메뉴 건너뛰기




Volumn 14, Issue 6, 2010, Pages 803-814

Improved link system between schedule data and 3D object in 4D CAD system by using WBS code

Author keywords

3D object; 4D CAD system; schedule; virtual reality; Work Breakdown Structure (WBS)

Indexed keywords

3D OBJECT; 4D CAD SYSTEM; BASIC FUNCTIONS; CAD SYSTEM; CIVIL ENGINEERING PROJECTS; CONSTRUCTION SCHEDULES; D-SYSTEM; EXISTING SYSTEMS; INFORMATION CENTER; INFORMATION STRUCTURES; LARGE PROJECT; LINK SYSTEM; NEW APPROACHES; PROJECT MANAGERS; SCHEDULE; WORK BREAKDOWN STRUCTURE;

EID: 78049472053     PISSN: 12267988     EISSN: 19763808     Source Type: Journal    
DOI: 10.1007/s12205-010-0960-4     Document Type: Article
Times cited : (19)

References (20)
  • 3
    • 0011519209 scopus 로고    scopus 로고
    • M. Crawford, J. Cann, R. O'Leary (Eds.), London: Royal Institute of British Architects (RIBA) Publications
    • Crawford, M., Cann, J., and O'Leary, R., eds. (1997). Uniclass (unified classification for the construction industry), Royal Institute of British Architects (RIBA) Publications, London.
    • (1997) Uniclass (Unified Classification for the Construction Industry)
  • 4
    • 78049476848 scopus 로고    scopus 로고
    • CSA (Construction Systems Associates) Construction Systems Associates Inc
    • CSA (Construction Systems Associates) (2004). PMvision, detailed description of CSA's 4D tool, Construction Systems Associates Inc., http://www. csaatl. com.
    • (2004) PMvision, detailed description of CSA's 4D tool
  • 5
    • 24144449307 scopus 로고
    • CSI/CSC, Alexandria, VA, USA: Construction Specification Institute/Construction Specifications
    • CSI/CSC (1988). Masterformat: Manual of practice, Construction Specification Institute/Construction Specifications, Alexandria, VA, USA.
    • (1988) Masterformat: Manual of Practice
  • 8
    • 0037332742 scopus 로고    scopus 로고
    • Development of an integrated resources base for 4D/VR construction process simulation
    • Dawood, N., Sriprasert, E., Mallasi, Z., and Hobbs, B. (2003). "Development of an integrated resources base for 4D/VR construction process simulation." Automation in Construction, Vol. 12, No. 2, pp. 123-131.
    • (2003) Automation in Construction , vol.12 , Issue.2 , pp. 123-131
    • Dawood, N.1    Sriprasert, E.2    Mallasi, Z.3    Hobbs, B.4
  • 13
    • 0342809824 scopus 로고    scopus 로고
    • Information management to integrate cost and schedule for civil engineering project
    • Kang, L. S. and Paulson, B. C. (1998). "Information management to integrate cost and schedule for civil engineering project." J. Constr. Engrg. and Mgmt., ASCE, Vol. 124, No. 5, pp. 381-389.
    • (1998) J. Constr. Engrg. And Mgmt. , vol.124 , Issue.5 , pp. 381-389
    • Kang, L.S.1    Paulson, B.C.2
  • 14
    • 0033687441 scopus 로고    scopus 로고
    • Information classification for civil engineering projects by Uniclass
    • Kang, L. S. and Paulson, B. C. (2000). "Information classification for civil engineering projects by Uniclass." J. Constr. Engrg. and Mgmt., ASCE, Vol. 126, No. 2, pp. 158-167.
    • (2000) J. Constr. Engrg. And Mgmt. , vol.126 , Issue.2 , pp. 158-167
    • Kang, L.S.1    Paulson, B.C.2
  • 15
    • 70449621620 scopus 로고    scopus 로고
    • Simplified information management methodology to link 2D/3D objects in 4D systems for civil engineering projects
    • Lisbon, Portugal: ADDETI/ISCTE
    • Kang, L. S., Jee, S. B., Kim, C. H., and Lee, Y. S. (2004). "Simplified information management methodology to link 2D/3D objects in 4D systems for civil engineering projects." 4th International Conference on Construction Application of Virtual Reality, ADDETI/ISCTE, Lisbon, Portugal.
    • (2004) 4th International Conference on Construction Application of Virtual Reality
    • Kang, L.S.1    Jee, S.B.2    Kim, C.H.3    Lee, Y.S.4
  • 17
    • 78049485743 scopus 로고    scopus 로고
    • Improvement of basic functions for visualizing schedule and 3D object in 4D CAD system
    • Cape Town, South Africa
    • Kang, L. S., Park, S. Y., Moon, H. S., and Kim, C. H. (2007). "Improvement of basic functions for visualizing schedule and 3D object in 4D CAD system." Conference Proceedings of CIB 2007, Cape Town, South Africa.
    • (2007) Conference Proceedings of CIB 2007
    • Kang, L.S.1    Park, S.Y.2    Moon, H.S.3    Kim, C.H.4
  • 18
    • 77949516263 scopus 로고    scopus 로고
    • Identification, and visualization of construction activities? workspace conflicts utilizing 4D cad/VR tools
    • Dhahran, Saudi Arabia
    • Mallasi, Z. (2004). "Identification, and visualization of construction activities? workspace conflicts utilizing 4D cad/VR tools." 1st ASCAAD International Conference, Dhahran, Saudi Arabia, pp. 235-253.
    • (2004) 1st ASCAAD International Conference , pp. 235-253
    • Mallasi, Z.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.