1
-
-
12144266471
-
A heuristic to maximize the net present value for resource-constrained project scheduling problems
-
Abbasi, G. Y., and, Arabiat, Y. A. (2001). " A heuristic to maximize the net present value for resource-constrained project scheduling problems." Proj. Manage. J. 1938-9507, 32 (2), 17-24.
-
(2001)
Proj. Manage. J. 1938-9507
, vol.32
, Issue.2
, pp. 17-24
-
-
Abbasi, G.Y.1
Arabiat, Y.A.2
-
2
-
-
0038209741
-
Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
-
10.1057/palgrave.jors.2601563
-
Alcaraz, J., Maroto, C., and, Ruiz, R. (2003). " Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms." J. Oper. Res. Soc. JORSDZ 0160-5682, 54 (6), 614-626. 10.1057/palgrave.jors.2601563
-
(2003)
J. Oper. Res. Soc. JORSDZ 0160-5682
, vol.54
, Issue.6
, pp. 614-626
-
-
Alcaraz, J.1
Maroto, C.2
Ruiz, R.3
-
3
-
-
82155186857
-
Ant colony optimisation solution to distribution transformer planning problem
-
10.1504/IJAIP.2010.036398
-
Amoiralis, E. I., Georgilakis, P. S., Tsili, M. A., and, Kladas, A. G. (2010). " Ant colony optimisation solution to distribution transformer planning problem." Int. J. Adv. Intelligence Paradigms 1755-0386, 2 (4), 316-335. 10.1504/IJAIP.2010.036398
-
(2010)
Int. J. Adv. Intelligence Paradigms 1755-0386
, vol.2
, Issue.4
, pp. 316-335
-
-
Amoiralis, E.I.1
Georgilakis, P.S.2
Tsili, M.A.3
Kladas, A.G.4
-
4
-
-
28944454561
-
Ant colony optimization: Introduction and recent trends
-
10.1016/j.plrev.2005.10.001
-
Blum, C. (2005). " Ant colony optimization: Introduction and recent trends." Phys. Life Rev. 1571-0645, 2 (4), 353-373. 10.1016/j.plrev.2005. 10.001
-
(2005)
Phys. Life Rev. 1571-0645
, vol.2
, Issue.4
, pp. 353-373
-
-
Blum, C.1
-
5
-
-
18744404504
-
An ant colony optimization algorithm for shop scheduling problems
-
10.1023/B:JMMA.0000038614.39977.6f
-
Blum, C., and, Sampels, M. (2004). " An ant colony optimization algorithm for shop scheduling problems." J. Math. Model. Algorithm 1570-1166, 3 (3), 285-308. 10.1023/B:JMMA.0000038614.39977.6f
-
(2004)
J. Math. Model. Algorithm 1570-1166
, vol.3
, Issue.3
, pp. 285-308
-
-
Blum, C.1
Sampels, M.2
-
6
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several resource-duration modes
-
10.1080/00207549308956882
-
Boctor, F. F. (1993). " Heuristics for scheduling projects with resource restrictions and several resource-duration modes." Int. J. Prod. Res. IJPRB8 0020-7543, 31 (11), 2547-2558. 10.1080/00207549308956882
-
(1993)
Int. J. Prod. Res. IJPRB8 0020-7543
, vol.31
, Issue.11
, pp. 2547-2558
-
-
Boctor, F.F.1
-
7
-
-
0030124780
-
A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
-
10.1016/0377-2217(95)00359-2
-
Boctor, F. F. (1996). " A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes." Eur. J. Oper. Res. EJORDT 0377-2217, 90 (2), 349-361. 10.1016/0377-2217(95)00359-2
-
(1996)
Eur. J. Oper. Res. EJORDT 0377-2217
, vol.90
, Issue.2
, pp. 349-361
-
-
Boctor, F.F.1
-
8
-
-
0001631336
-
Evolving ant colony optimization
-
10.1142/S0219525998000119
-
Bottee, H. M., and, Bonabeau, E. (1998). " Evolving ant colony optimization." Adv. Compl. Syst. 0219-5259, 1 (2/3), 149-159. 10.1142/S0219525998000119
-
(1998)
Adv. Compl. Syst. 0219-5259
, vol.1
, Issue.23
, pp. 149-159
-
-
Bottee, H.M.1
Bonabeau, E.2
-
9
-
-
0043114397
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem
-
Barbarosoglu, G. Karabati, S. Özdamar, L. and Ulusoy, G. eds. Bogazici Univ. Istanbul, Turkey
-
Bouleimen, K., and, Lecocq, H. (1998). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem." Proc., Sixth Int. Workshop on Project Management and Scheduling, Barbarosoglu, G., Karabati, S., Özdamar, L., and Ulusoy, G., eds., Bogazici Univ., Istanbul, Turkey, 19-22.
-
(1998)
Proc. Sixth Int. Workshop on Project Management and Scheduling
, pp. 19-22
-
-
Bouleimen, K.1
Lecocq, H.2
-
10
-
-
0001822278
-
A new rank based version of the ant system - A computational study
-
Bullnheimer, B., Hartl, R. F., and, Strauss, C. (1999). " A new rank based version of the ant system-A computational study." Central Europ. J. Operations Res. 1435-246X, 7 (1), 25-38.
-
(1999)
Central Europ. J. Operations Res. 1435-246X
, vol.7
, Issue.1
, pp. 25-38
-
-
Bullnheimer, B.1
Hartl, R.F.2
Strauss, C.3
-
11
-
-
73149125765
-
An efficient hybrid algorithm for resource-constrained project scheduling
-
10.1016/j.ins.2009.11.044
-
Chen, W., Shi, Y. J., Teng, H. F., Lan, X. P., and, Hu, L. C. (2010). " An efficient hybrid algorithm for resource-constrained project scheduling." Inf. Sci. ISIJBC 0020-0255, 180 (6), 1031-1039. 10.1016/j.ins.2009.11.044
-
(2010)
Inf. Sci. ISIJBC 0020-0255
, vol.180
, Issue.6
, pp. 1031-1039
-
-
Chen, W.1
Shi, Y.J.2
Teng, H.F.3
Lan, X.P.4
Hu, L.C.5
-
12
-
-
73349109790
-
Scheduling resource-constrained projects with ant colony optimization artificial agents
-
10.1061/(ASCE)0887-3801(2010)24:1(45)
-
Christodoulou, S. (2010). " Scheduling resource-constrained projects with ant colony optimization artificial agents." J. Comput. Civ. Eng. JCCEE5 0887-3801, 24 (1), 45-55. 10.1061/(ASCE)0887-3801(2010)24:1(45)
-
(2010)
J. Comput. Civ. Eng. JCCEE5 0887-3801
, vol.24
, Issue.1
, pp. 45-55
-
-
Christodoulou, S.1
-
13
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
10.1287/mnsc.38.12.1803
-
Demeulemeester, E., and, Herrolen, W. (1992). " A branch-and-bound procedure for the multiple resource-constrained project scheduling problem." Manage. Sci. MSCIAM 0025-1909, 38 (12), 1803-1818. 10.1287/mnsc.38.12.1803
-
(1992)
Manage. Sci. MSCIAM 0025-1909
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herrolen, W.2
-
15
-
-
0033084695
-
Ant algorithms for discrete optimization
-
10.1162/106454699568728
-
Dorigo, M., Di, Caro, G., and, Gambardella, L. M. (1999). " Ant algorithms for discrete optimization." Artificial Life ARLIEY 1064-5462, 5 (2), 137-172. 10.1162/106454699568728
-
(1999)
Di. Artificial Life ARLIEY 1064-5462
, vol.5
, Issue.2
, pp. 137-172
-
-
Dorigo, M.1
Caro, G.2
Gambardella, L.M.3
-
16
-
-
0031122887
-
Ant colony system: A cooperative learning approach to the traveling salesman problem
-
10.1109/4235.585892
-
Dorigo, M., and, Gambardella, L. M. (1997). " Ant colony system: A cooperative learning approach to the traveling salesman problem." IEEE Trans. Evol. Comput. 1089-778X, 1 (1), 53-66. 10.1109/4235.585892
-
(1997)
IEEE Trans. Evol. Comput. 1089-778X
, vol.1
, Issue.1
, pp. 53-66
-
-
Dorigo, M.1
Gambardella, L.M.2
-
17
-
-
0030082551
-
Ant system: Optimization by a colony of cooperating agents
-
10.1109/3477.484436
-
Dorigo, M., Maniezzo, V., and, Colorni, A. (1996). " Ant system: Optimization by a colony of cooperating agents." IEEE Trans. Syst. Man Cybern. 1083-4419, 26 (1), 29-41. 10.1109/3477.484436
-
(1996)
IEEE Trans. Syst. Man Cybern. 1083-4419
, vol.26
, Issue.1
, pp. 29-41
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
18
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
10.1080/07408179308964317
-
Drexl, A., and, Grünewald, J. (1993). " Nonpreemptive multi-mode resource-constrained project scheduling." IIE Trans. IIETDM 0740-817X, 25 (5), 74-81. 10.1080/07408179308964317
-
(1993)
IIE Trans. IIETDM 0740-817X
, vol.25
, Issue.5
, pp. 74-81
-
-
Drexl, A.1
Grünewald, J.2
-
19
-
-
77955569892
-
Improved ant colony optimization algorithms for determining project critical paths
-
10.1016/j.autcon.2010.02.012
-
Duan, Q., and, Liao, T. W. (2010). " Improved ant colony optimization algorithms for determining project critical paths." Autom. Constr. AUCOES 0926-5805, 19 (6), 676-693. 10.1016/j.autcon.2010.02.012
-
(2010)
Autom. Constr. AUCOES 0926-5805
, vol.19
, Issue.6
, pp. 676-693
-
-
Duan, Q.1
Liao, T.W.2
-
20
-
-
60749102079
-
On optimal parameters for ant colony optimization algorithms
-
Gaertner, D., and, Clark, K. (2005). " On optimal parameters for ant colony optimization algorithms." Proc., Int. Conf. on Artificial Intelligence 2005, CSREA Press, 83-89.
-
(2005)
Proc. Int. Conf. on Artificial Intelligence 2005, CSREA Press
, pp. 83-89
-
-
Gaertner, D.1
Clark, K.2
-
21
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
10.1002/(SICI)1520-6750(199810)45:7<733: AID-NAV5>3.0.CO;2-C
-
Hartmann, S. (1998). " A competitive genetic algorithm for resource-constrained project scheduling." Nav. Res. Logistics NRLOEP 1520-6750, 45 (7), 733-750. 10.1002/(SICI)1520-6750(199810)45:7<733::AID- NAV5>3.0.CO;2-C
-
(1998)
Nav. Res. Logistics NRLOEP 1520-6750
, vol.45
, Issue.7
, pp. 733-750
-
-
Hartmann, S.1
-
22
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
10.1023/A:1010902015091
-
Hartmann, S. (2001). " Project scheduling with multiple modes: A genetic algorithm." Ann. Oper. Res. AOREEV 0254-5330, 102 (1-4), 111-135. 10.1023/A:1010902015091
-
(2001)
Ann. Oper. Res. AOREEV 0254-5330
, vol.102
, Issue.14
, pp. 111-135
-
-
Hartmann, S.1
-
23
-
-
0040577754
-
Project scheduling with multiple modes: A comparison of exact algorithms
-
10.1002/(SICI)1097-0037(199812)32:4<283: AID-NET5>3.0.CO;2-I
-
Hartmann, S., and, Drexl, A. (1998). " Project scheduling with multiple modes: A comparison of exact algorithms." Networks NTWKAA 1097-0037, 32 (4), 283-297. 10.1002/(SICI)1097-0037(199812)32:4<283::AID- NET5>3.0.CO;2-I
-
(1998)
Networks NTWKAA 1097-0037
, vol.32
, Issue.4
, pp. 283-297
-
-
Hartmann, S.1
Drexl, A.2
-
24
-
-
34548613299
-
Ant colony optimization combined with taboo search for the job shop scheduling problem
-
10.1016/j.cor.2006.07.003
-
Huang, K. L., and, Liao, C. J. (2008). " Ant colony optimization combined with taboo search for the job shop scheduling problem." Comput. Oper. Res. CMORAP 0305-0548, 35 (4), 1030-1046. 10.1016/j.cor.2006.07.003
-
(2008)
Comput. Oper. Res. CMORAP 0305-0548
, vol.35
, Issue.4
, pp. 1030-1046
-
-
Huang, K.L.1
Liao, C.J.2
-
25
-
-
36749094527
-
A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
-
10.1016/j.amc.2007.04.096
-
Jarboui, B., Damak, N., Siarry, P., and, Rebai, A. (2008). " A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems." Appl. Math. Comput. AMHCBQ 0096-3003, 195 (1), 299-308. 10.1016/j.amc.2007.04.096
-
(2008)
Appl. Math. Comput. AMHCBQ 0096-3003
, vol.195
, Issue.1
, pp. 299-308
-
-
Jarboui, B.1
Damak, N.2
Siarry, P.3
Rebai, A.4
-
26
-
-
0034544454
-
Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
-
10.1016/S0377-2217(99)00347-1
-
Klein, R. (2000). " Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects." Eur. J. Oper. Res. EJORDT 0377-2217, 127 (3), 619-638. 10.1016/S0377-2217(99)00347-1
-
(2000)
Eur. J. Oper. Res. EJORDT 0377-2217
, vol.127
, Issue.3
, pp. 619-638
-
-
Klein, R.1
-
27
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
10.1016/0377-2217(95)00357-6
-
Kolisch, R. (1996). " Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation." Eur. J. Oper. Res. EJORDT 0377-2217, 90 (2), 320-333. 10.1016/0377-2217(95)00357-6
-
(1996)
Eur. J. Oper. Res. EJORDT 0377-2217
, vol.90
, Issue.2
, pp. 320-333
-
-
Kolisch, R.1
-
28
-
-
0031276875
-
Local search for nonpreemptive multi-mode resource-constrained project scheduling
-
10.1080/07408179708966417
-
Kolisch, R., and, Drexl, A. (1997). " Local search for nonpreemptive multi-mode resource-constrained project scheduling." IIE Trans. IIETDM 0740-817X, 29 (11), 987-999. 10.1080/07408179708966417
-
(1997)
IIE Trans. IIETDM 0740-817X
, vol.29
, Issue.11
, pp. 987-999
-
-
Kolisch, R.1
Drexl, A.2
-
29
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
10.1109/TEVC.2002.802450
-
Merkle, D., Middendorf, M., and, Schmeck, H. (2002). " Ant colony optimization for resource-constrained project scheduling." IEEE Trans. Evol. Comput. 1089-778X, 6 (4), 333-346. 10.1109/TEVC.2002.802450
-
(2002)
IEEE Trans. Evol. Comput. 1089-778X
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
30
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
10.1061/(ASCE)0733-9364(1993)119:4(681)
-
Moselhi, O., and El-, Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization." J. Constr. Eng. Manage. JCEMD4 0733-9364, 119 (4), 681-697. 10.1061/(ASCE)0733-9364(1993)119:4(681)
-
(1993)
El-. J. Constr. Eng. Manage. JCEMD4 0733-9364
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
Rayes, K.2
-
31
-
-
0000480311
-
An algorithm for a general class of precedence and resource-constrained scheduling problems
-
Slowinski, R. and Weglarz, J. W. eds. Elsevier, Amsterdam
-
Patterson, J. H., Slowinski, R., Talbot, F. B., and, Weglarz, J. W. (1989). " An algorithm for a general class of precedence and resource-constrained scheduling problems." Advances in project scheduling, Slowinski, R., and Weglarz, J. W., eds., Elsevier, Amsterdam, 3-28.
-
(1989)
Advances in Project Scheduling
, pp. 3-28
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.W.4
-
32
-
-
70349276753
-
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
-
10.1016/j.ejor.2009.03.034
-
Peteghem, V. V., and, Vanhoucke, M. (2010). " A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem." Eur. J. Oper. Res. EJORDT 0377-2217, 201 (2), 409-418. 10.1016/j.ejor.2009.03.034
-
(2010)
Eur. J. Oper. Res. EJORDT 0377-2217
, vol.201
, Issue.2
, pp. 409-418
-
-
Peteghem, V.V.1
Vanhoucke, M.2
-
33
-
-
0001150453
-
DSS for multiobjective project scheduling subject to multiple-category resource constraints
-
10.1016/0377-2217(94)90353-0
-
Slowinski, R., Soniewicki, B., and, Weglarz, J. (1994). " DSS for multiobjective project scheduling subject to multiple-category resource constraints." Eur. J. Oper. Res. EJORDT 0377-2217, 79 (2), 220-229. 10.1016/0377-2217(94)90353-0
-
(1994)
Eur. J. Oper. Res. EJORDT 0377-2217
, vol.79
, Issue.2
, pp. 220-229
-
-
Slowinski, R.1
Soniewicki, B.2
Weglarz, J.3
-
34
-
-
0027302081
-
Hierarchical models for multi-project planning and scheduling
-
10.1016/0377-2217(93)90185-P
-
Speranza, M. G., and, Vercellis, C. (1993). " Hierarchical models for multi-project planning and scheduling." Eur. J. Oper. Res. EJORDT 0377-2217, 64 (2), 312-325. 10.1016/0377-2217(93)90185-P
-
(1993)
Eur. J. Oper. Res. EJORDT 0377-2217
, vol.64
, Issue.2
, pp. 312-325
-
-
Speranza, M.G.1
Vercellis, C.2
-
35
-
-
0032096811
-
Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
-
10.1016/S0377-2217(97)00348-2
-
Sprecher, A., and, Drexl, A. (1998). " Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm." Eur. J. Oper. Res. EJORDT 0377-2217, 107 (2), 431-450. 10.1016/S0377-2217(97)00348-2
-
(1998)
Eur. J. Oper. Res. EJORDT 0377-2217
, vol.107
, Issue.2
, pp. 431-450
-
-
Sprecher, A.1
Drexl, A.2
-
36
-
-
33746101954
-
An exact algorithm for project scheduling with multiple modes
-
10.1007/BF01545587
-
Sprecher, A., Hartmann, S., and, Drexl, A. (1997). " An exact algorithm for project scheduling with multiple modes." OR Spektrum: Organ der Deutschen Gesellschaft fur Operations Research ORSPD5 1436-6304, 19 (3), 195-203. 10.1007/BF01545587
-
(1997)
OR Spektrum: Organ der Deutschen Gesellschaft fur Operations Research ORSPD5 1436-6304
, vol.19
, Issue.3
, pp. 195-203
-
-
Sprecher, A.1
Hartmann, S.2
Drexl, A.3
-
37
-
-
84974870375
-
Heuristic performance and network resource characteristics in resource constrained project scheduling
-
Ulusoy, G, and, Ozdamar, L. (1989). " Heuristic performance and network resource characteristics in resource constrained project scheduling." J. Opl. Res. Soc. 0160-5682, 40 (12), 1145-1152 10.1057/jors.1989.196.
-
(1989)
J. Opl. Res. Soc. 0160-5682, 1145-1152 10.1057/jors.1989.196
, vol.40
, Issue.12
-
-
Ulusoy, G.1
Ozdamar, L.2
-
38
-
-
51849097767
-
Parameter tuning for ant colony optimization: A review
-
Wong, K. Y., and, Komarudin. (2008). " Parameter tuning for ant colony optimization: A review." Proc. Int. Conf. on Computer and Communication Engineering (ICCCE 2008), Faculty of Engineering, International Islamic Univ. Malaysia, Kuala Lumpur, Malaysia. 542-545.
-
(2008)
Proc. Int. Conf. on Computer and Communication Engineering (ICCCE 2008), Faculty of Engineering, International Islamic Univ. Malaysia, Kuala Lumpur, Malaysia.
, pp. 542-545
-
-
Wong, K.Y.1
Komarudin2
-
39
-
-
70350574410
-
A genetic ant colony optimization system (GenANT) for quadratic assignment problems
-
10.1504/IJMOR.2009.026277
-
Wong, K. Y., and, See, P. C. (2009). " A genetic ant colony optimization system (GenANT) for quadratic assignment problems." Int. J. Math. Oper. Res. 1757-5850, 1 (4), 456-475. 10.1504/IJMOR.2009.026277
-
(2009)
Int. J. Math. Oper. Res. 1757-5850
, vol.1
, Issue.4
, pp. 456-475
-
-
Wong, K.Y.1
See, P.C.2
-
40
-
-
33645992444
-
Multi-mode project scheduling based on particle swarm optimization
-
10.1111/j.1467-8667.2005.00420.x
-
Zhang, H., Tam, C. M., and, Li, H. (2006). " Multi-mode project scheduling based on particle swarm optimization." Comput. Aided Civ. Infrastruct. Eng. CCIEFR 1093-9687, 21 (2), 93-103. 10.1111/j.1467-8667.2005. 00420.x
-
(2006)
Comput. Aided Civ. Infrastruct. Eng. CCIEFR 1093-9687
, vol.21
, Issue.2
, pp. 93-103
-
-
Zhang, H.1
Tam, C.M.2
Li, H.3
-
41
-
-
0035479302
-
Resource allocation heuristic in construction simulation
-
10.1080/01446190110063473
-
Zhang, H., Tam, C. M., and, Shi, J. J. (2001). " Resource allocation heuristic in construction simulation." Constr. Manage. Econ. 0144-6193, 19 (6), 643-651. 10.1080/01446190110063473
-
(2001)
Constr. Manage. Econ. 0144-6193
, vol.19
, Issue.6
, pp. 643-651
-
-
Zhang, H.1
Tam, C.M.2
Shi, J.J.3
-
42
-
-
62349130768
-
An ACO for solving RCPSP
-
Zhou, L., Wang, D., and, Peng, W. L. (2008). " An ACO for solving RCPSP." 2008 Int. Symp.on Computer Science and Computational Technology, IEEE Computer Society, Washington DC, 2, 250-253.
-
(2008)
2008 Int. Symp.On Computer Science and Computational Technology, IEEE Computer Society, Washington DC
, vol.2
, pp. 250-253
-
-
Zhou, L.1
Wang, D.2
Peng, W.L.3
-
43
-
-
77949277401
-
Improved ACO algorithm for resource-constrained project scheduling problem
-
Zhou, Y. M., Guo, Q. S., and, Gan, R. W. (2009). " Improved ACO algorithm for resource-constrained project scheduling problem." 2009 Int. Conf. on Artificial Intelligence and Computational Intelligence, IEEE, Piscataway, NJ, 3, 358-365.
-
(2009)
2009 Int. Conf. on Artificial Intelligence and Computational Intelligence, IEEE, Piscataway, NJ
, vol.3
, pp. 358-365
-
-
Zhou, Y.M.1
Guo, Q.S.2
Gan, R.W.3
-
44
-
-
33748521972
-
A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
-
10.1287/ijoc.1040.0121
-
Zhu, G., Bard, J., and, Tu, G. (2006). " A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem." INFORMS J. Comput. 1091-9856, 18 (3), 377-390. 10.1287/ijoc.1040.0121
-
(2006)
INFORMS J. Comput. 1091-9856
, vol.18
, Issue.3
, pp. 377-390
-
-
Zhu, G.1
Bard, J.2
Tu, G.3
|