메뉴 건너뛰기




Volumn 235, Issue 3, 2014, Pages 583-593

Adjusting a railway timetable in case of partial or complete blockades

Author keywords

Disruption management; Integer programming; Railways; Timetabling; Transportation

Indexed keywords


EID: 84894472686     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2013.12.020     Document Type: Article
Times cited : (133)

References (19)
  • 1
    • 0442265797 scopus 로고    scopus 로고
    • Scheduling railway traffic at a construction site
    • P. Brucker, S. Heitmann, and S. Knust Scheduling railway traffic at a construction site OR Spectrum 24 1 2002 19 30
    • (2002) OR Spectrum , vol.24 , Issue.1 , pp. 19-30
    • Brucker, P.1    Heitmann, S.2    Knust, S.3
  • 2
    • 43949092779 scopus 로고    scopus 로고
    • A column generation approach to train timetabling on a corridor
    • V. Cacchiani, A. Caprara, and P. Toth A column generation approach to train timetabling on a corridor 4OR 6 2 2008 125 142
    • (2008) 4OR , vol.6 , Issue.2 , pp. 125-142
    • Cacchiani, V.1    Caprara, A.2    Toth, P.3
  • 5
    • 79957501414 scopus 로고    scopus 로고
    • A new resource-constrained multicommodity flow model for conflict-free train routing and scheduling
    • G. Caimi, F. Chudak, M. Fuchsberger, M. Laumanns, and R. Zenklusen A new resource-constrained multicommodity flow model for conflict-free train routing and scheduling Transportation Science 45 2 2011 212 227
    • (2011) Transportation Science , vol.45 , Issue.2 , pp. 212-227
    • Caimi, G.1    Chudak, F.2    Fuchsberger, M.3    Laumanns, M.4    Zenklusen, R.5
  • 6
    • 0036759198 scopus 로고    scopus 로고
    • Modeling and solving the train timetabling problem
    • A. Caprara, M. Fischetti, and P. Toth Modeling and solving the train timetabling problem Operations Research 50 5 2002 851 861
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 851-861
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 8
    • 70449635732 scopus 로고    scopus 로고
    • Reordering and local rerouting strategies to manage train traffic in real time
    • A. D'Ariano, F. Corman, D. Pacciarelli, and M. Pranzo Reordering and local rerouting strategies to manage train traffic in real time Transportation Science 42 4 2008 405 419
    • (2008) Transportation Science , vol.42 , Issue.4 , pp. 405-419
    • D'Ariano, A.1    Corman, F.2    Pacciarelli, D.3    Pranzo, M.4
  • 11
    • 0043207353 scopus 로고    scopus 로고
    • A variable trip time model for cyclic railway timetabling
    • L.G. Kroon, and L.W.P. Peeters A variable trip time model for cyclic railway timetabling Transportation Science 37 2 2003 198 212
    • (2003) Transportation Science , vol.37 , Issue.2 , pp. 198-212
    • Kroon, L.G.1    Peeters, L.W.P.2
  • 12
    • 49949090088 scopus 로고    scopus 로고
    • The modeling power of the periodic event scheduling problem: Railway timetables and beyond
    • F. Geraets, L.G. Kroon, A. Schöbel, D. Wagner, C. Zaroliagis, LNCS 4359 Springer Berlin
    • C. Liebchen, and R.H. Möhring The modeling power of the periodic event scheduling problem: Railway timetables and beyond F. Geraets, L.G. Kroon, A. Schöbel, D. Wagner, C. Zaroliagis, Railway Optimization 2004 LNCS 4359 2007 Springer Berlin 3 40
    • (2007) Railway Optimization 2004 , pp. 3-40
    • Liebchen, C.1    Möhring, R.H.2
  • 13
    • 79960086387 scopus 로고    scopus 로고
    • Railway track allocation: Models and methods
    • R.M. Lusby, J. Larsen, M. Ehrgott, and D. Ryan Railway track allocation: models and methods OR Spectrum 33 4 2011 843 883
    • (2011) OR Spectrum , vol.33 , Issue.4 , pp. 843-883
    • Lusby, R.M.1    Larsen, J.2    Ehrgott, M.3    Ryan, D.4
  • 15
    • 78649761026 scopus 로고    scopus 로고
    • Column generation with dynamic duty selection for railway crew rescheduling
    • D. Potthoff, D. Huisman, and G. Desaulniers Column generation with dynamic duty selection for railway crew rescheduling Transportation Science 44 4 2010 493 505
    • (2010) Transportation Science , vol.44 , Issue.4 , pp. 493-505
    • Potthoff, D.1    Huisman, D.2    Desaulniers, G.3
  • 16
    • 77955639714 scopus 로고    scopus 로고
    • To wait or not to wait and who goes first? Delay management with priority decisions
    • M. Schachtebeck, and A. Schöbel To wait or not to wait and who goes first? Delay management with priority decisions Transportation Science 44 3 2010 307 321
    • (2010) Transportation Science , vol.44 , Issue.3 , pp. 307-321
    • Schachtebeck, M.1    Schöbel, A.2
  • 17
    • 49949111098 scopus 로고    scopus 로고
    • Integer programming approaches for solving the delay management problem
    • Springer Berlin
    • A. Schöbel Integer programming approaches for solving the delay management problem Algorithmic Methods for Railway Optimization 2007 Springer Berlin 145 170
    • (2007) Algorithmic Methods for Railway Optimization , pp. 145-170
    • Schöbel, A.1
  • 18
    • 33845266135 scopus 로고    scopus 로고
    • N-Tracked railway traffic re-scheduling during disturbances
    • J. Törnquist, and J.A. Persson N-Tracked railway traffic re-scheduling during disturbances Transportation Research Part B 41 3 2007 342 362
    • (2007) Transportation Research Part B , vol.41 , Issue.3 , pp. 342-362
    • Törnquist, J.1    Persson, J.A.2
  • 19
    • 0008917539 scopus 로고
    • A mathematical model for periodic scheduling problems
    • W. Ukovich, and P. Serafini A mathematical model for periodic scheduling problems SIAM Journal on Discrete Mathematics 2 4 1989 550 581
    • (1989) SIAM Journal on Discrete Mathematics , vol.2 , Issue.4 , pp. 550-581
    • Ukovich, W.1    Serafini, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.