메뉴 건너뛰기




Volumn 28, Issue 2, 2012, Pages 150-159

Ant colony optimization for multimode resource-constrained project scheduling

Author keywords

Ant colony optimization; Multiple execution modes; Project scheduling; Resource constrained

Indexed keywords

ACO ALGORITHMS; ANT COLONY OPTIMIZATION (ACO); COMPUTATIONAL ANALYSIS; FEASIBLE SCHEDULE; MINIMIZING PROJECT DURATION; MODE SELECTION; MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; MULTIMODES; MULTIPLE EXECUTION MODES; PROJECT SCHEDULING; RESOURCE CONSTRAINED PROJECT SCHEDULING; RESOURCE-CONSTRAINED; SERIAL SCHEDULE GENERATION SCHEME;

EID: 84870712321     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000089     Document Type: Article
Times cited : (47)

References (44)
  • 1
    • 12144266471 scopus 로고    scopus 로고
    • A heuristic to maximize the net present value for resource-constrained project scheduling problems
    • Abbasi, G. Y., and, Arabiat, Y. A. (2001). " A heuristic to maximize the net present value for resource-constrained project scheduling problems." Proj. Manage. J. 1938-9507, 32 (2), 17-24.
    • (2001) Proj. Manage. J. 1938-9507 , vol.32 , Issue.2 , pp. 17-24
    • Abbasi, G.Y.1    Arabiat, Y.A.2
  • 2
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • 10.1057/palgrave.jors.2601563
    • Alcaraz, J., Maroto, C., and, Ruiz, R. (2003). " Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms." J. Oper. Res. Soc. JORSDZ 0160-5682, 54 (6), 614-626. 10.1057/palgrave.jors.2601563
    • (2003) J. Oper. Res. Soc. JORSDZ 0160-5682 , vol.54 , Issue.6 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 3
    • 82155186857 scopus 로고    scopus 로고
    • Ant colony optimisation solution to distribution transformer planning problem
    • 10.1504/IJAIP.2010.036398
    • Amoiralis, E. I., Georgilakis, P. S., Tsili, M. A., and, Kladas, A. G. (2010). " Ant colony optimisation solution to distribution transformer planning problem." Int. J. Adv. Intelligence Paradigms 1755-0386, 2 (4), 316-335. 10.1504/IJAIP.2010.036398
    • (2010) Int. J. Adv. Intelligence Paradigms 1755-0386 , vol.2 , Issue.4 , pp. 316-335
    • Amoiralis, E.I.1    Georgilakis, P.S.2    Tsili, M.A.3    Kladas, A.G.4
  • 4
    • 28944454561 scopus 로고    scopus 로고
    • Ant colony optimization: Introduction and recent trends
    • 10.1016/j.plrev.2005.10.001
    • Blum, C. (2005). " Ant colony optimization: Introduction and recent trends." Phys. Life Rev. 1571-0645, 2 (4), 353-373. 10.1016/j.plrev.2005. 10.001
    • (2005) Phys. Life Rev. 1571-0645 , vol.2 , Issue.4 , pp. 353-373
    • Blum, C.1
  • 5
    • 18744404504 scopus 로고    scopus 로고
    • An ant colony optimization algorithm for shop scheduling problems
    • 10.1023/B:JMMA.0000038614.39977.6f
    • Blum, C., and, Sampels, M. (2004). " An ant colony optimization algorithm for shop scheduling problems." J. Math. Model. Algorithm 1570-1166, 3 (3), 285-308. 10.1023/B:JMMA.0000038614.39977.6f
    • (2004) J. Math. Model. Algorithm 1570-1166 , vol.3 , Issue.3 , pp. 285-308
    • Blum, C.1    Sampels, M.2
  • 6
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • 10.1080/00207549308956882
    • Boctor, F. F. (1993). " Heuristics for scheduling projects with resource restrictions and several resource-duration modes." Int. J. Prod. Res. IJPRB8 0020-7543, 31 (11), 2547-2558. 10.1080/00207549308956882
    • (1993) Int. J. Prod. Res. IJPRB8 0020-7543 , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 7
    • 0030124780 scopus 로고    scopus 로고
    • A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    • 10.1016/0377-2217(95)00359-2
    • Boctor, F. F. (1996). " A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes." Eur. J. Oper. Res. EJORDT 0377-2217, 90 (2), 349-361. 10.1016/0377-2217(95)00359-2
    • (1996) Eur. J. Oper. Res. EJORDT 0377-2217 , vol.90 , Issue.2 , pp. 349-361
    • Boctor, F.F.1
  • 8
    • 0001631336 scopus 로고    scopus 로고
    • Evolving ant colony optimization
    • 10.1142/S0219525998000119
    • Bottee, H. M., and, Bonabeau, E. (1998). " Evolving ant colony optimization." Adv. Compl. Syst. 0219-5259, 1 (2/3), 149-159. 10.1142/S0219525998000119
    • (1998) Adv. Compl. Syst. 0219-5259 , vol.1 , Issue.23 , pp. 149-159
    • Bottee, H.M.1    Bonabeau, E.2
  • 9
    • 0043114397 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem
    • Barbarosoglu, G. Karabati, S. Özdamar, L. and Ulusoy, G. eds. Bogazici Univ. Istanbul, Turkey
    • Bouleimen, K., and, Lecocq, H. (1998). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem." Proc., Sixth Int. Workshop on Project Management and Scheduling, Barbarosoglu, G., Karabati, S., Özdamar, L., and Ulusoy, G., eds., Bogazici Univ., Istanbul, Turkey, 19-22.
    • (1998) Proc. Sixth Int. Workshop on Project Management and Scheduling , pp. 19-22
    • Bouleimen, K.1    Lecocq, H.2
  • 11
    • 73149125765 scopus 로고    scopus 로고
    • An efficient hybrid algorithm for resource-constrained project scheduling
    • 10.1016/j.ins.2009.11.044
    • Chen, W., Shi, Y. J., Teng, H. F., Lan, X. P., and, Hu, L. C. (2010). " An efficient hybrid algorithm for resource-constrained project scheduling." Inf. Sci. ISIJBC 0020-0255, 180 (6), 1031-1039. 10.1016/j.ins.2009.11.044
    • (2010) Inf. Sci. ISIJBC 0020-0255 , vol.180 , Issue.6 , pp. 1031-1039
    • Chen, W.1    Shi, Y.J.2    Teng, H.F.3    Lan, X.P.4    Hu, L.C.5
  • 12
    • 73349109790 scopus 로고    scopus 로고
    • Scheduling resource-constrained projects with ant colony optimization artificial agents
    • 10.1061/(ASCE)0887-3801(2010)24:1(45)
    • Christodoulou, S. (2010). " Scheduling resource-constrained projects with ant colony optimization artificial agents." J. Comput. Civ. Eng. JCCEE5 0887-3801, 24 (1), 45-55. 10.1061/(ASCE)0887-3801(2010)24:1(45)
    • (2010) J. Comput. Civ. Eng. JCCEE5 0887-3801 , vol.24 , Issue.1 , pp. 45-55
    • Christodoulou, S.1
  • 13
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • 10.1287/mnsc.38.12.1803
    • Demeulemeester, E., and, Herrolen, W. (1992). " A branch-and-bound procedure for the multiple resource-constrained project scheduling problem." Manage. Sci. MSCIAM 0025-1909, 38 (12), 1803-1818. 10.1287/mnsc.38.12.1803
    • (1992) Manage. Sci. MSCIAM 0025-1909 , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herrolen, W.2
  • 15
    • 0033084695 scopus 로고    scopus 로고
    • Ant algorithms for discrete optimization
    • 10.1162/106454699568728
    • Dorigo, M., Di, Caro, G., and, Gambardella, L. M. (1999). " Ant algorithms for discrete optimization." Artificial Life ARLIEY 1064-5462, 5 (2), 137-172. 10.1162/106454699568728
    • (1999) Di. Artificial Life ARLIEY 1064-5462 , vol.5 , Issue.2 , pp. 137-172
    • Dorigo, M.1    Caro, G.2    Gambardella, L.M.3
  • 16
    • 0031122887 scopus 로고    scopus 로고
    • Ant colony system: A cooperative learning approach to the traveling salesman problem
    • 10.1109/4235.585892
    • Dorigo, M., and, Gambardella, L. M. (1997). " Ant colony system: A cooperative learning approach to the traveling salesman problem." IEEE Trans. Evol. Comput. 1089-778X, 1 (1), 53-66. 10.1109/4235.585892
    • (1997) IEEE Trans. Evol. Comput. 1089-778X , vol.1 , Issue.1 , pp. 53-66
    • Dorigo, M.1    Gambardella, L.M.2
  • 17
    • 0030082551 scopus 로고    scopus 로고
    • Ant system: Optimization by a colony of cooperating agents
    • 10.1109/3477.484436
    • Dorigo, M., Maniezzo, V., and, Colorni, A. (1996). " Ant system: Optimization by a colony of cooperating agents." IEEE Trans. Syst. Man Cybern. 1083-4419, 26 (1), 29-41. 10.1109/3477.484436
    • (1996) IEEE Trans. Syst. Man Cybern. 1083-4419 , vol.26 , Issue.1 , pp. 29-41
    • Dorigo, M.1    Maniezzo, V.2    Colorni, A.3
  • 18
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • 10.1080/07408179308964317
    • Drexl, A., and, Grünewald, J. (1993). " Nonpreemptive multi-mode resource-constrained project scheduling." IIE Trans. IIETDM 0740-817X, 25 (5), 74-81. 10.1080/07408179308964317
    • (1993) IIE Trans. IIETDM 0740-817X , vol.25 , Issue.5 , pp. 74-81
    • Drexl, A.1    Grünewald, J.2
  • 19
    • 77955569892 scopus 로고    scopus 로고
    • Improved ant colony optimization algorithms for determining project critical paths
    • 10.1016/j.autcon.2010.02.012
    • Duan, Q., and, Liao, T. W. (2010). " Improved ant colony optimization algorithms for determining project critical paths." Autom. Constr. AUCOES 0926-5805, 19 (6), 676-693. 10.1016/j.autcon.2010.02.012
    • (2010) Autom. Constr. AUCOES 0926-5805 , vol.19 , Issue.6 , pp. 676-693
    • Duan, Q.1    Liao, T.W.2
  • 21
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • 10.1002/(SICI)1520-6750(199810)45:7<733: AID-NAV5>3.0.CO;2-C
    • Hartmann, S. (1998). " A competitive genetic algorithm for resource-constrained project scheduling." Nav. Res. Logistics NRLOEP 1520-6750, 45 (7), 733-750. 10.1002/(SICI)1520-6750(199810)45:7<733::AID- NAV5>3.0.CO;2-C
    • (1998) Nav. Res. Logistics NRLOEP 1520-6750 , vol.45 , Issue.7 , pp. 733-750
    • Hartmann, S.1
  • 22
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • 10.1023/A:1010902015091
    • Hartmann, S. (2001). " Project scheduling with multiple modes: A genetic algorithm." Ann. Oper. Res. AOREEV 0254-5330, 102 (1-4), 111-135. 10.1023/A:1010902015091
    • (2001) Ann. Oper. Res. AOREEV 0254-5330 , vol.102 , Issue.14 , pp. 111-135
    • Hartmann, S.1
  • 23
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • 10.1002/(SICI)1097-0037(199812)32:4<283: AID-NET5>3.0.CO;2-I
    • Hartmann, S., and, Drexl, A. (1998). " Project scheduling with multiple modes: A comparison of exact algorithms." Networks NTWKAA 1097-0037, 32 (4), 283-297. 10.1002/(SICI)1097-0037(199812)32:4<283::AID- NET5>3.0.CO;2-I
    • (1998) Networks NTWKAA 1097-0037 , vol.32 , Issue.4 , pp. 283-297
    • Hartmann, S.1    Drexl, A.2
  • 24
    • 34548613299 scopus 로고    scopus 로고
    • Ant colony optimization combined with taboo search for the job shop scheduling problem
    • 10.1016/j.cor.2006.07.003
    • Huang, K. L., and, Liao, C. J. (2008). " Ant colony optimization combined with taboo search for the job shop scheduling problem." Comput. Oper. Res. CMORAP 0305-0548, 35 (4), 1030-1046. 10.1016/j.cor.2006.07.003
    • (2008) Comput. Oper. Res. CMORAP 0305-0548 , vol.35 , Issue.4 , pp. 1030-1046
    • Huang, K.L.1    Liao, C.J.2
  • 25
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • 10.1016/j.amc.2007.04.096
    • Jarboui, B., Damak, N., Siarry, P., and, Rebai, A. (2008). " A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems." Appl. Math. Comput. AMHCBQ 0096-3003, 195 (1), 299-308. 10.1016/j.amc.2007.04.096
    • (2008) Appl. Math. Comput. AMHCBQ 0096-3003 , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 26
    • 0034544454 scopus 로고    scopus 로고
    • Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
    • 10.1016/S0377-2217(99)00347-1
    • Klein, R. (2000). " Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects." Eur. J. Oper. Res. EJORDT 0377-2217, 127 (3), 619-638. 10.1016/S0377-2217(99)00347-1
    • (2000) Eur. J. Oper. Res. EJORDT 0377-2217 , vol.127 , Issue.3 , pp. 619-638
    • Klein, R.1
  • 27
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • 10.1016/0377-2217(95)00357-6
    • Kolisch, R. (1996). " Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation." Eur. J. Oper. Res. EJORDT 0377-2217, 90 (2), 320-333. 10.1016/0377-2217(95)00357-6
    • (1996) Eur. J. Oper. Res. EJORDT 0377-2217 , vol.90 , Issue.2 , pp. 320-333
    • Kolisch, R.1
  • 28
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • 10.1080/07408179708966417
    • Kolisch, R., and, Drexl, A. (1997). " Local search for nonpreemptive multi-mode resource-constrained project scheduling." IIE Trans. IIETDM 0740-817X, 29 (11), 987-999. 10.1080/07408179708966417
    • (1997) IIE Trans. IIETDM 0740-817X , vol.29 , Issue.11 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 29
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • 10.1109/TEVC.2002.802450
    • Merkle, D., Middendorf, M., and, Schmeck, H. (2002). " Ant colony optimization for resource-constrained project scheduling." IEEE Trans. Evol. Comput. 1089-778X, 6 (4), 333-346. 10.1109/TEVC.2002.802450
    • (2002) IEEE Trans. Evol. Comput. 1089-778X , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 30
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • 10.1061/(ASCE)0733-9364(1993)119:4(681)
    • Moselhi, O., and El-, Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization." J. Constr. Eng. Manage. JCEMD4 0733-9364, 119 (4), 681-697. 10.1061/(ASCE)0733-9364(1993)119:4(681)
    • (1993) El-. J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.1    Rayes, K.2
  • 31
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource-constrained scheduling problems
    • Slowinski, R. and Weglarz, J. W. eds. Elsevier, Amsterdam
    • Patterson, J. H., Slowinski, R., Talbot, F. B., and, Weglarz, J. W. (1989). " An algorithm for a general class of precedence and resource-constrained scheduling problems." Advances in project scheduling, Slowinski, R., and Weglarz, J. W., eds., Elsevier, Amsterdam, 3-28.
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.W.4
  • 32
    • 70349276753 scopus 로고    scopus 로고
    • A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
    • 10.1016/j.ejor.2009.03.034
    • Peteghem, V. V., and, Vanhoucke, M. (2010). " A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem." Eur. J. Oper. Res. EJORDT 0377-2217, 201 (2), 409-418. 10.1016/j.ejor.2009.03.034
    • (2010) Eur. J. Oper. Res. EJORDT 0377-2217 , vol.201 , Issue.2 , pp. 409-418
    • Peteghem, V.V.1    Vanhoucke, M.2
  • 33
    • 0001150453 scopus 로고
    • DSS for multiobjective project scheduling subject to multiple-category resource constraints
    • 10.1016/0377-2217(94)90353-0
    • Slowinski, R., Soniewicki, B., and, Weglarz, J. (1994). " DSS for multiobjective project scheduling subject to multiple-category resource constraints." Eur. J. Oper. Res. EJORDT 0377-2217, 79 (2), 220-229. 10.1016/0377-2217(94)90353-0
    • (1994) Eur. J. Oper. Res. EJORDT 0377-2217 , vol.79 , Issue.2 , pp. 220-229
    • Slowinski, R.1    Soniewicki, B.2    Weglarz, J.3
  • 34
    • 0027302081 scopus 로고
    • Hierarchical models for multi-project planning and scheduling
    • 10.1016/0377-2217(93)90185-P
    • Speranza, M. G., and, Vercellis, C. (1993). " Hierarchical models for multi-project planning and scheduling." Eur. J. Oper. Res. EJORDT 0377-2217, 64 (2), 312-325. 10.1016/0377-2217(93)90185-P
    • (1993) Eur. J. Oper. Res. EJORDT 0377-2217 , vol.64 , Issue.2 , pp. 312-325
    • Speranza, M.G.1    Vercellis, C.2
  • 35
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    • 10.1016/S0377-2217(97)00348-2
    • Sprecher, A., and, Drexl, A. (1998). " Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm." Eur. J. Oper. Res. EJORDT 0377-2217, 107 (2), 431-450. 10.1016/S0377-2217(97)00348-2
    • (1998) Eur. J. Oper. Res. EJORDT 0377-2217 , vol.107 , Issue.2 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 37
    • 84974870375 scopus 로고
    • Heuristic performance and network resource characteristics in resource constrained project scheduling
    • Ulusoy, G, and, Ozdamar, L. (1989). " Heuristic performance and network resource characteristics in resource constrained project scheduling." J. Opl. Res. Soc. 0160-5682, 40 (12), 1145-1152 10.1057/jors.1989.196.
    • (1989) J. Opl. Res. Soc. 0160-5682, 1145-1152 10.1057/jors.1989.196 , vol.40 , Issue.12
    • Ulusoy, G.1    Ozdamar, L.2
  • 39
    • 70350574410 scopus 로고    scopus 로고
    • A genetic ant colony optimization system (GenANT) for quadratic assignment problems
    • 10.1504/IJMOR.2009.026277
    • Wong, K. Y., and, See, P. C. (2009). " A genetic ant colony optimization system (GenANT) for quadratic assignment problems." Int. J. Math. Oper. Res. 1757-5850, 1 (4), 456-475. 10.1504/IJMOR.2009.026277
    • (2009) Int. J. Math. Oper. Res. 1757-5850 , vol.1 , Issue.4 , pp. 456-475
    • Wong, K.Y.1    See, P.C.2
  • 40
    • 33645992444 scopus 로고    scopus 로고
    • Multi-mode project scheduling based on particle swarm optimization
    • 10.1111/j.1467-8667.2005.00420.x
    • Zhang, H., Tam, C. M., and, Li, H. (2006). " Multi-mode project scheduling based on particle swarm optimization." Comput. Aided Civ. Infrastruct. Eng. CCIEFR 1093-9687, 21 (2), 93-103. 10.1111/j.1467-8667.2005. 00420.x
    • (2006) Comput. Aided Civ. Infrastruct. Eng. CCIEFR 1093-9687 , vol.21 , Issue.2 , pp. 93-103
    • Zhang, H.1    Tam, C.M.2    Li, H.3
  • 41
    • 0035479302 scopus 로고    scopus 로고
    • Resource allocation heuristic in construction simulation
    • 10.1080/01446190110063473
    • Zhang, H., Tam, C. M., and, Shi, J. J. (2001). " Resource allocation heuristic in construction simulation." Constr. Manage. Econ. 0144-6193, 19 (6), 643-651. 10.1080/01446190110063473
    • (2001) Constr. Manage. Econ. 0144-6193 , vol.19 , Issue.6 , pp. 643-651
    • Zhang, H.1    Tam, C.M.2    Shi, J.J.3
  • 44
    • 33748521972 scopus 로고    scopus 로고
    • A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
    • 10.1287/ijoc.1040.0121
    • Zhu, G., Bard, J., and, Tu, G. (2006). " A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem." INFORMS J. Comput. 1091-9856, 18 (3), 377-390. 10.1287/ijoc.1040.0121
    • (2006) INFORMS J. Comput. 1091-9856 , vol.18 , Issue.3 , pp. 377-390
    • Zhu, G.1    Bard, J.2    Tu, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.