메뉴 건너뛰기




Volumn 45, Issue 7, 2011, Pages 1080-1102

Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario-based rolling horizon solution approach

Author keywords

Disruption handling; Rolling horizon decision making; Stochastic optimization; Train dispatching

Indexed keywords

DECISION MAKING; OPTIMIZATION; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS;

EID: 79959808568     PISSN: 01912615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trb.2011.05.001     Document Type: Article
Times cited : (195)

References (62)
  • 2
    • 21144438339 scopus 로고    scopus 로고
    • A finite branch-and-bound algorithm for two-stage stochastic integer programs
    • Ahmed S., Tawarmalani M., Sahinidis N.V. A finite branch-and-bound algorithm for two-stage stochastic integer programs. Mathematical Programming 2004, 100(2):355-377.
    • (2004) Mathematical Programming , vol.100 , Issue.2 , pp. 355-377
    • Ahmed, S.1    Tawarmalani, M.2    Sahinidis, N.V.3
  • 3
    • 0039044487 scopus 로고
    • Sensors and information in optimization under stochastic uncertainty
    • Artstein Z., Wets R.J.-B. Sensors and information in optimization under stochastic uncertainty. Mathematics of Operations Research 1993, 18(3):523-547.
    • (1993) Mathematics of Operations Research , vol.18 , Issue.3 , pp. 523-547
    • Artstein, Z.1    Wets, R.J.-B.2
  • 4
    • 0036592120 scopus 로고    scopus 로고
    • A branch and bound method for stochastic integer problems under probabilistic constraints
    • Beraldi P., Ruszczyński A. A branch and bound method for stochastic integer problems under probabilistic constraints. Optimization Methods and Software 2002, 17(3):359-382.
    • (2002) Optimization Methods and Software , vol.17 , Issue.3 , pp. 359-382
    • Beraldi, P.1    Ruszczyński, A.2
  • 7
    • 0032654777 scopus 로고    scopus 로고
    • Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
    • Cai X., Zhou X. Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost. Operations Research 1999, 47(3):422-437.
    • (1999) Operations Research , vol.47 , Issue.3 , pp. 422-437
    • Cai, X.1    Zhou, X.2
  • 8
    • 0034558594 scopus 로고    scopus 로고
    • Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
    • Cai X., Zhou X. Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine. Annals of Operations Research 2000, 98(4):313-331.
    • (2000) Annals of Operations Research , vol.98 , Issue.4 , pp. 313-331
    • Cai, X.1    Zhou, X.2
  • 9
    • 1642492010 scopus 로고    scopus 로고
    • Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime
    • Cai X., Sun X., Zhou X. Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime. Probability in the Engineering and Informational Sciences 2003, 17(4):467-485.
    • (2003) Probability in the Engineering and Informational Sciences , vol.17 , Issue.4 , pp. 467-485
    • Cai, X.1    Sun, X.2    Zhou, X.3
  • 10
    • 0028530808 scopus 로고
    • A model and strategy for train pathing with choice of lines, platforms, and routes
    • Carey M. A model and strategy for train pathing with choice of lines, platforms, and routes. Transportation Research Part B 1994, 28(5):333-353.
    • (1994) Transportation Research Part B , vol.28 , Issue.5 , pp. 333-353
    • Carey, M.1
  • 11
    • 0028532251 scopus 로고
    • Extending a train pathing model from one-way to two-way track
    • Carey M. Extending a train pathing model from one-way to two-way track. Transportation Research Part B 1994, 28(5):395-400.
    • (1994) Transportation Research Part B , vol.28 , Issue.5 , pp. 395-400
    • Carey, M.1
  • 12
    • 0031594060 scopus 로고    scopus 로고
    • Optimizing scheduled times, allowing for behavioural response
    • Carey M. Optimizing scheduled times, allowing for behavioural response. Transportation Research Part B 1998, 32(5):329-342.
    • (1998) Transportation Research Part B , vol.32 , Issue.5 , pp. 329-342
    • Carey, M.1
  • 13
    • 0028481461 scopus 로고
    • Stochastic approximation to the effects of headways on knock-on delays of trains
    • Carey M., Kwicinski A. Stochastic approximation to the effects of headways on knock-on delays of trains. Transportation Research Part B 1994, 28(4):251-267.
    • (1994) Transportation Research Part B , vol.28 , Issue.4 , pp. 251-267
    • Carey, M.1    Kwicinski, A.2
  • 15
  • 16
    • 0025512036 scopus 로고
    • Two moments estimation of the delay on single-track rail lines with scheduled traffic
    • Chen B., Harker P.T. Two moments estimation of the delay on single-track rail lines with scheduled traffic. Transportation Science 1990, 24(4):261-275.
    • (1990) Transportation Science , vol.24 , Issue.4 , pp. 261-275
    • Chen, B.1    Harker, P.T.2
  • 17
    • 62749142613 scopus 로고    scopus 로고
    • A train stop deployment planning algorithm using a petri-net-based modeling approach
    • Chikara H., Taketoshi K., Norio T., Shigeki K., Motoshi T. A train stop deployment planning algorithm using a petri-net-based modeling approach. Quarterly Report of RTRI 2009, 50(1):8-13.
    • (2009) Quarterly Report of RTRI , vol.50 , Issue.1 , pp. 8-13
    • Chikara, H.1    Taketoshi, K.2    Norio, T.3    Shigeki, K.4    Motoshi, T.5
  • 18
    • 33947207335 scopus 로고    scopus 로고
    • Location configuration design for dynamic message signs under stochastic incident scenarios
    • Chiu Y.C., Huynh N. Location configuration design for dynamic message signs under stochastic incident scenarios. Transportation Research Part C 2007, 15(1):333-350.
    • (2007) Transportation Research Part C , vol.15 , Issue.1 , pp. 333-350
    • Chiu, Y.C.1    Huynh, N.2
  • 19
    • 85029839312 scopus 로고    scopus 로고
    • Determining optimal locations for variable message signs under stochastic incident scenarios. Presented at the 80th Annual Meeting of the Transportation Research Board, Washington, D.C.
    • Chiu, Y.-C., Huynh, N., Mahmassani, H.S., 2001. Determining optimal locations for variable message signs under stochastic incident scenarios. Presented at the 80th Annual Meeting of the Transportation Research Board, Washington, D.C.
    • (2001)
    • Chiu, Y.-C.1    Huynh, N.2    Mahmassani, H.S.3
  • 24
    • 80054790040 scopus 로고    scopus 로고
    • in press. Bi-objective conflict detection and resolution in railway traffic management. Transportation Research Part C., doi:10.1016/j.trc.2010.09.009
    • Corman, F., D'Ariano, A., Pacciarelli, D., Pranzo, M., in press. Bi-objective conflict detection and resolution in railway traffic management. Transportation Research Part C. doi:10.1016/j.trc.2010.09.009.
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 25
    • 85029885289 scopus 로고    scopus 로고
    • Improving Real-time Train Dispatching: Models, Algorithms and Applications. PhD thesis. Delft University of Technology, the Netherlands.
    • D'Ariano, A., 2008. Improving Real-time Train Dispatching: Models, Algorithms and Applications. PhD thesis. Delft University of Technology, the Netherlands.
    • (2008)
    • D'Ariano, A.1
  • 26
    • 59749089450 scopus 로고    scopus 로고
    • An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
    • D'Ariano A., Pranzo M. An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances. Networks and Spatial Economics 2009, 9(1):63-84.
    • (2009) Networks and Spatial Economics , vol.9 , Issue.1 , pp. 63-84
    • D'Ariano, A.1    Pranzo, M.2
  • 28
    • 70449635732 scopus 로고    scopus 로고
    • Reordering and local rerouting strategies to manage train traffic in real-time
    • D'Ariano A., Corman F., Pacciarelli D., Pranzo M. Reordering and local rerouting strategies to manage train traffic in real-time. Transportation Science 2008, 42(4):405-419.
    • (2008) Transportation Science , vol.42 , Issue.4 , pp. 405-419
    • D'Ariano, A.1    Corman, F.2    Pacciarelli, D.3    Pranzo, M.4
  • 29
    • 0142156064 scopus 로고    scopus 로고
    • Scheduling trains on a railway network using a discrete event model of railway traffic
    • Dorfman M.J., Medanic J. Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B 2004, 38(1):81-98.
    • (2004) Transportation Research Part B , vol.38 , Issue.1 , pp. 81-98
    • Dorfman, M.J.1    Medanic, J.2
  • 30
    • 79959802541 scopus 로고    scopus 로고
    • European Commission. Directive 2001/14/EC of the European Parliament and of the Council. Official Journal L075 (15.03.2001), 0029-0046.
    • European Commission, 2001. Directive 2001/14/EC of the European Parliament and of the Council. Official Journal L075 (15.03.2001), 0029-0046.
    • (2001)
  • 32
    • 0024855829 scopus 로고
    • Incident characteristics, frequency, and duration on a high volume urban freeway
    • Giuliano G. Incident characteristics, frequency, and duration on a high volume urban freeway. Transportation Research Part A 1989, 23(5):387-396.
    • (1989) Transportation Research Part A , vol.23 , Issue.5 , pp. 387-396
    • Giuliano, G.1
  • 33
    • 0023434259 scopus 로고
    • An analysis of the severity and incident duration of truck-involved freeway accidents
    • Golob T.F., Recker W.W., Leonard J.D. An analysis of the severity and incident duration of truck-involved freeway accidents. Accident Analysis and Prevention 1987, 19(4):375-395.
    • (1987) Accident Analysis and Prevention , vol.19 , Issue.4 , pp. 375-395
    • Golob, T.F.1    Recker, W.W.2    Leonard, J.D.3
  • 34
    • 77952289414 scopus 로고    scopus 로고
    • A delay propagation algorithm for large-scale railway traffic networks
    • Goverde R.M.P. A delay propagation algorithm for large-scale railway traffic networks. Transportation Research Part C 2010, 18(3):269-287.
    • (2010) Transportation Research Part C , vol.18 , Issue.3 , pp. 269-287
    • Goverde, R.M.P.1
  • 35
    • 85029833242 scopus 로고
    • Optimal Dispatching under Uncertainty: With Application to Railroad Scheduling. PhD thesis. University of Pennsylvania, USA.
    • Hallowell, S.F., 1993. Optimal Dispatching under Uncertainty: With Application to Railroad Scheduling. PhD thesis. University of Pennsylvania, USA.
    • (1993)
    • Hallowell, S.F.1
  • 36
    • 79951897217 scopus 로고    scopus 로고
    • Modeling network transition constraints with hypergraphs
    • Harrod S. Modeling network transition constraints with hypergraphs. Transportation Science 2011, 45(1):81-97.
    • (2011) Transportation Science , vol.45 , Issue.1 , pp. 81-97
    • Harrod, S.1
  • 37
    • 0026209335 scopus 로고
    • Analysis of the frequency and duration of freeway accidents in Seattle
    • Jones B., Janssen L., Mannering F. Analysis of the frequency and duration of freeway accidents in Seattle. Accident Analysis and Prevention 1991, 23(4):239-255.
    • (1991) Accident Analysis and Prevention , vol.23 , Issue.4 , pp. 239-255
    • Jones, B.1    Janssen, L.2    Mannering, F.3
  • 38
    • 85029828793 scopus 로고
    • Improving Railroad In-time Performance: Models, Algorithms and Applications. PhD thesis. University of Pennsylvania, USA.
    • Jovanovic, D., 1989. Improving Railroad In-time Performance: Models, Algorithms and Applications. PhD thesis. University of Pennsylvania, USA.
    • (1989)
    • Jovanovic, D.1
  • 39
    • 0345428567 scopus 로고
    • A decision support system for train dispatching: an optimization-based methodology
    • Jovanovic D., Harker P.T. A decision support system for train dispatching: an optimization-based methodology. Journal of the Transportation Research Forum 1990, 31(1):25-37.
    • (1990) Journal of the Transportation Research Forum , vol.31 , Issue.1 , pp. 25-37
    • Jovanovic, D.1    Harker, P.T.2
  • 40
    • 0026104713 scopus 로고
    • Tactical scheduling of rail operations: the SCAN I system
    • Jovanovic D., Harker P.T. Tactical scheduling of rail operations: the SCAN I system. Transportation Science 1991, 25(1):46-64.
    • (1991) Transportation Science , vol.25 , Issue.1 , pp. 46-64
    • Jovanovic, D.1    Harker, P.T.2
  • 41
    • 77649271726 scopus 로고    scopus 로고
    • Slack time allocation in robust double-track train timetabling applications
    • Khan M.B., Zhou X. Slack time allocation in robust double-track train timetabling applications. IEEE Transactions on Intelligent Transportation Systems 2010, 11(1):81-89.
    • (2010) IEEE Transactions on Intelligent Transportation Systems , vol.11 , Issue.1 , pp. 81-89
    • Khan, M.B.1    Zhou, X.2
  • 43
    • 0034429299 scopus 로고    scopus 로고
    • Simulation within the railroad environment. In: Proceedings of the 2000 Winter Simulation Conference
    • Krueger, H., Vaillancourt, E., Drummie, A.M., Vucko, S.J., Bekavac, J., 2000. Simulation within the railroad environment. In: Proceedings of the 2000 Winter Simulation Conference, pp. 1191-1200.
    • (2000) , pp. 1191-1200
    • Krueger, H.1    Vaillancourt, E.2    Drummie, A.M.3    Vucko, S.J.4    Bekavac, J.5
  • 45
    • 0001002199 scopus 로고
    • Stochastic single machine scheduling with quadratic early-tardy penalties
    • Mittenthal J., Raghavachari M. Stochastic single machine scheduling with quadratic early-tardy penalties. Operations Research 1993, 41(4):786-796.
    • (1993) Operations Research , vol.41 , Issue.4 , pp. 786-796
    • Mittenthal, J.1    Raghavachari, M.2
  • 46
    • 0033622790 scopus 로고    scopus 로고
    • An exploratory hazard-based analysis of highway incident duration
    • Nam D., Mannering F. An exploratory hazard-based analysis of highway incident duration. Transportation Research Part A 2000, 34(2):85-102.
    • (2000) Transportation Research Part A , vol.34 , Issue.2 , pp. 85-102
    • Nam, D.1    Mannering, F.2
  • 47
    • 85029866366 scopus 로고    scopus 로고
    • Solving Single-track Railway Scheduling Problem using Constraint Programming. PhD thesis. The University of Leeds, UK.
    • Oliveira, E., 2001. Solving Single-track Railway Scheduling Problem using Constraint Programming. PhD thesis. The University of Leeds, UK.
    • (2001)
    • Oliveira, E.1
  • 50
    • 0002302632 scopus 로고
    • Multiple user classes real-time traffic assignment for online operations: a rolling horizon solution framework
    • Peeta S., Mahmassani H.S. Multiple user classes real-time traffic assignment for online operations: a rolling horizon solution framework. Transportation Research Part C 1995, 3(2):83-98.
    • (1995) Transportation Research Part C , vol.3 , Issue.2 , pp. 83-98
    • Peeta, S.1    Mahmassani, H.S.2
  • 52
    • 85029837033 scopus 로고    scopus 로고
    • Railroad Safety Statistics 2007 Preliminary Annual Report. US Department of Transportation Federal Railroad Administration, November 13. .
    • Railroad Safety Statistics 2007 Preliminary Annual Report. US Department of Transportation Federal Railroad Administration, November 13, 2008. http://www.safetydata.fra.dot.gov/Prelim/2007/r01.htm.
    • (2008)
  • 54
    • 77955639714 scopus 로고    scopus 로고
    • To wait or not to wait-and who goes first? Delay management with priority decisions
    • Schachtebeck M., Schöbel A. To wait or not to wait-and who goes first? Delay management with priority decisions. Transportation Science 2010, 44(3):307-321.
    • (2010) Transportation Science , vol.44 , Issue.3 , pp. 307-321
    • Schachtebeck, M.1    Schöbel, A.2
  • 56
    • 0001519535 scopus 로고    scopus 로고
    • New model for predicting incidents and incident delay
    • Sullivan E.C. New model for predicting incidents and incident delay. ASCE Journal of Transportation Engineering 1997, 123(4):267-275.
    • (1997) ASCE Journal of Transportation Engineering , vol.123 , Issue.4 , pp. 267-275
    • Sullivan, E.C.1
  • 57
    • 0011877979 scopus 로고
    • Optimal train scheduling on a single track railway. Operational research' 72. In: The 6th IFORS International Conference, Dublin, Ireland
    • Szpigel, B., 1973. Optimal train scheduling on a single track railway. Operational research' 72. In: The 6th IFORS International Conference, Dublin, Ireland, pp. 343-352.
    • (1973) , pp. 343-352
    • Szpigel, B.1
  • 58
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • Tornquist J., Persson J. N-tracked railway traffic re-scheduling during disturbances. Transportation Research Part B 2007, 41(3):342-362.
    • (2007) Transportation Research Part B , vol.41 , Issue.3 , pp. 342-362
    • Tornquist, J.1    Persson, J.2
  • 60
    • 34250655003 scopus 로고    scopus 로고
    • A structural state space model for real-time origin-destination demand estimation and prediction in a day-to-day updating framework
    • Zhou X., Mahmassani H.S. A structural state space model for real-time origin-destination demand estimation and prediction in a day-to-day updating framework. Transportation Research Part B 2007, 41(8):823-840.
    • (2007) Transportation Research Part B , vol.41 , Issue.8 , pp. 823-840
    • Zhou, X.1    Mahmassani, H.S.2
  • 61
    • 13544267417 scopus 로고    scopus 로고
    • Bi-criteria train scheduling for high-speed passenger railroad planning applications
    • Zhou X., Zhong M. Bi-criteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research 2005, 167(3):752-771.
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 752-771
    • Zhou, X.1    Zhong, M.2
  • 62
    • 33845274298 scopus 로고    scopus 로고
    • Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds
    • Zhou X., Zhong M. Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds. Transportation Research Part B 2007, 41(3):320-341.
    • (2007) Transportation Research Part B , vol.41 , Issue.3 , pp. 320-341
    • Zhou, X.1    Zhong, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.