1
-
-
0004099797
-
-
PhD thesis, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
Aalami, F. (1998). "Using method models to generate 4D production models." PhD thesis, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
(1998)
Using Method Models to Generate 4D Production Models
-
-
Aalami, F.1
-
2
-
-
13944260893
-
-
PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
Akinci, B. (2000). "Automatic generation of work spaces and analysis of time-space conflicts at construction sites." PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
(2000)
Automatic Generation of Work Spaces and Analysis of Time-space Conflicts at Construction Sites
-
-
Akinci, B.1
-
4
-
-
84860079233
-
-
Ballard, G. (1997). "The last planner." (http://www.ce. berkeley.edu/~tommelein/LastPlanner.html).
-
(1997)
The Last Planner
-
-
Ballard, G.1
-
5
-
-
84860075958
-
-
March 27, 2001
-
Bentley Systems. (2001). "Bentley Schedule Simulator rel. 4.0" (http://www.bentley.com/products/simulator/) (March 27, 2001).
-
(2001)
Bentley Schedule Simulator Rel. 4.0
-
-
-
6
-
-
0029714192
-
Adaptation of a layout design system to a new domain: Construction site layouts
-
ASCE, New York
-
Choi, B., and Flemming, U. (1996). "Adaptation of a layout design system to a new domain: Construction site layouts." Computing in civil engineering, ASCE, New York, 711-717.
-
(1996)
Computing in Civil Engineering
, pp. 711-717
-
-
Choi, B.1
Flemming, U.2
-
7
-
-
0032667279
-
WorkPlan: Constraint-based database for work package scheduling
-
Choo, H. Y., Tommelein, I. D., Ballard, G., and Zabelle, T. R. (1999). "WorkPlan: Constraint-based database for work package scheduling." J. Constr. Eng. Manage., 125(3), 151-160.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 151-160
-
-
Choo, H.Y.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, T.R.4
-
8
-
-
5944224517
-
Reference space for spatial inference in text understanding
-
C. Freksa, C. Habel, and K. Wender, eds., Springer, Berlin
-
Claus, B., et al. (1998). "Reference space for spatial inference in text understanding." Spatial cognition: An interdisciplinary approach to representing and processing spatial knowledge, C. Freksa, C. Habel, and K. Wender, eds., Springer, Berlin, 241-266.
-
(1998)
Spatial Cognition: An Interdisciplinary Approach to Representing and Processing Spatial Knowledge
, pp. 241-266
-
-
Claus, B.1
-
9
-
-
0002604591
-
Four-dimensional modeling in design and construction
-
Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
Collier, E., and Fischer, M. (1995). "Four-dimensional modeling in design and construction." Tech. Rep. 101, Center for Integrated Facility Engineering, Stanford Univ., Stanford, Calif.
-
(1995)
Tech. Rep.
, vol.101
-
-
Collier, E.1
Fischer, M.2
-
11
-
-
84860083747
-
Concepts of space in computer based product modeling and design
-
Vienna
-
Ekholm, A., and Fridqvist, S. (1997). "Concepts of space in computer based product modeling and design." 15th ECAADE Conference, Vienna (http://info.tuwien.ac.at/ecaade/proc/ekholm/ekholm.html).
-
(1997)
15th ECAADE Conference
-
-
Ekholm, A.1
Fridqvist, S.2
-
13
-
-
0033156961
-
EvoSite: Evolution-based model for site layout planning
-
Hegazy, T., and Elbeltagi, E. (1999). "EvoSite: Evolution-based model for site layout planning." J. Comput. Civ. Eng., 13(3), 198-206.
-
(1999)
J. Comput. Civ. Eng.
, vol.13
, Issue.3
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
14
-
-
13944279584
-
An integrated facility construction process model
-
CIC Research Program, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
Hetrick, M., and Khayyal, S. A. (1987). "An integrated facility construction process model." Tech. Rep. 5, CIC Research Program, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
(1987)
Tech. Rep.
, vol.5
-
-
Hetrick, M.1
Khayyal, S.A.2
-
15
-
-
1642304896
-
Factors affecting project success in the piping function
-
L. Alarcon, ed., Balkema, Rotterdam, The Netherlands
-
Howell, G., and Ballard, G. (1997). "Factors affecting project success in the piping function." Lean construction, L. Alarcon, ed., Balkema, Rotterdam, The Netherlands, 161-185.
-
(1997)
Lean Construction
, pp. 161-185
-
-
Howell, G.1
Ballard, G.2
-
16
-
-
13944254784
-
Industry foundation classes 2.0
-
Washington, D.C.
-
Industry Alliance for Interoperability (IAI) (1998). "Industry Foundation Classes 2.0." Specifications volumes 1-4, Washington, D.C.
-
(1998)
Specifications Volumes 1-4
-
-
-
17
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
Koo, B., and Fischer, M. (2000). "Feasibility study of 4D CAD in commercial construction." J. Constr. Eng. Manage., 126(4), 251-260.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
18
-
-
0004158431
-
-
McGraw-Hill, New York
-
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, New York.
-
(1989)
Productivity Improvement in Construction
-
-
Oglesby, C.H.1
Parker, H.W.2
Howell, G.A.3
-
20
-
-
0005390052
-
-
PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
Riley, D. (1994). "Modeling the space behavior of construction activities." PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
(1994)
Modeling the Space Behavior of Construction Activities
-
-
Riley, D.1
-
21
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction
-
ASCE, New York
-
Riley, D., and Sanvido, V. (1997). "Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction." 5th Construction Congress, ASCE, New York, 102-109.
-
(1997)
5th Construction Congress
, pp. 102-109
-
-
Riley, D.1
Sanvido, V.2
-
22
-
-
13944266807
-
-
PTI#9003, Pennsylvania State Univ., University Park, Pa.
-
Sanders, S. R., Thomas, H. R., and Smith, G. R. (1989). "An analysis of factors affecting labor productivity in masonry construction." PTI#9003, Pennsylvania State Univ., University Park, Pa.
-
(1989)
An Analysis of Factors Affecting Labor Productivity in Masonry Construction
-
-
Sanders, S.R.1
Thomas, H.R.2
Smith, G.R.3
-
23
-
-
1642299923
-
-
PhD thesis, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
Sanvido, V. (1984). "Designing productivity management and control systems for construction projects." PhD thesis, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
(1984)
Designing Productivity Management and Control Systems for Construction Projects
-
-
Sanvido, V.1
-
25
-
-
0031630957
-
The impact of 3D visualization on construction planning
-
K. C. P. Wang, T. Adams, M. L. Maher, and A. Songer, eds., ASCE, Reston, Boston
-
Songer, A. D., Diekmann, J., and Al-Rasheed, K. (1998). "The impact of 3D visualization on construction planning." Computing in civil engineering, K. C. P. Wang, T. Adams, M. L. Maher, and A. Songer, eds., ASCE, Reston, Boston, 321-329.
-
(1998)
Computing in Civil Engineering
, pp. 321-329
-
-
Songer, A.D.1
Diekmann, J.2
Al-Rasheed, K.3
-
26
-
-
0032689361
-
Into the fourth dimension
-
Staub, S., Fischer, M., and Spradlin, M. (1999). "Into the fourth dimension." Civ. Eng., 69(5), 44-47.
-
(1999)
Civ. Eng.
, vol.69
, Issue.5
, pp. 44-47
-
-
Staub, S.1
Fischer, M.2
Spradlin, M.3
-
27
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
Thabet, W. Y., and Beliveau, Y. J. (1994). "Modeling work space to schedule repetitive floors in multistory buildings." J. Constr. Eng. Manage., 120(1), 96-116.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
28
-
-
0028396033
-
Forecasting labor productivity using factor model
-
Thomas, H. R., and Sakarcan, A. S. (1994). "Forecasting labor productivity using factor model." J. Constr. Eng. Manage., 120(1), 228-239.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 228-239
-
-
Thomas, H.R.1
Sakarcan, A.S.2
-
29
-
-
0005390622
-
Space-time characterization for resource management on construction sites
-
I. D. Tommelein, J. G. Castillo, and P. P. Zouein, eds.
-
Tommelein, I. D., Castillo, J. G., and Zouein, P. P. (1992). "Space-time characterization for resource management on construction sites." Computing in civil engineering and geographic information systems symposium, I. D. Tommelein, J. G. Castillo, and P. P. Zouein, eds. 623-630.
-
(1992)
Computing in Civil Engineering and Geographic Information Systems Symposium
, pp. 623-630
-
-
Tommelein, I.D.1
Castillo, J.G.2
Zouein, P.P.3
-
30
-
-
0026914052
-
Site layout modeling: How can artificial intelligence help?
-
Tommelein, I. D., Levitt, R. E., and Hayes-Roth, B. (1991). "Site layout modeling: How can artificial intelligence help?" J. Constr. Eng. Manage., 118(3), 594-611.
-
(1991)
J. Constr. Eng. Manage.
, vol.118
, Issue.3
, pp. 594-611
-
-
Tommelein, I.D.1
Levitt, R.E.2
Hayes-Roth, B.3
-
31
-
-
0027607458
-
Interactive dynamic layout planning
-
Tommelein, I., and Zouein, P. (1993). "Interactive dynamic layout planning." J. Constr. Eng. Manage., 119(2), 266-287.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 266-287
-
-
Tommelein, I.1
Zouein, P.2
-
32
-
-
0027151062
-
Space schedule construction
-
L. F. Cohn, ed., ASCE, New York
-
Zouein, P. P., and Tommelein, I. D. (1993). "Space schedule construction." Computing in civil and building engineering, L. F. Cohn, ed., ASCE, New York, 1770-1777.
-
(1993)
Computing in Civil and Building Engineering
, pp. 1770-1777
-
-
Zouein, P.P.1
Tommelein, I.D.2
|