메뉴 건너뛰기




Volumn 21, Issue 7, 2006, Pages 498-513

Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies

Author keywords

[No Author keywords available]

Indexed keywords

DECISION SUPPORT SYSTEMS; MATHEMATICAL MODELS; PLANNING; PROJECT MANAGEMENT; SCHEDULING;

EID: 33746778753     PISSN: 10939687     EISSN: 14678667     Source Type: Journal    
DOI: 10.1111/j.1467-8667.2006.00454.x     Document Type: Conference Paper
Times cited : (85)

References (21)
  • 2
    • 33746774107 scopus 로고    scopus 로고
    • Representing work space generically in construction method models
    • CIFE Working Paper No. 57 Stanford University
    • Akinci, B., Fischer, M., Kunz, J. & Levvitt, R. (2000b), Representing work space generically in construction method models, CIFE Working Paper No. 57, Stanford University.
    • (2000)
    • Akinci, B.1    Fischer, M.2    Kunz, J.3    Levvitt, R.4
  • 3
    • 1842842338 scopus 로고    scopus 로고
    • Formalisation and automation of time-space conflict analysis
    • CIFE Working Paper No. 59 Stanford University
    • Akinci, B., Fischer, M., Levvitt, R. & Carlson, R. (2000a), Formalisation and automation of time-space conflict analysis, CIFE Working Paper No. 59, Stanford University.
    • (2000)
    • Akinci, B.1    Fischer, M.2    Levvitt, R.3    Carlson, R.4
  • 4
    • 0035392411 scopus 로고    scopus 로고
    • GIS-based cost estimates integrating with material layout planning
    • July/August
    • Cheng, M. Y. & Yang, S. Y. (2001), GIS-based cost estimates integrating with material layout planning, Journal of Construction Engineering and Management, July/August, 291-99.
    • (2001) Journal of Construction Engineering and Management , pp. 291-299
    • Cheng, M.Y.1    Yang, S.Y.2
  • 6
    • 0037332742 scopus 로고    scopus 로고
    • Development of an integrated information resource base for 4D/VR construction processes simulation
    • Dawood, N. N., Sriprasert, E. & Mallasi, Z. (2002), Development of an integrated information resource base for 4D/VR construction processes simulation, Automation in Construction Journal, 12 (2), 123-33.
    • (2002) Automation in Construction Journal , vol.12 , Issue.2 , pp. 123-133
    • Dawood, N.N.1    Sriprasert, E.2    Mallasi, Z.3
  • 8
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • July/August
    • Guo, S. (2002), Identification and resolution of work space conflicts in building construction, Journal of Construction Engineering and Management, July/August, 287-95.
    • (2002) Journal of Construction Engineering and Management , pp. 287-295
    • Guo, S.1
  • 9
    • 1442311971 scopus 로고    scopus 로고
    • Technology opportunities and potential for the virtual construction site: Emerging research initiatives
    • University of Wolverhampton, Wolverhampton, UK
    • Hessom, D. & Mahdjoubi, L. (2002), Technology opportunities and potential for the virtual construction site: Emerging research initiatives, VIRCON Task Three Technical Report, Vol. 1, University of Wolverhampton, Wolverhampton, UK.
    • (2002) VIRCON Task Three Technical Report , vol.1
    • Hessom, D.1    Mahdjoubi, L.2
  • 12
    • 1442360914 scopus 로고    scopus 로고
    • Assessing space criticality in sequencing and identifying execution patterns for construction activities using VR visualisations
    • Edinburgh University, UK
    • Mallasi, Z. and Dawood, N. (2001), Assessing space criticality in sequencing and identifying execution patterns for construction activities using VR visualisations, ARCOM doctoral research workshop: Simulation and modelling in construction, Edinburgh University, UK, 22-27.
    • (2001) ARCOM Doctoral Research Workshop: Simulation and Modelling in Construction , pp. 22-27
    • Mallasi, Z.1    Dawood, N.2
  • 13
    • 33746369824 scopus 로고    scopus 로고
    • Registering space requirements of construction operations using site-PECASO model
    • Aarhus School of Architecture, Denmark
    • Mallasi, Z. & Dawood, N. (2002), Registering space requirements of construction operations using site-PECASO model, in Proceedings of CIB w78 2002 Conference on Distributing Knowledge in Buildings, Aarhus School of Architecture, Denmark, 2, 83-90.
    • (2002) Proceedings of CIB W78 2002 Conference on Distributing Knowledge in Buildings , vol.2 , pp. 83-90
    • Mallasi, Z.1    Dawood, N.2
  • 15
    • 0029470095 scopus 로고
    • Pattern of construction space utilisation in multi-story buildings
    • Riley, D. & Sanvido, V. (1995), Pattern of construction space utilisation in multi-story buildings, Journal of Construction Engineering and Management, 121(4), 464-73.
    • (1995) Journal of Construction Engineering and Management , vol.121 , Issue.4 , pp. 464-473
    • Riley, D.1    Sanvido, V.2
  • 18
    • 33746734751 scopus 로고
    • An automated project planner
    • PhD Thesis Department of Civil Engineering, University of Nottingham
    • Sirajuddin, A. M. (1991), An automated project planner, PhD Thesis, Department of Civil Engineering, University of Nottingham.
    • (1991)
    • Sirajuddin, A.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.