-
3
-
-
0011519209
-
-
M. Crawford, J. Cann, R. O'Leary (Eds.), London: Royal Institute of British Architects (RIBA) Publications
-
Crawford, M., Cann, J., and O'Leary, R., eds. (1997). Uniclass (unified classification for the construction industry), Royal Institute of British Architects (RIBA) Publications, London.
-
(1997)
Uniclass (Unified Classification for the Construction Industry)
-
-
-
4
-
-
78049476848
-
-
CSA (Construction Systems Associates) Construction Systems Associates Inc
-
CSA (Construction Systems Associates) (2004). PMvision, detailed description of CSA's 4D tool, Construction Systems Associates Inc., http://www. csaatl. com.
-
(2004)
PMvision, detailed description of CSA's 4D tool
-
-
-
5
-
-
24144449307
-
-
CSI/CSC, Alexandria, VA, USA: Construction Specification Institute/Construction Specifications
-
CSI/CSC (1988). Masterformat: Manual of practice, Construction Specification Institute/Construction Specifications, Alexandria, VA, USA.
-
(1988)
Masterformat: Manual of Practice
-
-
-
7
-
-
1442312867
-
4D visualization development: Real life case studies
-
Aarhus, Denmark
-
Dawood, N., Sriprasert, E., Mallasi, Z., and Hobbs, B.. (2002). "4D visualization development: Real life case studies." Conference Proceeding of CIB w78 Conference, Aarhus, Denmark.
-
(2002)
Conference Proceeding of CIB w78 Conference
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
8
-
-
0037332742
-
Development of an integrated resources base for 4D/VR construction process simulation
-
Dawood, N., Sriprasert, E., Mallasi, Z., and Hobbs, B. (2003). "Development of an integrated resources base for 4D/VR construction process simulation." Automation in Construction, Vol. 12, No. 2, pp. 123-131.
-
(2003)
Automation in Construction
, vol.12
, Issue.2
, pp. 123-131
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
10
-
-
77949519133
-
-
Construction Informatics Digital Library
-
Gao, J., Fischer, M., Tollefsen, T., and Haugen, T. (2005). Experiences with 3D and 4D CAD on building construction projects: Benefits for project success and controllable implementation factors, Construction Informatics Digital Library, http://itc. scix. net.
-
(2005)
Experiences with 3D and 4D CAD on building construction projects: Benefits for project success and controllable implementation factors
-
-
Gao, J.1
Fischer, M.2
Tollefsen, T.3
Haugen, T.4
-
13
-
-
0342809824
-
Information management to integrate cost and schedule for civil engineering project
-
Kang, L. S. and Paulson, B. C. (1998). "Information management to integrate cost and schedule for civil engineering project." J. Constr. Engrg. and Mgmt., ASCE, Vol. 124, No. 5, pp. 381-389.
-
(1998)
J. Constr. Engrg. And Mgmt.
, vol.124
, Issue.5
, pp. 381-389
-
-
Kang, L.S.1
Paulson, B.C.2
-
14
-
-
0033687441
-
Information classification for civil engineering projects by Uniclass
-
Kang, L. S. and Paulson, B. C. (2000). "Information classification for civil engineering projects by Uniclass." J. Constr. Engrg. and Mgmt., ASCE, Vol. 126, No. 2, pp. 158-167.
-
(2000)
J. Constr. Engrg. And Mgmt.
, vol.126
, Issue.2
, pp. 158-167
-
-
Kang, L.S.1
Paulson, B.C.2
-
15
-
-
70449621620
-
Simplified information management methodology to link 2D/3D objects in 4D systems for civil engineering projects
-
Lisbon, Portugal: ADDETI/ISCTE
-
Kang, L. S., Jee, S. B., Kim, C. H., and Lee, Y. S. (2004). "Simplified information management methodology to link 2D/3D objects in 4D systems for civil engineering projects." 4th International Conference on Construction Application of Virtual Reality, ADDETI/ISCTE, Lisbon, Portugal.
-
(2004)
4th International Conference on Construction Application of Virtual Reality
-
-
Kang, L.S.1
Jee, S.B.2
Kim, C.H.3
Lee, Y.S.4
-
16
-
-
70449604290
-
4D system for visualizing schedule progress of horizontal construction project including earthwork
-
Orlando, FL, USA
-
Kang, L. S., Jee, S. B., Kim, C. H., Park, S. Y., and Moon, H. S. (2006). "4D system for visualizing schedule progress of horizontal construction project including earthwork." 6th International Conference on Construction Application of Virtual Reality, Orlando, FL, USA.
-
(2006)
6th International Conference on Construction Application of Virtual Reality
-
-
Kang, L.S.1
Jee, S.B.2
Kim, C.H.3
Park, S.Y.4
Moon, H.S.5
-
17
-
-
78049485743
-
Improvement of basic functions for visualizing schedule and 3D object in 4D CAD system
-
Cape Town, South Africa
-
Kang, L. S., Park, S. Y., Moon, H. S., and Kim, C. H. (2007). "Improvement of basic functions for visualizing schedule and 3D object in 4D CAD system." Conference Proceedings of CIB 2007, Cape Town, South Africa.
-
(2007)
Conference Proceedings of CIB 2007
-
-
Kang, L.S.1
Park, S.Y.2
Moon, H.S.3
Kim, C.H.4
-
18
-
-
77949516263
-
Identification, and visualization of construction activities? workspace conflicts utilizing 4D cad/VR tools
-
Dhahran, Saudi Arabia
-
Mallasi, Z. (2004). "Identification, and visualization of construction activities? workspace conflicts utilizing 4D cad/VR tools." 1st ASCAAD International Conference, Dhahran, Saudi Arabia, pp. 235-253.
-
(2004)
1st ASCAAD International Conference
, pp. 235-253
-
-
Mallasi, Z.1
|