Construction workspace management: The development and application of a novel nD planning approach and tool

Author keywords

4D 5D planning; Building Information Modeling (BIM); Construction workspace; Construction workspace management

Indexed keywords

BUILDING INFORMATION MODELING; CONSTRUCTION PROCESS; CONSTRUCTION SITES; CRITICAL PATH METHOD; DYNAMIC NATURE; PRO-ACTIVE APPROACH; PROACTIVE MANAGEMENT; PROJECT MANAGERS; PROJECT PLANNERS; REAL-TIME MANAGEMENT; RESEARCH PAPERS; TRADITIONAL PLANNING;

EID: 84867883768     PISSN: 14036835     EISSN: 14006529     Source Type: Journal    
DOI: None     Document Type: Review
Times cited : (71)

References (34)
  • 2
    • 79952291359 scopus 로고    scopus 로고
    • Use of GIS and topology in the identification and resolution of space conflicts
    • Bansal, V. K. (2011) Use of GIS and topology in the identification and resolution of space conflicts. Journal of Computing in Civil Engineering, vol. 25, no. 2, pp. 159-171.
    • (2011) Journal of Computing in Civil Engineering , vol.25 , Issue.2 , pp. 159-171
    • Bansal, V.K.1
  • 6
    • 13944251393 scopus 로고    scopus 로고
    • Four-dimensional visualization of construction scheduling and site utilization
    • Chau, K. W., Anson, M. and Zhang, J. P. (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, vol. 130, pp. 598-606.
    • (2004) Journal of Construction Engineering and Management , vol.130 , pp. 598-606
    • Chau, K.W.1    Anson, M.2    Zhang, J.P.3
  • 7
    • 77952911062 scopus 로고    scopus 로고
    • Quantification of spatial temporal congestion in Four-dimensional computer-aided design
    • Chua, D., Yeoh, K. and Song, Y. (2010) Quantification of spatial temporal congestion in Four-dimensional computer-aided design. Journal of Construction Engineering and Management, vol. 136, no. 6, pp. 641-649.
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.6 , pp. 641-649
    • Chua, D.1    Yeoh, K.2    Song, Y.3
  • 8
    • 0029178789 scopus 로고
    • I-COLLIDE: An interactive and exact collision detection system for large-scaled environments
    • Cohen, J., Lin, M., Manocha, D., and Ponamgi, K. (1995) I-COLLIDE: an interactive and exact collision detection system for large-scaled environments, Symposium on Interactive 3D Graphics, pp. 189-196
    • (1995) Symposium on Interactive 3D Graphics , pp. 189-196
    • Cohen, J.1    Lin, M.2    Manocha, D.3    Ponamgi, K.4
  • 9
    • 21344439291 scopus 로고    scopus 로고
    • The virtual construction site (VIRCON) tools: An industrial evaluation
    • Special Issue 'From 3D to nD modelling'
    • Dawood, N., Scott, D., Sriprasert, E. and Mallasi, Z. (2005) The virtual construction site (VIRCON) tools: An industrial evaluation. Journal of Information Technology in Construction (ITCon). Special Issue 'From 3D to nD modelling', vol. 10, pp. 43-54
    • (2005) Journal of Information Technology in Construction (ITCon) , vol.10 , pp. 43-54
    • Dawood, N.1    Scott, D.2    Sriprasert, E.3    Mallasi, Z.4
  • 10
    • 33746778753 scopus 로고    scopus 로고
    • Construction workspace planning: Assignment and analysis utilizing 4D visualization technology
    • Dawood, N. and Mallasi, Z. (2006) Construction workspace planning: assignment and analysis utilizing 4D visualization technology. Computer-Aided Civil and Infrastructure Engineering, vol. 21, no. 7, pp. 498-513.
    • (2006) Computer-aided Civil and Infrastructure Engineering , vol.21 , Issue.7 , pp. 498-513
    • Dawood, N.1    Mallasi, Z.2
  • 11
    • 70350180267 scopus 로고    scopus 로고
    • Development of 4D based performance indicators in construction industry. Engineering
    • Dawood, N. and Sikka, S. (2009) Development of 4D based performance indicators in construction industry. Engineering. Construction and Architectural Management, vol. 16, pp. 438-458.
    • (2009) Construction and Architectural Management , vol.16 , pp. 438-458
    • Dawood, N.1    Sikka, S.2
  • 14
    • 34147115212 scopus 로고    scopus 로고
    • A virtual prototyping system for simulating construction processes
    • Huang, T., Kong, C. W., Guo, H. L., Baldwin, A. and Li, H. (2007) A virtual prototyping system for simulating construction processes. Automation in Construction, vol. 16, no. 5, pp. 576-585
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 576-585
    • Huang, T.1    Kong, C.W.2    Guo, H.L.3    Baldwin, A.4    Li, H.5
  • 15
    • 33847198334 scopus 로고    scopus 로고
    • Optimization of floor-level construction material layout using genetic algorithms
    • Jang, H., Lee, S. and Choi, S. (2007) Optimization of floor-level construction material layout using Genetic Algorithms. Automation in Construction, Vol. 16, No. 4, pp. 531-545.
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 531-545
    • Jang, H.1    Lee, S.2    Choi, S.3
  • 18
    • 0343384767 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • Stanford University
    • Koo, B. and Fischer, M. (1998) Feasibility study of 4D CAD in commercial construction. CIFE technical report 118, Stanford University.
    • (1998) CIFE Technical Report , pp. 118
    • Koo, B.1    Fischer, M.2
  • 19
    • 67449135877 scopus 로고    scopus 로고
    • Collision detection strategies for virtual construction simulation
    • Kuan-Chen, L. and Shih-Chung, K. (2009) Collision detection strategies for virtual construction simulation, Automation in Construction, Vol. 18, No. 6, pp. 724-736.
    • (2009) Automation in Construction , vol.18 , Issue.6 , pp. 724-736
    • Kuan-Chen, L.1    Shih-Chung, K.2
  • 20
    • 0041825829 scopus 로고    scopus 로고
    • Virtual experiment of innovative construction operations
    • Li, H., Ma, Z., Shen, Q. and Kong, S. (2003) Virtual experiment of innovative construction operations. Automation in Construction, vol. 12, no. 5, pp. 561-575.
    • (2003) Automation in Construction , vol.12 , Issue.5 , pp. 561-575
    • Li, H.1    Ma, Z.2    Shen, Q.3    Kong, S.4
  • 21
    • 70350169754 scopus 로고    scopus 로고
    • Towards minimizing space-time conflicts between site activities using simple generic algorithm - The best execution strategy
    • Special Issue Next Generation Construction IT: Technology Foresight, Future Studies, Road mapping, and Scenario Planning
    • Mallasi Z (2009) Towards minimizing space-time conflicts between site activities using simple generic algorithm - the best execution strategy, Journal of Information Technology in Construction (ITCon), Special Issue Next Generation Construction IT: Technology Foresight, Future Studies, Road mapping, and Scenario Planning, Vol. 14, pp. 154-179.
    • (2009) Journal of Information Technology in Construction (ITCon) , vol.14 , pp. 154-179
    • Mallasi, Z.1
  • 22
    • 84867848642 scopus 로고    scopus 로고
    • Configuration method of health and safety rule for improving productivity in construction space by multi-dimension CAD system
    • Jeju, Korea
    • Moon, H., Kang, L., Dawood, N. and Ji, S. (2009) Configuration method of health and safety rule for improving productivity in construction space by multi-dimension CAD system, ICCEM/ICCPM, Jeju, Korea
    • (2009) ICCEM/ICCPM
    • Moon, H.1    Kang, L.2    Dawood, N.3    Ji, S.4
  • 23
    • 0002299336 scopus 로고    scopus 로고
    • Space planning method for multi-story building construction
    • Riley, D. and Sanvido, V. (1997) Space planning method for multi-story building construction. Journal of Construction Engineering and Management, vol. 123, no. 2, pp. 171-80.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.2 , pp. 171-180
    • Riley, D.1    Sanvido, V.2
  • 24
    • 4344717496 scopus 로고    scopus 로고
    • A fuzzy based multi-objective path planning of construction sites
    • Soltani, A. and Fernando, T. (2004) A fuzzy based multi-objective path planning of construction sites, Automation in Construction, Vol. 13, No. 6, pp. 717-734.
    • (2004) Automation in Construction , vol.13 , Issue.6 , pp. 717-734
    • Soltani, A.1    Fernando, T.2
  • 25
    • 2942750055 scopus 로고    scopus 로고
    • Multi-constraint information management and visualisation for collaborative planning and control in construction
    • Special Issue eWork and eBusiness
    • Sriprasert, E. and Dawood, N. (2003) Multi-constraint information management and visualisation for collaborative planning and control in construction, Journal of Information Technology in Construction (ITCon), Special Issue eWork and eBusiness, Vol. 8, pp. 341-366.
    • (2003) Journal of Information Technology in Construction (ITCon) , vol.8 , pp. 341-366
    • Sriprasert, E.1    Dawood, N.2
  • 26
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • July/August
    • Guo, S. (2001) Identification and resolution of work space conflicts in building construction, Journal of Construction Engineering and Management, July/August 2002, Vol. 128, No. 4, pp. 287-29.
    • (2001) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 287-229
    • Guo, S.1
  • 27
    • 33846794387 scopus 로고    scopus 로고
    • Automated generation of workspace requirements of mobile crane operations to support conflict detection
    • May 2007
    • Tantisevi, K. and Akinci, B. (2007) Automated generation of workspace requirements of mobile crane operations to support conflict detection. Automation in Construction, May 2007, vol. 16, no. 3, pp. 262-276.
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 262-276
    • Tantisevi, K.1    Akinci, B.2
  • 28
    • 0028401574 scopus 로고
    • Modeling work space to schedule repetitive floors in multistory buildings
    • Thabet, W. Y. and Beliveau, Y. J. (1994) Modeling work space to schedule repetitive floors in multistory buildings, Journal of Construction Engineering and Management, vol. 120, no. 1, pp. 96-116.
    • (1994) Journal of Construction Engineering and Management , vol.120 , Issue.1 , pp. 96-116
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 29
    • 0342515142 scopus 로고
    • Loss of construction labor productivity due to inefficiencies and disruptions: The weight of expert opinion
    • Pennsylvania Transportation Institute, Pennsylvania State Univ
    • Thomas, H. R., Jr., and Smith, G. R. (1990) Loss of construction labor productivity due to inefficiencies and disruptions: The weight of expert opinion, PTI Rep. No. 9019, Pennsylvania Transportation Institute, Pennsylvania State Univ.
    • (1990) PTI Rep. No. 9019
    • Thomas Jr., H.R.1    Smith, G.R.2
  • 33
    • 79551684087 scopus 로고    scopus 로고
    • BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
    • Zhang, J. P. and Hu, Z. Z. (2011) BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies, Automation in Construction, vol. 20, pp. 155-166.
    • (2011) Automation in Construction , vol.20 , pp. 155-166
    • Zhang, J.P.1    Hu, Z.Z.2
  • 34
    • 70349785210 scopus 로고    scopus 로고
    • An interactive approach to collaborative 4D construction planning
    • Special Issue Technology Strategies for Collaborative Working
    • Zhou W., Heesom D., Georgakis P., Nwagboso C., Feng A. (2009) An interactive approach to collaborative 4D construction planning. Journal of Information Technology in Construction (ITCon), Special Issue Technology Strategies for Collaborative Working, vol. 14, pp. 30-47.
    • (2009) Journal of Information Technology in Construction (ITCon) , vol.14 , pp. 30-47
    • Zhou, W.1    Heesom, D.2    Georgakis, P.3    Nwagboso, C.4    Feng, A.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.