.
    • (2008) ZIB-Report 08-22
    • Borndörfer, R.1    Schlechte, T.2
  • 7
    • 43949092779 scopus 로고    scopus 로고
    • A column generation approach to train timetabling on a corridor
    • V. Cacchiani, A. Caprara, and P. Toth A column generation approach to train timetabling on a corridor 4OR 6 2 2008 125 142
    • (2008) 4OR , vol.6 , Issue.2 , pp. 125-142
    • Cacchiani, V.1    Caprara, A.2    Toth, P.3
  • 9
    • 0028436769 scopus 로고
    • A fast heuristic for the train scheduling problem
    • X. Cai, and C.J. Goh A fast heuristic for the train scheduling problem Computers and Operations Research 21 1994 499 510
    • (1994) Computers and Operations Research , vol.21 , pp. 499-510
    • Cai, X.1    Goh, C.J.2
  • 10
    • 0036759198 scopus 로고    scopus 로고
    • Modeling and solving the train timetabling problem
    • A. Caprara, M. Fischetti, and P. Toth Modeling and solving the train timetabling problem Operations Research 50 2002 851 861
    • (2002) Operations Research , vol.50 , pp. 851-861
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 12
    • 33644594453 scopus 로고    scopus 로고
    • A Lagrangian heuristic approach to real-world train timetabling problems
    • A. Caprara, M. Monaci, P. Toth, and P.L. Guida A Lagrangian heuristic approach to real-world train timetabling problems Discrete Applied Mathematics 154 2006 738 753
    • (2006) Discrete Applied Mathematics , vol.154 , pp. 738-753
    • Caprara, A.1    Monaci, M.2    Toth, P.3    Guida, P.L.4
  • 17
    • 0032203702 scopus 로고    scopus 로고
    • A survey of optimization models for train routing and scheduling
    • J.-F. Cordeau, P. Toth, and D. Vigo A survey of optimization models for train routing and scheduling Transportation Science 32 1998 380 404 (Pubitemid 128608925)
    • (1998) Transportation Science , vol.32 , Issue.4 , pp. 380-404
    • Cordeau, J.-F.1    Toth, P.2    Vigo, D.3
  • 19
    • 77957089136 scopus 로고
    • Time constrained routing and scheduling
    • M.O. Ball, T.L. Magnanti, C.L. Monma, G.L. Nemhauser, Handbooks in Operations Research and Management Science Elsevier Amsterdam
    • J. Desrosiers, Y. Dumas, M.M. Solomon, and F. Soumis Time constrained routing and scheduling M.O. Ball, T.L. Magnanti, C.L. Monma, G.L. Nemhauser, Network Routing Handbooks in Operations Research and Management Science vol. 8 1995 Elsevier Amsterdam 35 139
    • (1995) Network Routing , vol.8 , pp. 35-139
    • Desrosiers, J.1    Dumas, Y.2    Solomon, M.M.3    Soumis, F.4
  • 20
    • 77956330125 scopus 로고    scopus 로고
    • Light robustness
    • R.K. Ahuja, R. Moehring, C. Zaroliagis, Lecture Notes in Computer Science Springer-Verlag Berlin, Heidelberg
    • M. Fischetti, and M. Monaci Light robustness R.K. Ahuja, R. Moehring, C. Zaroliagis, Robust and Online Large-Scale Optimization Lecture Notes in Computer Science vol. 5868 2009 Springer-Verlag Berlin, Heidelberg 61 84
    • (2009) Robust and Online Large-Scale Optimization , vol.5868 , pp. 61-84
    • Fischetti, M.1    Monaci, M.2
  • 21
    • 70449640336 scopus 로고    scopus 로고
    • Fast approaches to improve the robustness of a railway timetable
    • M. Fischetti, D. Salvagnin, and A. Zanette Fast approaches to improve the robustness of a railway timetable Transportation Science 43 2009 321 335
    • (2009) Transportation Science , vol.43 , pp. 321-335
    • Fischetti, M.1    Salvagnin, D.2    Zanette, A.3
  • 22
    • 0031234257 scopus 로고    scopus 로고
    • Heuristic Techniques for Single Line Train Scheduling
    • A. Higgings, E. Kozan, and L. Ferreira Heuristic techniques for single line train scheduling Journal of Heuristics 3 1997 43 62 (Pubitemid 127509036)
    • (1997) Journal of Heuristics , vol.3 , Issue.1 , pp. 43-62
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 24
    • 0026104713 scopus 로고
    • Tactical scheduling of rail operations: The SCAN i system
    • D. Jovanovic, and P.T. Harker Tactical scheduling of rail operations: the SCAN I system Transportation Science 25 1991 46 64
    • (1991) Transportation Science , vol.25 , pp. 46-64
    • Jovanovic, D.1    Harker, P.T.2
  • 26
    • 0043207353 scopus 로고    scopus 로고
    • A variable trip time model for cyclic railway timetabling
    • L.G. Kroon, and L.W.P. Peeters A variable trip time model for cyclic railway timetabling Transportation Science 37 2003 198 212
    • (2003) Transportation Science , vol.37 , pp. 198-212
    • Kroon, L.G.1    Peeters, L.W.P.2
  • 27
    • 77956336205 scopus 로고    scopus 로고
    • The concept of recoverable robustness, linear programming recovery, and railway applications
    • R.K. Ahuja et al. (Eds.) LNCS
    • C. Liebchen, M. Lübbecke, R. Möhring, S. Stiller, The concept of recoverable robustness, linear programming recovery, and railway applications, in: R.K. Ahuja et al. (Eds.), Robust and Online Large-Scale Optimization, LNCS, vol. 5868, 2009, pp. 1-27.
    • (2009) Robust and Online Large-scale Optimization , vol.5868 , pp. 1-27
    • Liebchen, C.1    Lübbecke, M.2    Möhring, R.3    Stiller, S.4
  • 28
    • 49949090088 scopus 로고    scopus 로고
    • The modeling power of the periodic event scheduling problem: Railway timetables-and beyond
    • F. Geraets, Lecture Notes in Computer Science Springer
    • C. Liebchen, and R. Möhring The modeling power of the periodic event scheduling problem: Railway timetables-and beyond F. Geraets, Algorithmic Methods for Railway Optimization Lecture Notes in Computer Science vol. 4359 2007 Springer
    • (2007) Algorithmic Methods for Railway Optimization , vol.4359
    • Liebchen, C.1    Möhring, R.2
  • 29
    • 53749095847 scopus 로고    scopus 로고
    • Performance of algorithms for periodic timetable optimization
    • M. Hickman, P. M irchandani, S. Voss, LNEMS Springer
    • C. Liebchen, M. Proksch, and F.H. Wagner Performance of algorithms for periodic timetable optimization M. Hickman, P. M irchandani, S. Voss, Computer-Aided Systems in Public Transport (CASPT 2004) LNEMS vol. 600 2007 Springer
    • (2007) Computer-Aided Systems in Public Transport (CASPT 2004) , vol.600
    • Liebchen, C.1    Proksch, M.2    Wagner, F.H.3
  • 33
    • 79960086387 scopus 로고    scopus 로고
    • Railway track allocation: Models and methods
    • 10.1007/s00291-009-0189-0
    • R.M. Lusby, J. Larsenz, M. Ehrgott, and D. Ryan Railway track allocation: Models and methods OR Spectrum 2010 10.1007/s00291-009-0189-0
    • (2010) OR Spectrum
    • Lusby, R.M.1    Larsenz, J.2    Ehrgott, M.3    Ryan, D.4
  • 34
    • 35248878898 scopus 로고    scopus 로고
    • Generation and optimization of train timetables using coevolution
    • Springer
    • P. Mistry, and R.S.K. Kwan Generation and optimization of train timetables using coevolution Lecture Notes in Computer Science vol. 2723 2003 Springer
    • (2003) Lecture Notes in Computer Science , vol.2723
    • Mistry, P.1    Kwan, R.S.K.2
  • 37
    • 0030143150 scopus 로고    scopus 로고
    • A genetic algorithm approach to periodic railway synchronization
    • K. Nachtigall, and S. Voget A genetic algorithm approach to periodic railway synchronization Computers and Operations Research 23 1996 453 463
    • (1996) Computers and Operations Research , vol.23 , pp. 453-463
    • Nachtigall, K.1    Voget, S.2
  • 38
    • 0030412990 scopus 로고    scopus 로고
    • A constraint generation algorithm for the construction of periodic railway timetables
    • DOI 10.1016/0191-2615(96)00005-7, PII S0191261596000057
    • M. Odijk A constraint generation algorithm for the construction of periodic railway timetables Transportation Research Part B 30 1996 455 464 (Pubitemid 126395727)
    • (1996) Transportation Research Part B: Methodological , vol.30 , Issue.6 , pp. 455-464
    • Odijk, M.A.1
  • 40
    • 4644250272 scopus 로고    scopus 로고
    • Ph.D Thesis, Erasmus Research Institute of Management, Erasmus University, Rotterdam
    • L.W.P. Peeters, Cyclic Railway Timetable Optimization, Ph.D Thesis, Erasmus Research Institute of Management, Erasmus University, Rotterdam, 2003.
    • (2003) Cyclic Railway Timetable Optimization
    • Peeters, L.W.P.1
  • 41
    • 0041959616 scopus 로고    scopus 로고
    • A cycle based optimization model for the cyclic railway timetabling problem
    • J. Daduna, S. Voss, Lecture Notes in Economics and Mathematical Systems Springer-Verlag Berlin
    • L.W.P. Peeters, and L.G. Kroon A cycle based optimization model for the cyclic railway timetabling problem J. Daduna, S. Voss, Computer-Aided Transit Scheduling Lecture Notes in Economics and Mathematical Systems vol. 505 2001 Springer-Verlag Berlin 275 296
    • (2001) Computer-Aided Transit Scheduling , vol.505 , pp. 275-296
    • Peeters, L.W.P.1    Kroon, L.G.2
  • 42
    • 77956299895 scopus 로고    scopus 로고
    • Approach for robust timetabling
    • R.K. Ahuja et al.; (Eds.) LNCS
    • A. Schöbel, A. Kratz, A Bicriteria, Approach for robust timetabling, in: R.K. Ahuja et al.; (Eds.), Robust and Online Large-Scale Optimization, LNCS, vol. 5868, 2009, pp. 119-144.
    • (2009) Robust and Online Large-Scale Optimization , vol.5868 , pp. 119-144
    • Schöbel, A.1
  • 44
    • 27144555692 scopus 로고    scopus 로고
    • An efficient memetic, permutation-based evolutionary algorithm for real-world train timetabling
    • 2005 IEEE Congress on Evolutionary Computation, IEEE CEC 2005. Proceedings
    • Y. Semet, and M. Schoenauer An efficient memetic, permutation-based evolutionary algorithm for real-world train timetabling Evolutionary Computation 3 2005 2752 2759 (Pubitemid 41496191)
    • (2005) 2005 IEEE Congress on Evolutionary Computation, IEEE CEC 2005. Proceedings , vol.3 , pp. 2752-2759
    • Semet, Y.1    Schoenauer, M.2
  • 45
    • 0008917539 scopus 로고
    • A mathematical model for periodic event scheduling problems
    • P. Serafini, and W. Ukovich A mathematical model for periodic event scheduling problems SIAM Journal on Discrete Mathematics 2 1989 550 581
    • (1989) SIAM Journal on Discrete Mathematics , vol.2 , pp. 550-581
    • Serafini, P.1    Ukovich, W.2
  • 46
    • 0011877979 scopus 로고
    • Optimal train scheduling on a single track railway
    • M. Ross, North-Holland Amsterdam
    • B. Szpigel Optimal train scheduling on a single track railway M. Ross, OR'72 1973 North-Holland Amsterdam 343 351
    • (1973) OR'72 , pp. 343-351
    • Szpigel, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.