Optimal resource leveling using non-serial dynamic programming
-
0377-2217, 10.1016/0377-2217(94)90380-8
-
Bandelloni, M., Tucci, M., and Rinaldi, R. (1994). Optimal resource leveling using non-serial dynamic programming.. Eur. J. Oper. Res. 0377-2217, 78 (2), 162-177. 10.1016/0377-2217(94)90380-8
-
(1994)
Eur. J. Oper. Res.
, vol.78
, Issue.2
, pp. 162-177
-
-
Bandelloni, M.1
Tucci, M.2
Rinaldi, R.3
-
2
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). Construction resource scheduling with genetic algorithms.. J. Constr. Eng. Manage. 0733-9364, 122 (2), 125-132. 10.1061/(ASCE)0733-9364(1996)122:2(125) (Pubitemid 126567089)
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.-T.1
Chua, D.K.H.2
Kannan, G.3
-
3
-
-
63549149518
-
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
-
0926-5805, 10.1016/j.autcon.2008.10.007
-
Chen, P., and Shahandashti, S. M. (2009). Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints.. Autom. Constr. 0926-5805, 18 (4), 434-443. 10.1016/j.autcon.2008. 10.007
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 434-443
-
-
Chen, P.1
Shahandashti, S.M.2
-
4
-
-
0001195356
-
Scheduling with co-evolving resource availability profiles
-
0733-9364, 10.1061/(ASCE)0733-9364(1989)115:2(302)
-
Chua, D. K. H., Chan, W. T., and Kannan, G. (1996). Scheduling with co-evolving resource availability profiles.. J. Civ. Eng. Environ. Sys. 0733-9364, 115 (2), 302-316. 10.1061/(ASCE)0733-9364(1989)115:2(302)
-
(1996)
J. Civ. Eng. Environ. Sys.
, vol.115
, Issue.2
, pp. 302-316
-
-
Chua, D.K.H.1
Chan, W.T.2
Kannan, G.3
-
5
-
-
70350051317
-
Optimizing resource leveling in construction projects
-
0733-9364, 10.1061/(ASCE)CO.1943-7862.0000097
-
El-Rayes, K., and Jun, D. H. (2009). Optimizing resource leveling in construction projects.. J. Constr. Eng. Manage. 0733-9364, 135 (11), 1172-1180. 10.1061/(ASCE)CO.1943-7862.0000097
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.11
, pp. 1172-1180
-
-
El-Rayes, K.1
Jun, D.H.2
-
7
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
0733-9364, 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
Hegazy, T. (1999). Optimization of resource allocation and leveling using genetic algorithms.. J. Constr. Eng. Manage. 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
8
-
-
8644243272
-
-
J. F. Muth, and G. L. Thompson, eds., Industrial Scheduling, Prentice Hall, Englewood Cliffs, NJ
-
Kelly, J. E. (1963). The critical-path method: Resource planning and scheduling, J. F. Muth, and, G. L. Thompson, eds., Industrial Scheduling, Prentice Hall, Englewood Cliffs, NJ.
-
(1963)
The Critical-path Method: Resource Planning and Scheduling
-
-
Kelly, J.E.1
-
9
-
-
54249088030
-
Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling
-
0733-9364, 10.1061/(ASCE)0733-9364(2008)134:11(904)
-
Kim, J., and Ellis, J. (2008). Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling.. J. Constr. Eng. Manage. 0733-9364, 134 (11), 904-913. 10.1061/(ASCE)0733-9364(2008)134:11(904)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.11
, pp. 904-913
-
-
Kim, J.1
Ellis, J.2
-
10
-
-
0030151930
-
Search heuristics for resource constrained project scheduling
-
Lee, J., and Kim, Y. (1996). Search heuristics for resource constrained project scheduling.. J. Oper. Res. Soc. 0160-5682, 47 (5), 678-689. 10.1057/jors.1996.79 (Pubitemid 126590745)
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.-K.1
Kim, Y.-D.2
-
11
-
-
84855945097
-
A genetic-algorithm-based resource-constrained construction scheduling system
-
0733-9364, 10.1061/(ASCE)0733-9364(1998)124:3(232)
-
Leu, S., and Yang, C. (1999). A genetic-algorithm-based resource-constrained construction scheduling system.. Constr. Manage. Econ. 0733-9364, 124 (3), 232-244. 10.1061/(ASCE)0733-9364(1998)124:3(232)
-
(1999)
Constr. Manage. Econ.
, vol.124
, Issue.3
, pp. 232-244
-
-
Leu, S.1
Yang, C.2
-
12
-
-
0032070635
-
An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
-
Mingozzi, A., Maniezzo, V., Ricciardelli, S., and Bianco, L. (1998). An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation.. Manage. Sci. 0025-1909, 44 (5), 714-729. 10.1287/mnsc.44.5.714 (Pubitemid 128596875)
-
(1998)
Management Science
, vol.44
, Issue.5
, pp. 714-729
-
-
Mingozzi, A.1
Maniezzo, V.2
Ricciardelli, S.3
Bianco, L.4
-
13
-
-
0343370619
-
-
Wiley-Interscience, New York
-
Popescu, C., and Charoenngam, C. (1995). Project planning, scheduling, and control in construction: An encyclopedia of terms and applications, Wiley-Interscience, New York.
-
(1995)
Project Planning, Scheduling, and Control in Construction: An Encyclopedia of Terms and Applications
-
-
Popescu, C.1
Charoenngam, C.2
-
14
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
-
Senouci, A. B., and Eldin, N. N. (2004). Use of genetic algorithms in resource scheduling of construction projects.. J. Constr. Eng. Manage. 0733-9364, 130 (6), 869-877. 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
15
-
-
13944282626
-
Binary resource leveling model: Activity splitting allowed
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(887)
-
Son, J., and Mattila, K. G. (2004). Binary resource leveling model: Activity splitting allowed.. J. Constr. Eng. Manage. 0733-9364, 130 (6), 887-894. 10.1061/(ASCE)0733-9364(2004)130:6(887) (Pubitemid 40265322)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 887-894
-
-
Son, J.1
Mattila, K.G.2
-
16
-
-
0032633457
-
Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach
-
0733-9364, 10.1061/(ASCE)0733-9364(1999)125:1(23)
-
Son, J., and Skibniewski, M. J. (1999). Multiheuristic approach for resource leveling problem in construction engineering: hybrid approach.. J. Constr. Eng. Manage. 0733-9364, 125 (1), 23-31. 10.1061/(ASCE)0733-9364(1999) 125:1(23)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 23-31
-
-
Son, J.1
Skibniewski, M.J.2
-
18
-
-
32944459555
-
Permutation-based particle swarm optimization for resource-constrained project scheduling
-
DOI 10.1061/(ASCE)0887-3801(2006)20:2(141)
-
Zhang, H., Li, H., and Tam, C. M. (2006). Permutation-based particle swarm optimization for resource-constrained project scheduling.. J. Comput. Civ. Eng. 0887-3801, 20 (2), 141-149. 10.1061/(ASCE)0887-3801(2006)20:2(141) (Pubitemid 43260088)
-
(2006)
Journal of Computing in Civil Engineering
, vol.20
, Issue.2
, pp. 141-149
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
|