메뉴 건너뛰기




Volumn 130, Issue 4, 2004, Pages 534-541

Dynamic layout of construction temporary facilities considering safety

Author keywords

Construction management; Construction site accidents; Safety; Temporary structures

Indexed keywords

ACCIDENT PREVENTION; CONTROL FACILITIES; COSTS; CRANES; CRITICAL PATH ANALYSIS; SITE SELECTION; SOFTWARE PROTOTYPING; STRATEGIC PLANNING;

EID: 13944281386     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:4(534)     Document Type: Article
Times cited : (139)

References (24)
  • 1
    • 3242837854 scopus 로고    scopus 로고
    • Importance of safety considerations in site layout and organization
    • Anumba, C., and Bishop, G. (1997). "Importance of safety considerations in site layout and organization." Can. J. Civ. Eng., 24(2), 229-236.
    • (1997) Can. J. Civ. Eng. , vol.24 , Issue.2 , pp. 229-236
    • Anumba, C.1    Bishop, G.2
  • 4
    • 5244248406 scopus 로고    scopus 로고
    • ArcSite: Enhanced GIS for construction site layout
    • Cheng, M. Y., and O'Connor, J. T. (1996). "ArcSite: Enhanced GIS for construction site layout." J. Constr. Eng. Manage., 122(4), 329-336.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 329-336
    • Cheng, M.Y.1    O'Connor, J.T.2
  • 6
    • 0043278302 scopus 로고    scopus 로고
    • Costs of accidents and injuries to the construction industry
    • Everett, J. G., and Frank, P. B. (1996). "Costs of accidents and injuries to the construction industry." J. Constr. Eng. Manage., 122(2), 158-164.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 158-164
    • Everett, J.G.1    Frank, P.B.2
  • 9
    • 0033156961 scopus 로고    scopus 로고
    • EvoSite: Evolution-based model for site layout planning
    • Hegazy, T., and Elbeltagi, E. (1999). "EvoSite: Evolution-based model for site layout planning." J. Comput. Civ. Eng., 13(3), 198-206.
    • (1999) J. Comput. Civ. Eng. , vol.13 , Issue.3 , pp. 198-206
    • Hegazy, T.1    Elbeltagi, E.2
  • 11
    • 0013199180 scopus 로고    scopus 로고
    • Identifying root causes of construction accidents
    • Hinze, J., Pederson, C., and Fredley, J. (1998). "Identifying root causes of construction accidents." J. Constr. Eng. Manage., 124(1), 67-71.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 67-71
    • Hinze, J.1    Pederson, C.2    Fredley, J.3
  • 13
    • 0000575151 scopus 로고    scopus 로고
    • Integrating safety and health performance into construction CPM
    • Kartam, N. (1997). "Integrating safety and health performance into construction CPM." J. Constr. Eng. Manage., 123(2), 121-126.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 121-126
    • Kartam, N.1
  • 14
    • 0023553923 scopus 로고
    • Computer-aided facility layout selection (CAFLAS) with applications to multiple criteria manufacturing planning problem
    • Malakooti, B. (1987). "Computer-aided facility layout selection (CAFLAS) with applications to multiple criteria manufacturing planning problem." Large Scale Syst., 12(2), 109-123.
    • (1987) Large Scale Syst. , vol.12 , Issue.2 , pp. 109-123
    • Malakooti, B.1
  • 15
    • 0041996056 scopus 로고
    • U.S. Department of Labor, Washington, D.C.
    • Occupational Safety and Health Administration (OSHA). (1990, 1998). Analysis of construction fatalities, U.S. Department of Labor, Washington, D.C.
    • (1990) Analysis of Construction Fatalities
  • 16
    • 0032649287 scopus 로고    scopus 로고
    • Factors affecting safety performance on construction sites
    • Sawacha, E., Naoum, S., and Fong, D. (1999). "Factors affecting safety performance on construction sites." Int. J. Proj. Manage., 17(5), 309-315.
    • (1999) Int. J. Proj. Manage. , vol.17 , Issue.5 , pp. 309-315
    • Sawacha, E.1    Naoum, S.2    Fong, D.3
  • 17
    • 3242833468 scopus 로고
    • Safety performance goals - The planning process
    • Shechan, D. B. (1992). "Safety performance goals - The planning process." Occup. Hazards, 54(11), 40-43.
    • (1992) Occup. Hazards , vol.54 , Issue.11 , pp. 40-43
    • Shechan, D.B.1
  • 18
    • 3242829126 scopus 로고
    • No falling back
    • Stokdyk J. (1994). "No falling back." Building, June 3, 38-39.
    • (1994) Building , Issue.JUNE 3 , pp. 38-39
    • Stokdyk, J.1
  • 19
    • 0026914052 scopus 로고
    • Site layout modeling: How can artificial intelligence help?
    • Tommelein, I. D., Levitt, R. E., and Hayes-Roth, B. (1992). "Site layout modeling: How can artificial intelligence help?" J. Constr. Eng. Manage., 118(3), 594-611.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 594-611
    • Tommelein, I.D.1    Levitt, R.E.2    Hayes-Roth, B.3
  • 20
    • 0027607458 scopus 로고
    • Interactive dynamic layout planning
    • Tommelein, I. D., and Zouein, P. P. (1993). "Interactive dynamic layout planning." J. Constr. Eng. Manage., 119(2), 266-287.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.2 , pp. 266-287
    • Tommelein, I.D.1    Zouein, P.P.2
  • 22
    • 0033705227 scopus 로고    scopus 로고
    • Safety management: Problems encountered and recommended solutions
    • Wilson, J. M., Jr., and Koehn, E. (2000). "Safety management: Problems encountered and recommended solutions." J. Constr. Eng. Manage., 126(1), 77-79.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.1 , pp. 77-79
    • Wilson Jr., J.M.1    Koehn, E.2
  • 23
    • 2342444431 scopus 로고    scopus 로고
    • Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
    • Zouein, P. P., Harmanani, H., and Hajar, A. (2002). "Genetic algorithm for solving site layout problem with unequal-size and constrained facilities." J. Comput. Civ. Eng., 16(2), 143-151.
    • (2002) J. Comput. Civ. Eng. , vol.16 , Issue.2 , pp. 143-151
    • Zouein, P.P.1    Harmanani, H.2    Hajar, A.3
  • 24
    • 0033313625 scopus 로고    scopus 로고
    • Dynamic layout planning using a hybrid incremental solution method
    • Zouein, P. P., and Tommelein, I. D. (1999). "Dynamic layout planning using a hybrid incremental solution method." J. Constr. Eng. Manage., 125(6), 400-408.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 400-408
    • Zouein, P.P.1    Tommelein, I.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.