-
2
-
-
21144438339
-
A finite branch-and-bound algorithm for two-stage stochastic integer programs
-
Ahmed S., Tawarmalani M., Sahinidis N.V. A finite branch-and-bound algorithm for two-stage stochastic integer programs. Mathematical Programming 2004, 100(2):355-377.
-
(2004)
Mathematical Programming
, vol.100
, Issue.2
, pp. 355-377
-
-
Ahmed, S.1
Tawarmalani, M.2
Sahinidis, N.V.3
-
3
-
-
0039044487
-
Sensors and information in optimization under stochastic uncertainty
-
Artstein Z., Wets R.J.-B. Sensors and information in optimization under stochastic uncertainty. Mathematics of Operations Research 1993, 18(3):523-547.
-
(1993)
Mathematics of Operations Research
, vol.18
, Issue.3
, pp. 523-547
-
-
Artstein, Z.1
Wets, R.J.-B.2
-
4
-
-
0036592120
-
A branch and bound method for stochastic integer problems under probabilistic constraints
-
Beraldi P., Ruszczyński A. A branch and bound method for stochastic integer problems under probabilistic constraints. Optimization Methods and Software 2002, 17(3):359-382.
-
(2002)
Optimization Methods and Software
, vol.17
, Issue.3
, pp. 359-382
-
-
Beraldi, P.1
Ruszczyński, A.2
-
6
-
-
0032203470
-
Railway timetabling using Lagrangian relaxation
-
Brannlund U., Lindberg P.O., Nou A., Nilsson J.E. Railway timetabling using Lagrangian relaxation. Transportation Science 1998, 32(4):358-369.
-
(1998)
Transportation Science
, vol.32
, Issue.4
, pp. 358-369
-
-
Brannlund, U.1
Lindberg, P.O.2
Nou, A.3
Nilsson, J.E.4
-
7
-
-
0032654777
-
Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
-
Cai X., Zhou X. Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost. Operations Research 1999, 47(3):422-437.
-
(1999)
Operations Research
, vol.47
, Issue.3
, pp. 422-437
-
-
Cai, X.1
Zhou, X.2
-
8
-
-
0034558594
-
Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
-
Cai X., Zhou X. Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine. Annals of Operations Research 2000, 98(4):313-331.
-
(2000)
Annals of Operations Research
, vol.98
, Issue.4
, pp. 313-331
-
-
Cai, X.1
Zhou, X.2
-
9
-
-
1642492010
-
Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime
-
Cai X., Sun X., Zhou X. Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime. Probability in the Engineering and Informational Sciences 2003, 17(4):467-485.
-
(2003)
Probability in the Engineering and Informational Sciences
, vol.17
, Issue.4
, pp. 467-485
-
-
Cai, X.1
Sun, X.2
Zhou, X.3
-
10
-
-
0028530808
-
A model and strategy for train pathing with choice of lines, platforms, and routes
-
Carey M. A model and strategy for train pathing with choice of lines, platforms, and routes. Transportation Research Part B 1994, 28(5):333-353.
-
(1994)
Transportation Research Part B
, vol.28
, Issue.5
, pp. 333-353
-
-
Carey, M.1
-
11
-
-
0028532251
-
Extending a train pathing model from one-way to two-way track
-
Carey M. Extending a train pathing model from one-way to two-way track. Transportation Research Part B 1994, 28(5):395-400.
-
(1994)
Transportation Research Part B
, vol.28
, Issue.5
, pp. 395-400
-
-
Carey, M.1
-
12
-
-
0031594060
-
Optimizing scheduled times, allowing for behavioural response
-
Carey M. Optimizing scheduled times, allowing for behavioural response. Transportation Research Part B 1998, 32(5):329-342.
-
(1998)
Transportation Research Part B
, vol.32
, Issue.5
, pp. 329-342
-
-
Carey, M.1
-
13
-
-
0028481461
-
Stochastic approximation to the effects of headways on knock-on delays of trains
-
Carey M., Kwicinski A. Stochastic approximation to the effects of headways on knock-on delays of trains. Transportation Research Part B 1994, 28(4):251-267.
-
(1994)
Transportation Research Part B
, vol.28
, Issue.4
, pp. 251-267
-
-
Carey, M.1
Kwicinski, A.2
-
15
-
-
77956184648
-
Timetabling optimization of a mixed double-and single-tracked railway network
-
Castillo E., Gallego I., Ureña J.M., Coronado J.M. Timetabling optimization of a mixed double-and single-tracked railway network. Applied Mathematical Modelling 2011, 35(2):859-878.
-
(2011)
Applied Mathematical Modelling
, vol.35
, Issue.2
, pp. 859-878
-
-
Castillo, E.1
Gallego, I.2
Ureña, J.M.3
Coronado, J.M.4
-
16
-
-
0025512036
-
Two moments estimation of the delay on single-track rail lines with scheduled traffic
-
Chen B., Harker P.T. Two moments estimation of the delay on single-track rail lines with scheduled traffic. Transportation Science 1990, 24(4):261-275.
-
(1990)
Transportation Science
, vol.24
, Issue.4
, pp. 261-275
-
-
Chen, B.1
Harker, P.T.2
-
17
-
-
62749142613
-
A train stop deployment planning algorithm using a petri-net-based modeling approach
-
Chikara H., Taketoshi K., Norio T., Shigeki K., Motoshi T. A train stop deployment planning algorithm using a petri-net-based modeling approach. Quarterly Report of RTRI 2009, 50(1):8-13.
-
(2009)
Quarterly Report of RTRI
, vol.50
, Issue.1
, pp. 8-13
-
-
Chikara, H.1
Taketoshi, K.2
Norio, T.3
Shigeki, K.4
Motoshi, T.5
-
18
-
-
33947207335
-
Location configuration design for dynamic message signs under stochastic incident scenarios
-
Chiu Y.C., Huynh N. Location configuration design for dynamic message signs under stochastic incident scenarios. Transportation Research Part C 2007, 15(1):333-350.
-
(2007)
Transportation Research Part C
, vol.15
, Issue.1
, pp. 333-350
-
-
Chiu, Y.C.1
Huynh, N.2
-
19
-
-
85029839312
-
-
Determining optimal locations for variable message signs under stochastic incident scenarios. Presented at the 80th Annual Meeting of the Transportation Research Board, Washington, D.C.
-
Chiu, Y.-C., Huynh, N., Mahmassani, H.S., 2001. Determining optimal locations for variable message signs under stochastic incident scenarios. Presented at the 80th Annual Meeting of the Transportation Research Board, Washington, D.C.
-
(2001)
-
-
Chiu, Y.-C.1
Huynh, N.2
Mahmassani, H.S.3
-
20
-
-
69249202566
-
Evaluation of green wave policy in real-time railway traffic management
-
Corman F., D'Ariano A., Pacciarelli D., Pranzo M. Evaluation of green wave policy in real-time railway traffic management. Transportation Research Part C 2009, 17(6):607-616.
-
(2009)
Transportation Research Part C
, vol.17
, Issue.6
, pp. 607-616
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
21
-
-
71549158818
-
A tabu search algorithm for rerouting trains during rail operations
-
Corman F., D'Ariano A., Pacciarelli D., Pranzo M. A tabu search algorithm for rerouting trains during rail operations. Transportation Research Part B 2010, 44(1):175-192.
-
(2010)
Transportation Research Part B
, vol.44
, Issue.1
, pp. 175-192
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
22
-
-
78649410947
-
Disruption handling in large railway networks
-
DOI: 10.2495/CR100581
-
Corman, F., D'Ariano, A., Hansen, I.A., 2010. Disruption handling in large railway networks.WIT Transactions on the Built Environment,114,pp. 629-640. DOI: 10.2495/CR100581
-
(2010)
WIT Transactions on the Built Environment
, vol.114
, pp. 629-640
-
-
Corman, F.1
D'Ariano, A.2
Hansen, I.A.3
-
23
-
-
84856830451
-
Optimal multi-class rescheduling of railway traffic
-
Università degli Studi di Roma La Sapienza, Italy
-
Corman F., D'Ariano A., Hansen I.A., Pacciarelli D. Optimal multi-class rescheduling of railway traffic. Proceedings of the 4th International Seminar on Railway Operations Modelling and Analysis (RailRome 2011) 2011, 1-20. Università degli Studi di Roma La Sapienza, Italy.
-
(2011)
Proceedings of the 4th International Seminar on Railway Operations Modelling and Analysis (RailRome 2011)
, pp. 1-20
-
-
Corman, F.1
D'Ariano, A.2
Hansen, I.A.3
Pacciarelli, D.4
-
24
-
-
80054790040
-
-
in press. Bi-objective conflict detection and resolution in railway traffic management. Transportation Research Part C., doi:10.1016/j.trc.2010.09.009
-
Corman, F., D'Ariano, A., Pacciarelli, D., Pranzo, M., in press. Bi-objective conflict detection and resolution in railway traffic management. Transportation Research Part C. doi:10.1016/j.trc.2010.09.009.
-
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
25
-
-
85029885289
-
-
Improving Real-time Train Dispatching: Models, Algorithms and Applications. PhD thesis. Delft University of Technology, the Netherlands.
-
D'Ariano, A., 2008. Improving Real-time Train Dispatching: Models, Algorithms and Applications. PhD thesis. Delft University of Technology, the Netherlands.
-
(2008)
-
-
D'Ariano, A.1
-
26
-
-
59749089450
-
An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
-
D'Ariano A., Pranzo M. An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances. Networks and Spatial Economics 2009, 9(1):63-84.
-
(2009)
Networks and Spatial Economics
, vol.9
, Issue.1
, pp. 63-84
-
-
D'Ariano, A.1
Pranzo, M.2
-
28
-
-
70449635732
-
Reordering and local rerouting strategies to manage train traffic in real-time
-
D'Ariano A., Corman F., Pacciarelli D., Pranzo M. Reordering and local rerouting strategies to manage train traffic in real-time. Transportation Science 2008, 42(4):405-419.
-
(2008)
Transportation Science
, vol.42
, Issue.4
, pp. 405-419
-
-
D'Ariano, A.1
Corman, F.2
Pacciarelli, D.3
Pranzo, M.4
-
29
-
-
0142156064
-
Scheduling trains on a railway network using a discrete event model of railway traffic
-
Dorfman M.J., Medanic J. Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B 2004, 38(1):81-98.
-
(2004)
Transportation Research Part B
, vol.38
, Issue.1
, pp. 81-98
-
-
Dorfman, M.J.1
Medanic, J.2
-
30
-
-
79959802541
-
-
European Commission. Directive 2001/14/EC of the European Parliament and of the Council. Official Journal L075 (15.03.2001), 0029-0046.
-
European Commission, 2001. Directive 2001/14/EC of the European Parliament and of the Council. Official Journal L075 (15.03.2001), 0029-0046.
-
(2001)
-
-
-
32
-
-
0024855829
-
Incident characteristics, frequency, and duration on a high volume urban freeway
-
Giuliano G. Incident characteristics, frequency, and duration on a high volume urban freeway. Transportation Research Part A 1989, 23(5):387-396.
-
(1989)
Transportation Research Part A
, vol.23
, Issue.5
, pp. 387-396
-
-
Giuliano, G.1
-
33
-
-
0023434259
-
An analysis of the severity and incident duration of truck-involved freeway accidents
-
Golob T.F., Recker W.W., Leonard J.D. An analysis of the severity and incident duration of truck-involved freeway accidents. Accident Analysis and Prevention 1987, 19(4):375-395.
-
(1987)
Accident Analysis and Prevention
, vol.19
, Issue.4
, pp. 375-395
-
-
Golob, T.F.1
Recker, W.W.2
Leonard, J.D.3
-
34
-
-
77952289414
-
A delay propagation algorithm for large-scale railway traffic networks
-
Goverde R.M.P. A delay propagation algorithm for large-scale railway traffic networks. Transportation Research Part C 2010, 18(3):269-287.
-
(2010)
Transportation Research Part C
, vol.18
, Issue.3
, pp. 269-287
-
-
Goverde, R.M.P.1
-
35
-
-
85029833242
-
-
Optimal Dispatching under Uncertainty: With Application to Railroad Scheduling. PhD thesis. University of Pennsylvania, USA.
-
Hallowell, S.F., 1993. Optimal Dispatching under Uncertainty: With Application to Railroad Scheduling. PhD thesis. University of Pennsylvania, USA.
-
(1993)
-
-
Hallowell, S.F.1
-
36
-
-
79951897217
-
Modeling network transition constraints with hypergraphs
-
Harrod S. Modeling network transition constraints with hypergraphs. Transportation Science 2011, 45(1):81-97.
-
(2011)
Transportation Science
, vol.45
, Issue.1
, pp. 81-97
-
-
Harrod, S.1
-
37
-
-
0026209335
-
Analysis of the frequency and duration of freeway accidents in Seattle
-
Jones B., Janssen L., Mannering F. Analysis of the frequency and duration of freeway accidents in Seattle. Accident Analysis and Prevention 1991, 23(4):239-255.
-
(1991)
Accident Analysis and Prevention
, vol.23
, Issue.4
, pp. 239-255
-
-
Jones, B.1
Janssen, L.2
Mannering, F.3
-
38
-
-
85029828793
-
-
Improving Railroad In-time Performance: Models, Algorithms and Applications. PhD thesis. University of Pennsylvania, USA.
-
Jovanovic, D., 1989. Improving Railroad In-time Performance: Models, Algorithms and Applications. PhD thesis. University of Pennsylvania, USA.
-
(1989)
-
-
Jovanovic, D.1
-
39
-
-
0345428567
-
A decision support system for train dispatching: an optimization-based methodology
-
Jovanovic D., Harker P.T. A decision support system for train dispatching: an optimization-based methodology. Journal of the Transportation Research Forum 1990, 31(1):25-37.
-
(1990)
Journal of the Transportation Research Forum
, vol.31
, Issue.1
, pp. 25-37
-
-
Jovanovic, D.1
Harker, P.T.2
-
40
-
-
0026104713
-
Tactical scheduling of rail operations: the SCAN I system
-
Jovanovic D., Harker P.T. Tactical scheduling of rail operations: the SCAN I system. Transportation Science 1991, 25(1):46-64.
-
(1991)
Transportation Science
, vol.25
, Issue.1
, pp. 46-64
-
-
Jovanovic, D.1
Harker, P.T.2
-
43
-
-
0034429299
-
-
Simulation within the railroad environment. In: Proceedings of the 2000 Winter Simulation Conference
-
Krueger, H., Vaillancourt, E., Drummie, A.M., Vucko, S.J., Bekavac, J., 2000. Simulation within the railroad environment. In: Proceedings of the 2000 Winter Simulation Conference, pp. 1191-1200.
-
(2000)
, pp. 1191-1200
-
-
Krueger, H.1
Vaillancourt, E.2
Drummie, A.M.3
Vucko, S.J.4
Bekavac, J.5
-
44
-
-
33645693976
-
DYNASMART-X
-
Center for Transportation Research, The University of Texas at Austin, USA, Analytical and Algorithmic Aspects
-
Mahmassani H.S., Hawas Y., Abdelghani K., Abdelfatah A., Chiu Y-C., Kang Y. DYNASMART-X. Technical Report ST067-85 1998, vol. II. Center for Transportation Research, The University of Texas at Austin, USA.
-
(1998)
Technical Report ST067-85
, vol.2
-
-
Mahmassani, H.S.1
Hawas, Y.2
Abdelghani, K.3
Abdelfatah, A.4
Chiu, Y.-C.5
Kang, Y.6
-
45
-
-
0001002199
-
Stochastic single machine scheduling with quadratic early-tardy penalties
-
Mittenthal J., Raghavachari M. Stochastic single machine scheduling with quadratic early-tardy penalties. Operations Research 1993, 41(4):786-796.
-
(1993)
Operations Research
, vol.41
, Issue.4
, pp. 786-796
-
-
Mittenthal, J.1
Raghavachari, M.2
-
46
-
-
0033622790
-
An exploratory hazard-based analysis of highway incident duration
-
Nam D., Mannering F. An exploratory hazard-based analysis of highway incident duration. Transportation Research Part A 2000, 34(2):85-102.
-
(2000)
Transportation Research Part A
, vol.34
, Issue.2
, pp. 85-102
-
-
Nam, D.1
Mannering, F.2
-
47
-
-
85029866366
-
-
Solving Single-track Railway Scheduling Problem using Constraint Programming. PhD thesis. The University of Leeds, UK.
-
Oliveira, E., 2001. Solving Single-track Railway Scheduling Problem using Constraint Programming. PhD thesis. The University of Leeds, UK.
-
(2001)
-
-
Oliveira, E.1
-
50
-
-
0002302632
-
Multiple user classes real-time traffic assignment for online operations: a rolling horizon solution framework
-
Peeta S., Mahmassani H.S. Multiple user classes real-time traffic assignment for online operations: a rolling horizon solution framework. Transportation Research Part C 1995, 3(2):83-98.
-
(1995)
Transportation Research Part C
, vol.3
, Issue.2
, pp. 83-98
-
-
Peeta, S.1
Mahmassani, H.S.2
-
51
-
-
0003438602
-
-
Prentice Hall, Englewood Cliffs, NJ
-
Pinedo M. Scheduling: Theory, Algorithms, and Systems 2002, Prentice Hall, Englewood Cliffs, NJ. second ed.
-
(2002)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
52
-
-
85029837033
-
-
Railroad Safety Statistics 2007 Preliminary Annual Report. US Department of Transportation Federal Railroad Administration, November 13. .
-
Railroad Safety Statistics 2007 Preliminary Annual Report. US Department of Transportation Federal Railroad Administration, November 13, 2008. http://www.safetydata.fra.dot.gov/Prelim/2007/r01.htm.
-
(2008)
-
-
-
53
-
-
0035741999
-
A multistage stochastic system optimum dynamic traffic assignment program with recourse for incident traffic management
-
Sawaya O.B., Doan D.L., Ziliaskopoulos A.K., Fourer R. A multistage stochastic system optimum dynamic traffic assignment program with recourse for incident traffic management. Transportation Research Record: Journal of the Transportation Research Board 2001, 1748:116-124.
-
(2001)
Transportation Research Record: Journal of the Transportation Research Board
, vol.1748
, pp. 116-124
-
-
Sawaya, O.B.1
Doan, D.L.2
Ziliaskopoulos, A.K.3
Fourer, R.4
-
54
-
-
77955639714
-
To wait or not to wait-and who goes first? Delay management with priority decisions
-
Schachtebeck M., Schöbel A. To wait or not to wait-and who goes first? Delay management with priority decisions. Transportation Science 2010, 44(3):307-321.
-
(2010)
Transportation Science
, vol.44
, Issue.3
, pp. 307-321
-
-
Schachtebeck, M.1
Schöbel, A.2
-
55
-
-
33845333239
-
-
Center for Transportation Studies, University of Virginia, Charlottesville, VA
-
Smith K., Smith B. Forecasting the Clearance Time of Freeway Accidents. Research Report. STL-2001-01 2001, Center for Transportation Studies, University of Virginia, Charlottesville, VA.
-
(2001)
Forecasting the Clearance Time of Freeway Accidents. Research Report. STL-2001-01
-
-
Smith, K.1
Smith, B.2
-
56
-
-
0001519535
-
New model for predicting incidents and incident delay
-
Sullivan E.C. New model for predicting incidents and incident delay. ASCE Journal of Transportation Engineering 1997, 123(4):267-275.
-
(1997)
ASCE Journal of Transportation Engineering
, vol.123
, Issue.4
, pp. 267-275
-
-
Sullivan, E.C.1
-
57
-
-
0011877979
-
-
Optimal train scheduling on a single track railway. Operational research' 72. In: The 6th IFORS International Conference, Dublin, Ireland
-
Szpigel, B., 1973. Optimal train scheduling on a single track railway. Operational research' 72. In: The 6th IFORS International Conference, Dublin, Ireland, pp. 343-352.
-
(1973)
, pp. 343-352
-
-
Szpigel, B.1
-
58
-
-
33845266135
-
N-tracked railway traffic re-scheduling during disturbances
-
Tornquist J., Persson J. N-tracked railway traffic re-scheduling during disturbances. Transportation Research Part B 2007, 41(3):342-362.
-
(2007)
Transportation Research Part B
, vol.41
, Issue.3
, pp. 342-362
-
-
Tornquist, J.1
Persson, J.2
-
60
-
-
34250655003
-
A structural state space model for real-time origin-destination demand estimation and prediction in a day-to-day updating framework
-
Zhou X., Mahmassani H.S. A structural state space model for real-time origin-destination demand estimation and prediction in a day-to-day updating framework. Transportation Research Part B 2007, 41(8):823-840.
-
(2007)
Transportation Research Part B
, vol.41
, Issue.8
, pp. 823-840
-
-
Zhou, X.1
Mahmassani, H.S.2
-
61
-
-
13544267417
-
Bi-criteria train scheduling for high-speed passenger railroad planning applications
-
Zhou X., Zhong M. Bi-criteria train scheduling for high-speed passenger railroad planning applications. European Journal of Operational Research 2005, 167(3):752-771.
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 752-771
-
-
Zhou, X.1
Zhong, M.2
-
62
-
-
33845274298
-
Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds
-
Zhou X., Zhong M. Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds. Transportation Research Part B 2007, 41(3):320-341.
-
(2007)
Transportation Research Part B
, vol.41
, Issue.3
, pp. 320-341
-
-
Zhou, X.1
Zhong, M.2
|