-
2
-
-
0000698815
-
Batch scheduling in a two-machine flow shop with limited buffer
-
Agnetis, A., D. Pacciarelli and F. Rossi (1997). Batch scheduling in a two-machine flow shop with limited buffer, Discrete Applied Mathematics 72(3), 243-260.
-
(1997)
Discrete Applied Mathematics
, vol.72
, Issue.3
, pp. 243-260
-
-
Agnetis, A.1
Pacciarelli, D.2
Rossi, F.3
-
3
-
-
0032024071
-
An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer
-
Agnetis, A., F. Rossi and G. Gristina (1998). An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer, Naval Research Logistics 45(2), 141-164.
-
(1998)
Naval Research Logistics
, vol.45
, Issue.2
, pp. 141-164
-
-
Agnetis, A.1
Rossi, F.2
Gristina, G.3
-
5
-
-
0029301514
-
Component fixture positioning/sequencing for printed circuit board assembly with concurrent operations
-
Ahmadi, J., R. Ahmadi, H. Matsuo and D. Tirupati (1995). Component fixture positioning/sequencing for printed circuit board assembly with concurrent operations, Operations Research 43, 444-457.
-
(1995)
Operations Research
, vol.43
, pp. 444-457
-
-
Ahmadi, J.1
Ahmadi, R.2
Matsuo, H.3
Tirupati, D.4
-
7
-
-
0031189321
-
Finite-capacity schedulingbased planning for revenue-based capacity managament
-
Akkan, C. (1997). Finite-capacity schedulingbased planning for revenue-based capacity managament, European Journal of Operational Research 100, 170-179.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 170-179
-
-
Akkan, C.1
-
8
-
-
70449686075
-
Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: A case study
-
Alfieri, A. (2009). Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: A case study, International Journal of Production Research 47(18), 5129-5145.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.18
, pp. 5129-5145
-
-
Alfieri, A.1
-
9
-
-
33846316381
-
A review of interactive methods for multiobjective integer and mixed-integer programming
-
Alves, M.J. and J. Climaco (2007). A review of interactive methods for multiobjective integer and mixed-integer programming, European Journal of Operational Research 180, 99-115.
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 99-115
-
-
Alves, M.J.1
Climaco, J.2
-
11
-
-
0004047288
-
Planning and Control Systems
-
A Framework for Analysis, Division of Research, Harvard Business School, Boston
-
Anthony, R.N. (1965). Planning and Control Systems. A Framework for Analysis, Division of Research, Harvard Business School, Boston.
-
(1965)
-
-
Anthony, R.N.1
-
13
-
-
70649088049
-
Principles of Sequencing and Scheduling
-
Wiley, Hoboken, NJ
-
Baker, K.R. and D. Trietsch (2009). Principles of Sequencing and Scheduling, Wiley, Hoboken, NJ.
-
(2009)
-
-
Baker, K.R.1
Trietsch, D.2
-
14
-
-
0032686724
-
A tactical planning model for mixed-model electronics assembly operations
-
Balakrishnan, A. and F. Vanderbeck (1999). A tactical planning model for mixed-model electronics assembly operations, Operations Research 47, 395-409.
-
(1999)
Operations Research
, vol.47
, pp. 395-409
-
-
Balakrishnan, A.1
Vanderbeck, F.2
-
16
-
-
27844457069
-
Revenue management in order-driven production systems
-
Barut, S.P. and V. Sridharan (2005). Revenue management in order-driven production systems, Decision Sciences 36(2), 287-316.
-
(2005)
Decision Sciences
, vol.36
, Issue.2
, pp. 287-316
-
-
Barut, S.P.1
Sridharan, V.2
-
18
-
-
0347568237
-
How many suppliers are best? A Scheduling in Supply Chains Using Mixed Integer Programming
-
By Tadeusz Sawik # 2011 John Wiley & Sons, Inc. Published 2011 by John Wiley & Sons, Inc. 437 decision-analysis approach
-
Berger, P.D., A. Gerstenfeld and A.Z. Zeng (2004). How many suppliers are best? A Scheduling in Supply Chains Using Mixed Integer Programming. By Tadeusz Sawik # 2011 John Wiley & Sons, Inc. Published 2011 by John Wiley & Sons, Inc. 437 decision-analysis approach, Omega: The International Journal of Management Science 32(1), 9-15.
-
(2004)
Omega: The International Journal of Management Science
, vol.32
, Issue.1
, pp. 9-15
-
-
Berger, P.D.1
Gerstenfeld, A.2
Zeng, A.Z.3
-
20
-
-
0037431630
-
Rounding off the optimal solution of the economic lot size problem
-
Bertazzi, L. (2003). Rounding off the optimal solution of the economic lot size problem, International Journal of Production Economics 81-82, 385-392.
-
(2003)
International Journal of Production Economics
, vol.81-82
, pp. 385-392
-
-
Bertazzi, L.1
-
22
-
-
0029404820
-
A time window approach to simultaneous scheduling of machines and material handling system in an FMS
-
Bilge, U. and G. Ulusoy (1995). A time window approach to simultaneous scheduling of machines and material handling system in an FMS, Operations Research 43, 1058-1070.
-
(1995)
Operations Research
, vol.43
, pp. 1058-1070
-
-
Bilge, U.1
Ulusoy, G.2
-
23
-
-
0004048738
-
Scheduling in Computer and Manufacturing Systems
-
Springer, Berlin
-
Blazewicz, J., K. Ecker, G. Schmidt and J.Weglarz (1994). Scheduling in Computer and Manufacturing Systems, Springer, Berlin.
-
(1994)
-
-
Blazewicz, J.1
Ecker, K.2
Schmidt, G.3
Weglarz, J.4
-
24
-
-
51849167828
-
Handbook on Scheduling
-
From Theory to Applications, Springer, Berlin
-
Blazewicz, J., K. Ecker, E. Pesch, G. Schmidt and J. Weglarz (2007). Handbook on Scheduling. From Theory to Applications, Springer, Berlin.
-
(2007)
-
-
Blazewicz, J.1
Ecker, K.2
Pesch, E.3
Schmidt, G.4
Weglarz, J.5
-
25
-
-
0026417688
-
Branch and bound algorithm for the flow shop with multiple processors
-
Brah, S.A. and J.L. Hunsucker (1991). Branch and bound algorithm for the flow shop with multiple processors, European Journal of Operational Research 51, 88-99.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 88-99
-
-
Brah, S.A.1
Hunsucker, J.L.2
-
26
-
-
0014807274
-
A heuristic algorithm for the n job, m machine sequencing problem
-
Campbell, H.G., R.A. Dudek and M.L. Smith (1970). A heuristic algorithm for the n job, m machine sequencing problem, Management Science 16, B630-B637.
-
(1970)
Management Science
, vol.16
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
32
-
-
34447102986
-
Scheduling in a supply chain environment
-
Chauhan, S.S., V. Gordon and J.-M. Proth (2007). Scheduling in a supply chain environment, European Journal of Operational Research 183(3), 961-970.
-
(2007)
European Journal of Operational Research
, vol.183
, Issue.3
, pp. 961-970
-
-
Chauhan, S.S.1
Gordon, V.2
Proth, J.-M.3
-
33
-
-
44649100737
-
Supplier selection and supply quantity allocation of common and non-common parts with multiple criteria under multiple products
-
Che, Z.H. and H.S. Wang (2008). Supplier selection and supply quantity allocation of common and non-common parts with multiple criteria under multiple products, Computers and Industrial Engineering 55, 110-133.
-
(2008)
Computers and Industrial Engineering
, vol.55
, pp. 110-133
-
-
Che, Z.H.1
Wang, H.S.2
-
34
-
-
0035730939
-
Quantity and due date quoting available to promise
-
Chen, C.-Y., Z.-Y. Zhao and M.O. Ball (2001). Quantity and due date quoting available to promise, Information Systems Frontiers 3(4), 477-488.
-
(2001)
Information Systems Frontiers
, vol.3
, Issue.4
, pp. 477-488
-
-
Chen, C.-Y.1
Zhao, Z.-Y.2
Ball, M.O.3
-
35
-
-
80555141572
-
Applied Integer Programming: Modeling and Solution
-
Wiley, Hoboken, NJ
-
Chen, D.-S., R.G. Batson and Y. Dang (2010). Applied Integer Programming: Modeling and Solution, Wiley, Hoboken, NJ.
-
(2010)
-
-
Chen, D.-S.1
Batson, R.G.2
Dang, Y.3
-
36
-
-
33847267256
-
A mixed integer programming model for advanced planning and scheduling (APS)
-
Chen, K. and P. Ji (2007). A mixed integer programming model for advanced planning and scheduling (APS), European Journal of Operational Research 181, 515-522.
-
(2007)
European Journal of Operational Research
, vol.181
, pp. 515-522
-
-
Chen, K.1
Ji, P.2
-
37
-
-
22544468772
-
Integrated production and distribution operations: Taxonomy, models and review
-
In D. Simchi-Levi, S.D. Wu and Z.-J. Shen, Eds., Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era. Kluwer Academic Publishers, Boston, MA
-
Chen, Z.-L. (2004). Integrated production and distribution operations: Taxonomy, models and review. In D. Simchi-Levi, S.D. Wu and Z.-J. Shen, Eds., Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era. Kluwer Academic Publishers, Boston, MA.
-
(2004)
-
-
Chen, Z.-L.1
-
38
-
-
22544461035
-
Integrated scheduling of production and distribution operations
-
Chen, Z.-L. and G.L. Vairaktarakis (2005). Integrated scheduling of production and distribution operations, Management Science 51(4), 614-628.
-
(2005)
Management Science
, vol.51
, Issue.4
, pp. 614-628
-
-
Chen, Z.-L.1
Vairaktarakis, G.L.2
-
39
-
-
33744826037
-
Order assignment and scheduling in a supply chain
-
Chen, Z.-L. and G. Pundoor (2006). Order assignment and scheduling in a supply chain, Operations Research 54(3), 555-572.
-
(2006)
Operations Research
, vol.54
, Issue.3
, pp. 555-572
-
-
Chen, Z.-L.1
Pundoor, G.2
-
40
-
-
38549131389
-
Supply chain scheduling: Conflict and cooperation in assembly system
-
Chen, Z.-L. and N.G. Hall (2007). Supply chain scheduling: Conflict and cooperation in assembly system, Operations Research 55(6), 1072-1089.
-
(2007)
Operations Research
, vol.55
, Issue.6
, pp. 1072-1089
-
-
Chen, Z.-L.1
Hall, N.G.2
-
41
-
-
36348974060
-
Operations risk management: Overview of Paul Kleindorfer's contributions
-
Cohen, M.A. and H. Kunreuther (2007). Operations risk management: Overview of Paul Kleindorfer's contributions, Production and Operations Management 16(5), 525-541.
-
(2007)
Production and Operations Management
, vol.16
, Issue.5
, pp. 525-541
-
-
Cohen, M.A.1
Kunreuther, H.2
-
45
-
-
34247187936
-
An integrated multiobjective decision making process for supplier selection and order allocation
-
Demirtas, E.A. and O. Ustun (2008). An integrated multiobjective decision making process for supplier selection and order allocation, Omega: The International Journal of Management Science 36, 76-90.
-
(2008)
Omega: The International Journal of Management Science
, vol.36
, pp. 76-90
-
-
Demirtas, E.A.1
Ustun, O.2
-
46
-
-
33746402024
-
MIP approach to balancing transfer lines with blocks of parallel operations
-
Dolgui, A., B. Finel, N. Guschinsky, G. Levin and F. Vernadat (2006). MIP approach to balancing transfer lines with blocks of parallel operations, IIE Transactions 38, 869-882.
-
(2006)
IIE Transactions
, vol.38
, pp. 869-882
-
-
Dolgui, A.1
Finel, B.2
Guschinsky, N.3
Levin, G.4
Vernadat, F.5
-
48
-
-
15244355696
-
Workload based acceptance in job shop environments
-
Ebben, M.J.R., E.W. Hans and F.M. Olde Weghuis (2005). Workload based acceptance in job shop environments, OR Spectrum 27, 107-122.
-
(2005)
OR Spectrum
, vol.27
, pp. 107-122
-
-
Ebben, M.J.R.1
Hans, E.W.2
Olde Weghuis, F.M.3
-
49
-
-
0035401558
-
Optimizing the performance of a surface mount placement machine
-
Ellis, K.P., F.J. Vittes and J.E. Kobza (2001). Optimizing the performance of a surface mount placement machine, IEEE Transactions on Electronics Packaging Manufacturing 24(3), 160-170.
-
(2001)
IEEE Transactions on Electronics Packaging Manufacturing
, vol.24
, Issue.3
, pp. 160-170
-
-
Ellis, K.P.1
Vittes, F.J.2
Kobza, J.E.3
-
50
-
-
0032661559
-
Integrated production/distribution planning in supply chains: An invited review
-
Erengüc, S.S., N.C. Simpson and A.J. Vakharia (1999). Integrated production/distribution planning in supply chains: An invited review, European Journal of Operational Research, 115, 219-236.
-
(1999)
European Journal of Operational Research
, vol.115
, pp. 219-236
-
-
Erengüc, S.S.1
Simpson, N.C.2
Vakharia, A.J.3
-
51
-
-
0029262526
-
Facility-wide planning and scheduling of printed wiring board assembly
-
Feo, T.A., J.F. Bard and S.D. Holland (1995). Facility-wide planning and scheduling of printed wiring board assembly, Operations Research 43, 219-230.
-
(1995)
Operations Research
, vol.43
, pp. 219-230
-
-
Feo, T.A.1
Bard, J.F.2
Holland, S.D.3
-
52
-
-
0001232235
-
Efficient algorithms for finding optimal power-of-two policies for production/distribution systems with general setup costs
-
Federgruen, A. and Y.-S. Zheng (1995). Efficient algorithms for finding optimal power-of-two policies for production/distribution systems with general setup costs, Operations Research 43, 458-470.
-
(1995)
Operations Research
, vol.43
, pp. 458-470
-
-
Federgruen, A.1
Zheng, Y.-S.2
-
53
-
-
0003404231
-
AMPL, A Modeling Language for Mathematical Programming
-
Duxbury Press, Pacific Grove, CA
-
Fourer, R., D.M. Gay and B.W. Kernigham (2003). AMPL, A Modeling Language for Mathematical Programming. Duxbury Press, Pacific Grove, CA.
-
(2003)
-
-
Fourer, R.1
Gay, D.M.2
Kernigham, B.W.3
-
55
-
-
0003603813
-
Computers and Intractability: A Guide to the Theory of NP-Completeness
-
W.H. Freeman, San Francisco
-
Garey, M.R. and D.S. Johnson (1979). Computers and Intractability: A Guide to the Theory of NP-Completeness. W.H. Freeman, San Francisco.
-
(1979)
-
-
Garey, M.R.1
Johnson, D.S.2
-
56
-
-
37849007463
-
Analysis and Modeling of Manufacturing Systems
-
Springer, New York
-
Gershwin, S.B., Y. Dallery, Ch.T. Papadopoulos and J. MacGregor Smith, Eds. (2002). Analysis and Modeling of Manufacturing Systems, Springer, New York.
-
(2002)
-
-
Gershwin, S.B.1
Dallery, Y.2
Papadopoulos, C.T.3
MacGregor Smith, J.4
-
57
-
-
33645576841
-
Requirements planning with pricing and order selection flexibility
-
Geunes, J., H.E. Romeijn and K. Taaffe (2006). Requirements planning with pricing and order selection flexibility, Operations Research 54(2), 394-401.
-
(2006)
Operations Research
, vol.54
, Issue.2
, pp. 394-401
-
-
Geunes, J.1
Romeijn, H.E.2
Taaffe, K.3
-
58
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
Ghosh, S. and R.J. Gagnon (1989). A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems, International Journal of Production Research 27, 637-670.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
59
-
-
33751312075
-
Newsvendor solutions via conditional value-at-risk minimization
-
Gotoh, J. and Y. Takano (2007). Newsvendor solutions via conditional value-at-risk minimization, European Journal of Operational Research 179(1), 80-96.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.1
, pp. 80-96
-
-
Gotoh, J.1
Takano, Y.2
-
61
-
-
0030783235
-
Integrated procurement-production system in a just-in-time environment-modeling and analysis
-
Goyal, S.K. and S.G. Deshmukh (1997). Integrated procurement-production system in a just-in-time environment-modeling and analysis, Production Planning and Control 8(1), 31-36.
-
(1997)
Production Planning and Control
, vol.8
, Issue.1
, pp. 31-36
-
-
Goyal, S.K.1
Deshmukh, S.G.2
-
62
-
-
0000410538
-
Scheduling of reentrant flow shops
-
Graves, S.C., H.C. Meal, D. Stefek and A.H. Zeghmi (1983). Scheduling of reentrant flow shops, Journal of Operations Management 3, 197-207.
-
(1983)
Journal of Operations Management
, vol.3
, pp. 197-207
-
-
Graves, S.C.1
Meal, H.C.2
Stefek, D.3
Zeghmi, A.H.4
-
63
-
-
0022680181
-
A mixed integer program for loading and scheduling multiple flexible manufacturing cells
-
Greene, J.T. and P.R. Sadowski (1986). A mixed integer program for loading and scheduling multiple flexible manufacturing cells, European Journal of Operational Research 24, 379-386.
-
(1986)
European Journal of Operational Research
, vol.24
, pp. 379-386
-
-
Greene, J.T.1
Sadowski, P.R.2
-
64
-
-
0030170411
-
Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
-
Guinet, A.G.P. and A.A. Solomon (1996). Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time, International Journal of Production Research 34, 1643-1654.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1643-1654
-
-
Guinet, A.G.P.1
Solomon, A.A.2
-
65
-
-
67651160370
-
Comparison of exact and heuristic methods for a transfer line balancing problem
-
Guschinskaya, O. and A. Dolgui (2010). Comparison of exact and heuristic methods for a transfer line balancing problem, International Journal of Production Economics. 120(2), 276-286.
-
(2010)
International Journal of Production Economics.
, vol.120
, Issue.2
, pp. 276-286
-
-
Guschinskaya, O.1
Dolgui, A.2
-
66
-
-
0029373396
-
Non-stationary ordering policies for multi-item inventory systems subject to a single resource constraint
-
Güder, F., J.L. Zydiak and S.S. Chaudhry (1995). Non-stationary ordering policies for multi-item inventory systems subject to a single resource constraint, Journal of Operational Research Society 46, 1145-1152.
-
(1995)
Journal of Operational Research Society
, vol.46
, pp. 1145-1152
-
-
Güder, F.1
Zydiak, J.L.2
Chaudhry, S.S.3
-
67
-
-
0343777298
-
Fixed cycle ordering policies for capacitated multiple item inventory systems with quantity discounts
-
Güder, F. and J.L. Zydiak (2000). Fixed cycle ordering policies for capacitated multiple item inventory systems with quantity discounts, Computers & Industrial Engineering 38, 67-77.
-
(2000)
Computers & Industrial Engineering
, vol.38
, pp. 67-77
-
-
Güder, F.1
Zydiak, J.L.2
-
68
-
-
0035019837
-
Scheduling with fixed delivery dates
-
Hall, N.G., M. Lesaoana and C.N. Potts (2001). Scheduling with fixed delivery dates, Operations Research 49(1), 134-144.
-
(2001)
Operations Research
, vol.49
, Issue.1
, pp. 134-144
-
-
Hall, N.G.1
Lesaoana, M.2
Potts, C.N.3
-
69
-
-
0032071138
-
Scheduling with finite capacity output buffers
-
Hall, N.G., M.E. Posner and C.N. Potts (1998a). Scheduling with finite capacity output buffers, Operations Research 46, Suppl. No. 3, S84-S89.
-
(1998)
Operations Research
, vol.46
, Issue.3 SUPPL.
-
-
Hall, N.G.1
Posner, M.E.2
Potts, C.N.3
-
70
-
-
0032072228
-
Scheduling with finite capacity input buffers
-
Hall, N.G., M.E. Posner and C.N. Potts (1998b). Scheduling with finite capacity input buffers, Operations Research 46, Suppl. No. 3, S154-S159.
-
(1998)
Operations Research
, vol.46
, Issue.3 SUPPL.
-
-
Hall, N.G.1
Posner, M.E.2
Potts, C.N.3
-
71
-
-
2342539189
-
Supply chain scheduling: Batching and delivery
-
Hall, N.G. and C.N. Potts (2003). Supply chain scheduling: Batching and delivery, Operations Research 51(4), 566-584.
-
(2003)
Operations Research
, vol.51
, Issue.4
, pp. 566-584
-
-
Hall, N.G.1
Potts, C.N.2
-
72
-
-
0029534676
-
Revenue management approach to demand management and order booking in assemble-to-order manufacturing
-
Harris, F.H. and J.P. Pinder (1995). Revenue management approach to demand management and order booking in assemble-to-order manufacturing, Journal of Operations Management 13(4), 299-309.
-
(1995)
Journal of Operations Management
, vol.13
, Issue.4
, pp. 299-309
-
-
Harris, F.H.1
Pinder, J.P.2
-
73
-
-
0002957476
-
Hierarchical integration of production planning and scheduling
-
In M.A. Geisler, Ed., Studies in Management Science, vol. I, Logistics, North Holland, Amsterdam
-
Hax, A.C. and H.C. Meal (1975). Hierarchical integration of production planning and scheduling. In M.A. Geisler, Ed., Studies in Management Science, vol. I, Logistics, North Holland, Amsterdam, 53-69.
-
(1975)
, pp. 53-69
-
-
Hax, A.C.1
Meal, H.C.2
-
74
-
-
0035307357
-
Due date setting with supply constraints in systems using MRP
-
Hegedus, M.G. and W.J. Hopp (2001). Due date setting with supply constraints in systems using MRP. Computers & Industrial Engineering, 39, 293-305.
-
(2001)
Computers & Industrial Engineering
, vol.39
, pp. 293-305
-
-
Hegedus, M.G.1
Hopp, W.J.2
-
75
-
-
70349753154
-
Multi-criteria decision making approaches for supplier evaluation and selection: A literature review
-
Ho, W., X. Xu and K.D. Prasanta (2010). Multi-criteria decision making approaches for supplier evaluation and selection: A literature review, European Journal of Operational Research 202, 16-24.
-
(2010)
European Journal of Operational Research
, vol.202
, pp. 16-24
-
-
Ho, W.1
Xu, X.2
Prasanta, K.D.3
-
76
-
-
0003849209
-
Factory Physics: Foundations of Manufacturing Management
-
McGraw-Hill, New York
-
Hopp, W. and M. Spearman (1996). Factory Physics: Foundations of Manufacturing Management. McGraw-Hill, New York.
-
(1996)
-
-
Hopp, W.1
Spearman, M.2
-
77
-
-
0028766172
-
Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
-
Hunsucker, J.L. and J.R. Shah (1994). Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment, European Journal of Operational Research 72, 102-114.
-
(1994)
European Journal of Operational Research
, vol.72
, pp. 102-114
-
-
Hunsucker, J.L.1
Shah, J.R.2
-
78
-
-
0000770552
-
Determining optimal reorder intervals in capacitated production/distribution systems
-
Jackson, P.L., W.L. Maxwell and J.A. Muckstadt (1988). Determining optimal reorder intervals in capacitated production/distribution systems, Management Science 35, 938-958.
-
(1988)
Management Science
, vol.35
, pp. 938-958
-
-
Jackson, P.L.1
Maxwell, W.L.2
Muckstadt, J.A.3
-
79
-
-
0030282977
-
Implementation of setup optimization on the shop floor
-
Jain, A., M.E. Johnson and E. Safai (1996). Implementation of setup optimization on the shop floor, Operations Research 44, 843-851.
-
(1996)
Operations Research
, vol.44
, pp. 843-851
-
-
Jain, A.1
Johnson, M.E.2
Safai, E.3
-
80
-
-
33846071077
-
Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling
-
Janak, S.L., C.A. Floudas, J. Kallrath and N. Vormbrock (2006). Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling, Industrial and Engineering Chemistry Research 45(25), 8253-8269.
-
(2006)
Industrial and Engineering Chemistry Research
, vol.45
, Issue.25
, pp. 8253-8269
-
-
Janak, S.L.1
Floudas, C.A.2
Kallrath, J.3
Vormbrock, N.4
-
81
-
-
80155150225
-
Supplier selection and order quantity allocation: A comprehensive model
-
Jayaraman, V., R. Srivastava and W.C. Benton (2006). Supplier selection and order quantity allocation: A comprehensive model, Journal of Supply Chain Management 35(2), 50-58.
-
(2006)
Journal of Supply Chain Management
, vol.35
, Issue.2
, pp. 50-58
-
-
Jayaraman, V.1
Srivastava, R.2
Benton, W.C.3
-
82
-
-
0001899198
-
Mathematical programming for the scheduling problem with alternate process plans in FMS
-
Jiang, J. and W. Hsiao (1994). Mathematical programming for the scheduling problem with alternate process plans in FMS, Computers and Industrial Engineering 27(10), 15-18.
-
(1994)
Computers and Industrial Engineering
, vol.27
, Issue.10
, pp. 15-18
-
-
Jiang, J.1
Hsiao, W.2
-
83
-
-
10444255675
-
Scheduling hybrid flowshops in printed circuit board assembly lines
-
Jin, Z.H., K. Ohno, T. Ito and S.E. Elmaghraby (2002). Scheduling hybrid flowshops in printed circuit board assembly lines, Production and Operations Management 11(2), 216-230.
-
(2002)
Production and Operations Management
, vol.11
, Issue.2
, pp. 216-230
-
-
Jin, Z.H.1
Ohno, K.2
Ito, T.3
Elmaghraby, S.E.4
-
84
-
-
0003075019
-
Optimal two-and three-stage production schedules with setup times included
-
Johnson, S.M. (1954). Optimal two-and three-stage production schedules with setup times included, Naval Research Logistics Quarterly 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
85
-
-
2442696779
-
Optimal versus heuristic scheduling of surface mount technology lines
-
Kaczmarczyk, W., T. Sawik, A. Schaller and T.M. Tirpak (2004). Optimal versus heuristic scheduling of surface mount technology lines, International Journal of Production Research 42(10), 2083-2110.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.10
, pp. 2083-2110
-
-
Kaczmarczyk, W.1
Sawik, T.2
Schaller, A.3
Tirpak, T.M.4
-
86
-
-
67651178676
-
Production planning and coordination in customer driven supply chains
-
Kaczmarczyk, W., T. Sawik, A. Schaller and T. Tirpak (2006). Production planning and coordination in customer driven supply chains, Wybrane Zagadnienia Logistyki Stosowanej 3, 81-89.
-
(2006)
Wybrane Zagadnienia Logistyki Stosowanej
, vol.3
, pp. 81-89
-
-
Kaczmarczyk, W.1
Sawik, T.2
Schaller, A.3
Tirpak, T.4
-
88
-
-
0000814799
-
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
-
Kim, Y.-D., H.-G. Lim and M.-W. Park (1996). Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process, European Journal of Operational Research 91, 124-143.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 124-143
-
-
Kim, Y.-D.1
Lim, H.-G.2
Park, M.-W.3
-
89
-
-
0003478471
-
Multi-Level Lot Sizing and Scheduling: Methods for Capacitated Dynamic and Deterministic Models
-
Physica, Heidelberg
-
Kimms, A. (1997). Multi-Level Lot Sizing and Scheduling: Methods for Capacitated Dynamic and Deterministic Models. Physica, Heidelberg.
-
(1997)
-
-
Kimms, A.1
-
90
-
-
12244249206
-
A review of exact solution methods for the non-preemptive multiprocessor flowshop problem
-
Kis, T. and E. Pesch (2005). A review of exact solution methods for the non-preemptive multiprocessor flowshop problem, European Journal of Operational Research 164(3), 592-608.
-
(2005)
European Journal of Operational Research
, vol.164
, Issue.3
, pp. 592-608
-
-
Kis, T.1
Pesch, E.2
-
92
-
-
0023562034
-
Heuristic methods for flexible flow line scheduling
-
Kochhar, S. and R.J.T. Morris (1987). Heuristic methods for flexible flow line scheduling, Journal of Manufacturing Systems 6(4), 299-314.
-
(1987)
Journal of Manufacturing Systems
, vol.6
, Issue.4
, pp. 299-314
-
-
Kochhar, S.1
Morris, R.J.T.2
-
93
-
-
0034516883
-
Integration of assembly and fabrication for make-to-order production
-
Kolisch, R. (2000). Integration of assembly and fabrication for make-to-order production, International Journal of Production Economics 68, 287-306.
-
(2000)
International Journal of Production Economics
, vol.68
, pp. 287-306
-
-
Kolisch, R.1
-
94
-
-
0033360348
-
Cyclic scheduling in synchronous production lines
-
Kouvelis, P. and S. Karabati (1999). Cyclic scheduling in synchronous production lines, IIE Transactions 31(8), 709-719.
-
(1999)
IIE Transactions
, vol.31
, Issue.8
, pp. 709-719
-
-
Kouvelis, P.1
Karabati, S.2
-
95
-
-
42749087725
-
Scheduling coordination problems in supply chain planning
-
Kreipl, S. and J.T. Dickersbach (2008). Scheduling coordination problems in supply chain planning, Annals of Operations Research 106, 103-122.
-
(2008)
Annals of Operations Research
, vol.106
, pp. 103-122
-
-
Kreipl, S.1
Dickersbach, J.T.2
-
97
-
-
2942674864
-
Scheduling flexible flow lines with sequence-dependent setup times
-
Kurz, M.E. and R.G. Askin (2004). Scheduling flexible flow lines with sequence-dependent setup times, European Journal of Operational Research 159(1), 66-82.
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.1
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
100
-
-
0344427189
-
Machine scheduling with transportation considerations
-
Lee, C.-Y. and Z.-L. Chen (2001), Machine scheduling with transportation considerations, Journal of Scheduling 4, 3-24.
-
(2001)
Journal of Scheduling
, vol.4
, pp. 3-24
-
-
Lee, C.-Y.1
Chen, Z.-L.2
-
101
-
-
9744269106
-
A branchand-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness
-
Lee, G.-C. and Y.-D. Kim (2004). A branchand-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness, International Journal of Production Research 42(22), 4731-4743.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.22
, pp. 4731-4743
-
-
Lee, G.-C.1
Kim, Y.-D.2
-
102
-
-
10144234131
-
A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering
-
Lee, W. (2005). A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering, Omega: The International Journal of Management Science 33, 163-174.
-
(2005)
Omega: The International Journal of Management Science
, vol.33
, pp. 163-174
-
-
Lee, W.1
-
103
-
-
0036643151
-
Multi-period job selection: Planning work loads to maximize profit
-
Lewis, H.F. and S.A. Slotnick (2002). Multi-period job selection: Planning work loads to maximize profit, Computers & Operations Research 29, 1081-1098.
-
(2002)
Computers & Operations Research
, vol.29
, pp. 1081-1098
-
-
Lewis, H.F.1
Slotnick, S.A.2
-
104
-
-
80052423312
-
Incorporating uncertainty into a supplier selection problem
-
doi:10.1016/j.ijpe.2009.11.007
-
Li, L. and Z.B. Zabinsky (2009). Incorporating uncertainty into a supplier selection problem, International Journal of Production Economics doi:10.1016/j.ijpe.2009.11.007.
-
(2009)
International Journal of Production Economics
-
-
Li, L.1
Zabinsky, Z.B.2
-
105
-
-
0030288436
-
Daily scheduling for R&D semiconductor fabrication
-
Liao, D.-Y., S.-C. Chang, K.W. Pei and C.-M. Chang (1996). Daily scheduling for R&D semiconductor fabrication, IEEE Transactions on Semiconductor Manufacturing 9, 550-560.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, pp. 550-560
-
-
Liao, D.-Y.1
Chang, S.-C.2
Pei, K.W.3
Chang, C.-M.4
-
106
-
-
34047108735
-
Integration of supplier selection, procurement lot sizing and carrier selection under dynamic demand conditions
-
Liao, Z. and J. Rittscher (2007). Integration of supplier selection, procurement lot sizing and carrier selection under dynamic demand conditions, International Journal of Production Economics 107, 502-510.
-
(2007)
International Journal of Production Economics
, vol.107
, pp. 502-510
-
-
Liao, Z.1
Rittscher, J.2
-
108
-
-
0034248849
-
Scheduling flexible flow shops with sequence dependent setup effects
-
Liu, C.-Y. and S.-C. Chang (2000). Scheduling flexible flow shops with sequence dependent setup effects, IEEE Transactions on Robotics and Automation 16(4), 408-419.
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, Issue.4
, pp. 408-419
-
-
Liu, C.-Y.1
Chang, S.-C.2
-
110
-
-
0000237789
-
On the job-shop scheduling problem
-
Manne, A.S. (1960). On the job-shop scheduling problem, Operations Research 8, 219-223.
-
(1960)
Operations Research
, vol.8
, pp. 219-223
-
-
Manne, A.S.1
-
111
-
-
0025414458
-
Coordinated production scheduling for make-to-order manufacturing
-
Markland, R.E., K.H. Darby-Dowman and E.D. Minor (1990). Coordinated production scheduling for make-to-order manufacturing, European Journal of Operational Research 45(2-3), 155-176.
-
(1990)
European Journal of Operational Research
, vol.45
, Issue.2-3
, pp. 155-176
-
-
Markland, R.E.1
Darby-dowman, K.H.2
Minor, E.D.3
-
112
-
-
0022150670
-
Establishing consistent and realistic reorder intervals in production-distribution systems
-
Maxwell, W.L. and J.A. Muckstadt (1985). Establishing consistent and realistic reorder intervals in production-distribution systems, Operations Research 33, 1316-1341.
-
(1985)
Operations Research
, vol.33
, pp. 1316-1341
-
-
Maxwell, W.L.1
Muckstadt, J.A.2
-
113
-
-
0024770469
-
Sequencing in an assembly line with blocking to minimize cycle time
-
McCormick, S.T., M.L. Pinedo, S. Shenker and B. Wolf (1989). Sequencing in an assembly line with blocking to minimize cycle time, Operations Research 37, 925-936.
-
(1989)
Operations Research
, vol.37
, pp. 925-936
-
-
McCormick, S.T.1
Pinedo, M.L.2
Shenker, S.3
Wolf, B.4
-
114
-
-
0003949309
-
Hierarchical Operations in Supply Chain Planning
-
Springer, London
-
Miller, T.C. (2002). Hierarchical Operations in Supply Chain Planning, Springer, London.
-
(2002)
-
-
Miller, T.C.1
-
115
-
-
41449093762
-
Integrated process planning and scheduling in a supply chain
-
Moon, C., Y.H. Lee, C.S. Jeong and J.S. Yun (2008). Integrated process planning and scheduling in a supply chain, Computers and Industrial Engineering 54(4), 1048-1061.
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.4
, pp. 1048-1061
-
-
Moon, C.1
Lee, Y.H.2
Jeong, C.S.3
Yun, J.S.4
-
116
-
-
26844470749
-
Planning component delivery intervals in constrained assembly systems
-
In S. Axsäter, Ch. Schneeweiss and E. Silver, Eds., Multi-Stage Production Planning and Inventory Control, Springer, Berlin
-
Muckstadt, J.A. (1985). Planning component delivery intervals in constrained assembly systems. In S. Axsäter, Ch. Schneeweiss and E. Silver, Eds., Multi-Stage Production Planning and Inventory Control, Springer, Berlin, 132-149.
-
(1985)
, pp. 132-149
-
-
Muckstadt, J.A.1
-
117
-
-
77957038373
-
Analysis of multistage production systems
-
In S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin, Eds., Handbooks in Operations Research and Management Science, vol. 4, North-Holland, Amsterdam
-
Muckstadt, J.A. and R.O. Roundy (1993). Analysis of multistage production systems. In S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin, Eds., Handbooks in Operations Research and Management Science, vol. 4, North-Holland, Amsterdam, 59-131.
-
(1993)
, pp. 59-131
-
-
Muckstadt, J.A.1
Roundy, R.O.2
-
118
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow shop sequencing problem
-
Nawaz, M., E.E. Enscore, Jr. and I. Ham (1983). A heuristic algorithm for the m-machine, n-job flow shop sequencing problem, Omega: The International Journal of Management Science 11(1), 91-95.
-
(1983)
Omega: The International Journal of Management Science
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr, E.E.2
Ham, I.3
-
119
-
-
85101463362
-
Integer and Combinatorial Optimization
-
John Wiley & Sons, New York
-
Nemhauser, G.L. and L.A. Wolsey (1999). Integer and Combinatorial Optimization, John Wiley & Sons, New York.
-
(1999)
-
-
Nemhauser, G.L.1
Wolsey, L.A.2
-
121
-
-
0001204823
-
A fast tabu search algorithm for the permutation flow-shop problem
-
Nowicki, E. and C. Smutnicki (1996). A fast tabu search algorithm for the permutation flow-shop problem, European Journal of Operational Research 91(1), 160-175.
-
(1996)
European Journal of Operational Research
, vol.91
, Issue.1
, pp. 160-175
-
-
Nowicki, E.1
Smutnicki, C.2
-
124
-
-
70449520337
-
A note on "A mixed integer programming model for advanced planning and scheduling (APS)
-
Örnek, A., S.Ö zpeynirci and C. Ö ztürk (2010). A note on "A mixed integer programming model for advanced planning and scheduling (APS)," European Journal of Operational Research 203, 784-785.
-
(2010)
European Journal of Operational Research
, vol.203
, pp. 784-785
-
-
Örnek, A.1
Özpeynirci, S.2
Öztürk, C.3
-
125
-
-
0000317841
-
Inventory models of future supply uncertainty with single and multiple suppliers
-
Parlar, M. and D. Perry (1996). Inventory models of future supply uncertainty with single and multiple suppliers, Naval Research Logistics 43, 191-210.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 191-210
-
-
Parlar, M.1
Perry, D.2
-
126
-
-
84892344246
-
Planning and Scheduling in Manufacturing and Services
-
Springer, New York
-
Pinedo, M. (2005). Planning and Scheduling in Manufacturing and Services. Springer, New York.
-
(2005)
-
-
Pinedo, M.1
-
127
-
-
35348974381
-
Production Planning by Mixed Integer Programming
-
Springer, Berlin
-
Pochet, Y. and L.A. Wolsey (2006). Production Planning by Mixed Integer Programming. Springer, Berlin.
-
(2006)
-
-
Pochet, Y.1
Wolsey, L.A.2
-
128
-
-
33751071385
-
A taxonomy of flexible flow line scheduling procedures
-
Quadt, D. and H. Kuhn (2007). A taxonomy of flexible flow line scheduling procedures, European Journal of Operational Research 178(3), 686-698.
-
(2007)
European Journal of Operational Research
, vol.178
, Issue.3
, pp. 686-698
-
-
Quadt, D.1
Kuhn, H.2
-
129
-
-
0026819776
-
A multistage parallel-processor flowshop problem with minimum flowtime
-
Rajendran, C. and D. Chaudhuri (1992). A multistage parallel-processor flowshop problem with minimum flowtime, European Journal of Operational Research 57(1), 111-122.
-
(1992)
European Journal of Operational Research
, vol.57
, Issue.1
, pp. 111-122
-
-
Rajendran, C.1
Chaudhuri, D.2
-
131
-
-
73449099561
-
Review and classification of hybrid flowshop scheduling problems from a production system and a solutions procedure perspective
-
Ribas, I., R. Leisten and J.M. Framinan (2010). Review and classification of hybrid flowshop scheduling problems from a production system and a solutions procedure perspective, Computers & Operations Research 37, 1439-1454.
-
(2010)
Computers & Operations Research
, vol.37
, pp. 1439-1454
-
-
Ribas, I.1
Leisten, R.2
Framinan, J.M.3
-
132
-
-
0002062038
-
Optimization of conditional value-at-risk
-
Rockafellar, R.T. and S. Uryasev (2000). Optimization of conditional value-at-risk, Journal of Risk 2(3), 21-41.
-
(2000)
Journal of Risk
, vol.2
, Issue.3
, pp. 21-41
-
-
Rockafellar, R.T.1
Uryasev, S.2
-
133
-
-
0036076694
-
Conditional value-at-risk for general loss distributions
-
Rockafellar, R.T. and S. Uryasev (2002). Conditional value-at-risk for general loss distributions, Journal of Banking and Finance 26(7), 1443-1471.
-
(2002)
Journal of Banking and Finance
, vol.26
, Issue.7
, pp. 1443-1471
-
-
Rockafellar, R.T.1
Uryasev, S.2
-
135
-
-
0025453417
-
On the single resource capacity problem for multi-item inventory system
-
Rosenblatt, M.J. and U.G. Rothblum (1990). On the single resource capacity problem for multi-item inventory system, Operations Research 38, 686-693.
-
(1990)
Operations Research
, vol.38
, pp. 686-693
-
-
Rosenblatt, M.J.1
Rothblum, U.G.2
-
137
-
-
33748148203
-
The optimal number of suppliers considering the costs of individual supplier failures
-
Ruiz-Torres, A.J. and M. Farzad (2007). The optimal number of suppliers considering the costs of individual supplier failures, Omega: The International Journal of Management Science 35(1), 104-115.
-
(2007)
Omega: The International Journal of Management Science
, vol.35
, Issue.1
, pp. 104-115
-
-
Ruiz-torres, A.J.1
Farzad, M.2
-
138
-
-
0035339890
-
An MILP-based reordering algorithm for complex industrial scheduling and rescheduling
-
Röslof, J., I. Harjunkoski, J. Björkqvist, S. Karlsson and T. Westerlund (2001). An MILP-based reordering algorithm for complex industrial scheduling and rescheduling, Computers and Chemical Engineering 25, 821-828.
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 821-828
-
-
Röslof, J.1
Harjunkoski, I.2
Björkqvist, J.3
Karlsson, S.4
Westerlund, T.5
-
139
-
-
0036532644
-
Solving a large scale industrial scheduling problem using MILP combined with a heuristic procedure
-
Röslof, J., I. Harjunkoski, T. Westerlund and J. Isaksson (2002). Solving a large scale industrial scheduling problem using MILP combined with a heuristic procedure, European Journal of Operational Research 138, 29-42.
-
(2002)
European Journal of Operational Research
, vol.138
, pp. 29-42
-
-
Röslof, J.1
Harjunkoski, I.2
Westerlund, T.3
Isaksson, J.4
-
140
-
-
0002434711
-
A solution to a special class of flowshop scheduling problems
-
In S.E. Elmaghraby, Ed., Symposium on the Theory of Scheduling and Its Applications. Berlin: Springer
-
Salvador, M.S. (1973). A solution to a special class of flowshop scheduling problems. In S.E. Elmaghraby, Ed., Symposium on the Theory of Scheduling and Its Applications. Berlin: Springer, 83-91.
-
(1973)
, pp. 83-91
-
-
Salvador, M.S.1
-
141
-
-
53049090497
-
An integrated group decision-making process for supplier selection and order allocation using multi-attribute utility theory and linear programming
-
Sanayei, A., S.F. Mousavi, M.R. Abdi and A. Mohaghar (2008). An integrated group decision-making process for supplier selection and order allocation using multi-attribute utility theory and linear programming, Journal of the Franklin Institute 345(7), 731-747.
-
(2008)
Journal of the Franklin Institute
, vol.345
, Issue.7
, pp. 731-747
-
-
Sanayei, A.1
Mousavi, S.F.2
Abdi, M.R.3
Mohaghar, A.4
-
142
-
-
0033344267
-
A review of integrated analysis of production distribution systems
-
Sarmiento, A.M. and R. Nagi (1999). A review of integrated analysis of production distribution systems, IIE Transactions 31, 1061-1074.
-
(1999)
IIE Transactions
, vol.31
, pp. 1061-1074
-
-
Sarmiento, A.M.1
Nagi, R.2
-
143
-
-
80052228847
-
Value-at-risk vs. conditional value-at-risk in risk management and optimization
-
Sarykalin, S., G. Serraino and S. Uryasev (2008). Value-at-risk vs. conditional value-at-risk in risk management and optimization, Tutorials in Operations Research, INFORMS 2008, 270-294.
-
(2008)
Tutorials in Operations Research, INFORMS
, vol.2008
, pp. 270-294
-
-
Sarykalin, S.1
Serraino, G.2
Uryasev, S.3
-
144
-
-
67651181784
-
Stochastic optimal control of a multi-facility, multi-product production scheduling with random times of supplies
-
Sawik, T. (1977). Stochastic optimal control of a multi-facility, multi-product production scheduling with random times of supplies, Control and Cybernetics 6(3-4), 21-35.
-
(1977)
Control and Cybernetics
, vol.6
, Issue.3-4
, pp. 21-35
-
-
Sawik, T.1
-
145
-
-
0025419819
-
Modelling and scheduling of a flexible manufacturing system
-
Sawik, T. (1990). Modelling and scheduling of a flexible manufacturing system, European Journal of Operational Research 45, 177-190.
-
(1990)
European Journal of Operational Research
, vol.45
, pp. 177-190
-
-
Sawik, T.1
-
147
-
-
0038588837
-
New algorithms for scheduling flexible flow lines. In Proceedings of Japan-U.S.A. Symposium on Flexible Automation. Kob
-
Sawik, T. (1994). New algorithms for scheduling flexible flow lines. In Proceedings of Japan-U.S.A. Symposium on Flexible Automation. Kob, July 11-18, 3, 1091-1096.
-
(1994)
July 11-18
, vol.3
, pp. 1091-1096
-
-
Sawik, T.1
-
148
-
-
0001935804
-
Integer programming models for the design and balancing of flexible assembly systems
-
Sawik, T. (1995a). Integer programming models for the design and balancing of flexible assembly systems, Mathematical and Computer Modelling 21(4), 1-12.
-
(1995)
Mathematical and Computer Modelling
, vol.21
, Issue.4
, pp. 1-12
-
-
Sawik, T.1
-
149
-
-
84877027692
-
Scheduling flexible flow lines with no in-process buffers
-
Sawik, T. (1995b). Scheduling flexible flow lines with no in-process buffers, International Journal of Production Research 33, 1359-1370.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1359-1370
-
-
Sawik, T.1
-
150
-
-
0001824597
-
A multilevel machine and vehicle scheduling in a flexible manufacturing system
-
Sawik, T. (1996). A multilevel machine and vehicle scheduling in a flexible manufacturing system, Mathematical & Computer Modelling 23(7), 45-57.
-
(1996)
Mathematical & Computer Modelling
, vol.23
, Issue.7
, pp. 45-57
-
-
Sawik, T.1
-
151
-
-
0032095129
-
A lexicographic approach to bi-objective loading of a flexible assembly system
-
Sawik, T. (1998a). A lexicographic approach to bi-objective loading of a flexible assembly system, European Journal of Operational Research 107(3), 658-668.
-
(1998)
European Journal of Operational Research
, vol.107
, Issue.3
, pp. 658-668
-
-
Sawik, T.1
-
152
-
-
0032212715
-
Simultaneous loading, routing and assembly plan selection in a flexible assembly system
-
Sawik, T. (1998b). Simultaneous loading, routing and assembly plan selection in a flexible assembly system, Mathematical and Computer Modelling 28(9), 19-29.
-
(1998)
Mathematical and Computer Modelling
, vol.28
, Issue.9
, pp. 19-29
-
-
Sawik, T.1
-
153
-
-
0003403493
-
Production Planning and Scheduling in Flexible Assembly Systems
-
Springer-Verlag, Berlin
-
Sawik, T. (1999). Production Planning and Scheduling in Flexible Assembly Systems, Springer-Verlag, Berlin.
-
(1999)
-
-
Sawik, T.1
-
154
-
-
0034209871
-
Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
-
Sawik, T. (2000a). Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers, Mathematical and Computer Modelling 31, 39-52.
-
(2000)
Mathematical and Computer Modelling
, vol.31
, pp. 39-52
-
-
Sawik, T.1
-
155
-
-
0034692663
-
Simultaneous versus sequential loading and scheduling of flexible assembly systems
-
Sawik, T. (2000b). Simultaneous versus sequential loading and scheduling of flexible assembly systems, International Journal of Production Research 38, 3267-3282.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 3267-3282
-
-
Sawik, T.1
-
156
-
-
0033904098
-
An LP-based approach for loading and routing in a flexible assembly line
-
Sawik, T. (2000c). An LP-based approach for loading and routing in a flexible assembly line, International Journal of Production Economics 64(1-3), 49-58.
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.1-3
, pp. 49-58
-
-
Sawik, T.1
-
157
-
-
0035922495
-
Mixed integer programming for scheduling surface mount technology lines
-
Sawik, T. (2001). Mixed integer programming for scheduling surface mount technology lines, International Journal of Production Research 39, 3219-3235.
-
(2001)
International Journal of Production Research
, vol.39
, pp. 3219-3235
-
-
Sawik, T.1
-
158
-
-
0037097830
-
Balancing and scheduling of surface mount technology lines
-
Sawik, T. (2002a). Balancing and scheduling of surface mount technology lines, International Journal of Production Research 40(9), 1973-1991.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.9
, pp. 1973-1991
-
-
Sawik, T.1
-
159
-
-
0037121160
-
Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
-
Sawik, T. (2002b). Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line, European Journal of Operational Research 143(1), 115-124.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.1
, pp. 115-124
-
-
Sawik, T.1
-
160
-
-
0037200415
-
An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers
-
Sawik, T. (2002c). An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers, Mathematical and Computer Modelling 36, 461-471.
-
(2002)
Mathematical and Computer Modelling
, vol.36
, pp. 461-471
-
-
Sawik, T.1
-
161
-
-
0345306112
-
Loading and scheduling of a flexible assembly system by mixed integer programming
-
Sawik, T. (2004). Loading and scheduling of a flexible assembly system by mixed integer programming, European Journal of Operational Research 154(1), 1-19.
-
(2004)
European Journal of Operational Research
, vol.154
, Issue.1
, pp. 1-19
-
-
Sawik, T.1
-
162
-
-
18844387410
-
Integer programming approach to production scheduling for make-to-order manufacturing
-
Sawik, T. (2005a). Integer programming approach to production scheduling for make-to-order manufacturing, Mathematical and Computer Modelling 41(1), 99-118.
-
(2005)
Mathematical and Computer Modelling
, vol.41
, Issue.1
, pp. 99-118
-
-
Sawik, T.1
-
163
-
-
26844524258
-
A cyclic versus flexible approach to materials ordering in make-toorder assembly
-
Sawik, T. (2005b). A cyclic versus flexible approach to materials ordering in make-toorder assembly, Mathematical and Computer Modelling 42(3-4), 279-290.
-
(2005)
Mathematical and Computer Modelling
, vol.42
, Issue.3-4
, pp. 279-290
-
-
Sawik, T.1
-
164
-
-
30844458381
-
Hierarchical approach to production scheduling in make-to-order assembly
-
Sawik, T. (2006). Hierarchical approach to production scheduling in make-to-order assembly, International Journal of Production Research 44(4), 801-830.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.4
, pp. 801-830
-
-
Sawik, T.1
-
165
-
-
70449610383
-
A multi-objective customer orders assignment and resource leveling in make-to-order manufacturing
-
Sawik, T. (2007a). A multi-objective customer orders assignment and resource leveling in make-to-order manufacturing, International Transactions in Operational Research 14(6), 491-508.
-
(2007)
International Transactions in Operational Research
, vol.14
, Issue.6
, pp. 491-508
-
-
Sawik, T.1
-
166
-
-
34247897041
-
Multi-objective master production scheduling in make-to-order manufacturing
-
Sawik, T. (2007b). Multi-objective master production scheduling in make-to-order manufacturing, International Journal of Production Research 45(12), 2629-2653.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.12
, pp. 2629-2653
-
-
Sawik, T.1
-
167
-
-
33847024346
-
A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing
-
Sawik, T. (2007c). A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing, European Journal of Operational Research 180(3), 1060-1075.
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.3
, pp. 1060-1075
-
-
Sawik, T.1
-
168
-
-
35248876296
-
Integer programming approach to reactive scheduling in maketo-order manufacturing
-
Sawik, T. (2007d). Integer programming approach to reactive scheduling in maketo-order manufacturing, Mathematical and Computer Modelling 46(11-12), 1373-1387.
-
(2007)
Mathematical and Computer Modelling
, vol.46
, Issue.11-12
, pp. 1373-1387
-
-
Sawik, T.1
-
169
-
-
70449595763
-
Multi-objective due-date setting in a make-to-order environment
-
Sawik, T. (2009a). Multi-objective due-date setting in a make-to-order environment, International Journal of Production Research 47(22), 6205-6231.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.22
, pp. 6205-6231
-
-
Sawik, T.1
-
170
-
-
67651187320
-
Monolithic versus hierarchical approach to integrated scheduling in a supply chain
-
Sawik, T. (2009b). Monolithic versus hierarchical approach to integrated scheduling in a supply chain, International Journal of Production Research 47(21), 5881-5910.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.21
, pp. 5881-5910
-
-
Sawik, T.1
-
172
-
-
70649097283
-
Single vs. multiple objective supplier selection in a make to order environment
-
Sawik, T. (2010a). Single vs. multiple objective supplier selection in a make to order environment, Omega: The International Journal of Management Science 38(3-4), 203-212.
-
(2010)
Omega: The International Journal of Management Science
, vol.38
, Issue.3-4
, pp. 203-212
-
-
Sawik, T.1
-
173
-
-
84886215970
-
A bi-objective supply chain scheduling
-
In K.D. Lawrence, R.K. Klimberg and V.M. Miori, Eds., The Supply Chain in Manufacturing, Distribution, and Transportation: Modeling, Optimization, and Applications. CRC Press, Boca Raton, FL
-
Sawik, T. (2010b). A bi-objective supply chain scheduling. In K.D. Lawrence, R.K. Klimberg and V.M. Miori, Eds., The Supply Chain in Manufacturing, Distribution, and Transportation: Modeling, Optimization, and Applications. CRC Press, Boca Raton, FL.
-
(2010)
-
-
Sawik, T.1
-
175
-
-
78049432046
-
Selection of a dynamic supply portfolio in make-to-order environment with risks
-
Sawik, T. (2011b). Selection of a dynamic supply portfolio in make-to-order environment with risks, Computers & Operations Research 38(4), 782-796.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.4
, pp. 782-796
-
-
Sawik, T.1
-
176
-
-
0000102622
-
Issues in loading and scheduling of SMT lines
-
Sawik, T., A. Schaller and T.M. Tirpak (2000). Issues in loading and scheduling of SMT lines, Zeszyty Naukowe PolitechnikiŚ laskiej, Automatyka, no. 129, 331-341.
-
(2000)
Zeszyty Naukowe PolitechnikiŚ laskiej, Automatyka
, vol.129
, pp. 331-341
-
-
Sawik, T.1
Schaller, A.2
Tirpak, T.M.3
-
177
-
-
0035295251
-
Scheduling of printed wiring board assembly in surface mount technology lines
-
Sawik, T., A. Schaller and T.M. Tirpak (2002). Scheduling of printed wiring board assembly in surface mount technology lines, Journal of Electronics Manufacturing, special issue on Production Planning and Scheduling in Electronics Manufacturing 11(1), 1-17.
-
(2002)
Journal of Electronics Manufacturing, special issue on Production Planning and Scheduling in Electronics Manufacturing
, vol.11
, Issue.1
, pp. 1-17
-
-
Sawik, T.1
Schaller, A.2
Tirpak, T.M.3
-
179
-
-
0004212411
-
Hierarchies in Distributed Decision Making
-
Springer-Verlag, Berlin
-
Schneeweiss, Ch. (1999). Hierarchies in Distributed Decision Making, Springer-Verlag, Berlin.
-
(1999)
-
-
Schneeweiss, C.H.1
-
181
-
-
0003545561
-
Balancing and Sequencing of Assembly Lines
-
Physica-Verlag, Heidelberg
-
Scholl, A. (1999). Balancing and Sequencing of Assembly Lines. Physica-Verlag, Heidelberg.
-
(1999)
-
-
Scholl, A.1
-
182
-
-
34447512145
-
Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains
-
Springer, New York
-
Shanthikumar, J.G., D.D. Yao, W. Henk and M. Zijm, Eds. (2003). Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains. Springer, New York.
-
(2003)
-
-
Shanthikumar, J.G.1
Yao, D.D.2
Henk, W.3
Zijm, M.4
-
183
-
-
77957088268
-
Mathematical programming models and methods for production planning and scheduling
-
In S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin, Eds., Handbook in Operations Research and Management Science: Logistics of Production and Inventory. North-Holland, Amsterdam
-
Shapiro, J.F. (1993). Mathematical programming models and methods for production planning and scheduling. In S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin, Eds., Handbook in Operations Research and Management Science: Logistics of Production and Inventory. North-Holland, Amsterdam.
-
(1993)
-
-
Shapiro, J.F.1
-
184
-
-
0003913375
-
Modeling the Supply Chain
-
Duxbury Press, Pacific Grove, CA
-
Shapiro, J.F. (2001). Modeling the Supply Chain. Duxbury Press, Pacific Grove, CA.
-
(2001)
-
-
Shapiro, J.F.1
-
185
-
-
33745077705
-
The Resilient Enterprise
-
MIT Press, Cambridge, MA
-
Sheffi, Y. (2005). The Resilient Enterprise. MIT Press, Cambridge, MA.
-
(2005)
-
-
Sheffi, Y.1
-
186
-
-
0003398158
-
Inventory Management and Production Planning and Scheduling
-
John Wiley & Sons, New York
-
Silver, E.A., D.F. Pyke and R. Petersen (1998). Inventory Management and Production Planning and Scheduling. John Wiley & Sons, New York.
-
(1998)
-
-
Silver, E.A.1
Pyke, D.F.2
Petersen, R.3
-
187
-
-
0030084767
-
Selecting jobs for a heavily loaded shop with lateness penalties
-
Slotnick, S.A. and T.E. Morton (1996). Selecting jobs for a heavily loaded shop with lateness penalties, Computers & Operations Research 23(2), 131-140.
-
(1996)
Computers & Operations Research
, vol.23
, Issue.2
, pp. 131-140
-
-
Slotnick, S.A.1
Morton, T.E.2
-
189
-
-
0003347730
-
Reactive scheduling systems
-
In D.E. Brown and W.T. Scherer, Eds., Intelligent Scheduling Systems. Kluwer Academic Publishers, Boston
-
Smith, S.F. (1995). Reactive scheduling systems, In D.E. Brown and W.T. Scherer, Eds., Intelligent Scheduling Systems. Kluwer Academic Publishers, Boston, 155-192.
-
(1995)
, pp. 155-192
-
-
Smith, S.F.1
-
190
-
-
10444237299
-
Supply chain management and advanced planning-basics, overview and challenges
-
Stadtler, H. (2005). Supply chain management and advanced planning-basics, overview and challenges, European Journal of Operational Research 163, 575-588.
-
(2005)
European Journal of Operational Research
, vol.163
, pp. 575-588
-
-
Stadtler, H.1
-
191
-
-
0003709653
-
Multiple Criteria Optimization: Theory, Computation, and Applications
-
John Wiley & Sons, New York
-
Steuer, R.E. (1986). Multiple Criteria Optimization: Theory, Computation, and Applications. John Wiley & Sons, New York.
-
(1986)
-
-
Steuer, R.E.1
-
192
-
-
0031275053
-
98%-effective lot-sizing for assembly inventory systems with backlogging
-
Sun, D. and D. Atkins (1997). 98%-effective lot-sizing for assembly inventory systems with backlogging, Operations Research 45, 940-951.
-
(1997)
Operations Research
, vol.45
, pp. 940-951
-
-
Sun, D.1
Atkins, D.2
-
193
-
-
0344320671
-
A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources
-
Sun, J. and D. Xue (2001). A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources, Computers in Industry 46, 189-207.
-
(2001)
Computers in Industry
, vol.46
, pp. 189-207
-
-
Sun, J.1
Xue, D.2
-
194
-
-
0242622203
-
The Theory and Practice of Revenue Management
-
Kluwer Academic Publishers, Boston
-
Talluri, K.T. and G.J. van Ryzin (2004). The Theory and Practice of Revenue Management. Kluwer Academic Publishers, Boston.
-
(2004)
-
-
Talluri, K.T.1
Van Ryzin, G.J.2
-
196
-
-
0000857408
-
A Lagrangian-based heuristic for dynamic multi-level, multi-item constrained lot sizing with setup times
-
Tempelmeier, H. and M.C. Derstroff (1996). A Lagrangian-based heuristic for dynamic multi-level, multi-item constrained lot sizing with setup times, Management Science 42(5), 738-747.
-
(1996)
Management Science
, vol.42
, Issue.5
, pp. 738-747
-
-
Tempelmeier, H.1
Derstroff, M.C.2
-
198
-
-
0034171986
-
Design-to-manufacturing information management for electronics assembly
-
Tirpak, T.M. (2000). Design-to-manufacturing information management for electronics assembly, International Journal of Flexible Manufacturing Systems 12(2), 189-205.
-
(2000)
International Journal of Flexible Manufacturing Systems
, vol.12
, Issue.2
, pp. 189-205
-
-
Tirpak, T.M.1
-
200
-
-
0027845081
-
Simultaneous scheduling of machines and automated guided vehicles
-
Ulusoy, G. and U. Bilge (1993). Simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Research 31, 2857-2873.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2857-2873
-
-
Ulusoy, G.1
Bilge, U.2
-
201
-
-
0002646371
-
Conditional value-at-risk: Optimization algorithms and applications
-
February
-
Uryasev, S. (2000). Conditional value-at-risk: Optimization algorithms and applications, Financial Engineering News 14, February, 1-5.
-
(2000)
Financial Engineering News
, vol.14
, pp. 1-5
-
-
Uryasev, S.1
-
202
-
-
34848824987
-
An integrated multi-objective decision making process for multi-period lot sizing with supplier selection
-
Ustun, O. and E.A. Demirtas (2008). An integrated multi-objective decision making process for multi-period lot sizing with supplier selection, Omega: The International Journal of Management Science 36, 509-521.
-
(2008)
Omega: The International Journal of Management Science
, vol.36
, pp. 509-521
-
-
Ustun, O.1
Demirtas, E.A.2
-
204
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies and methods
-
Vieira, G.E., J.W. Herrman and E. Lin (2003). Rescheduling manufacturing systems: A framework of strategies, policies and methods, Journal of Scheduling 6(1), 39-62.
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 39-62
-
-
Vieira, G.E.1
Herrman, J.W.2
Lin, E.3
-
205
-
-
0033284730
-
Hybrid flowshop scheduling problems: State of the art
-
Vignier, A., J.C. Billaut and C. Proust (1999). Hybrid flowshop scheduling problems: State of the art, Rairo-Recherche Operationnelle-Operations Research 33(2), 117-183.
-
(1999)
Rairo-Recherche Operationnelle-Operations Research
, vol.33
, Issue.2
, pp. 117-183
-
-
Vignier, A.1
Billaut, J.C.2
Proust, C.3
-
206
-
-
10444242860
-
Introduction to Computational Optimization Models for Production Planning in a Supply Chain
-
Springer-Verlag, Berlin
-
Voss, S. and D.L. Woodruff (2003). Introduction to Computational Optimization Models for Production Planning in a Supply Chain, Springer-Verlag, Berlin.
-
(2003)
-
-
Voss, S.1
Woodruff, D.L.2
-
207
-
-
0000518993
-
An integer linearprogramming model for machine scheduling
-
Wagner, H.M. (1959). An integer linearprogramming model for machine scheduling, Naval Research Logistics Quarterly 6, 131-140.
-
(1959)
Naval Research Logistics Quarterly
, vol.6
, pp. 131-140
-
-
Wagner, H.M.1
-
208
-
-
33745220037
-
Flexible flowshop scheduling: Optimum, heuristics and artificial intelligence solutions
-
Wang, H. (2005). Flexible flowshop scheduling: Optimum, heuristics and artificial intelligence solutions, Expert Systems 22(2), 78-85.
-
(2005)
Expert Systems
, vol.22
, Issue.2
, pp. 78-85
-
-
Wang, H.1
-
209
-
-
0033316498
-
Optimization of high-speed multistation SMT placement machines using evolutionary algorithms
-
Wang, W., P.C. Nelson and T.M. Tirpak (2000). Optimization of high-speed multistation SMT placement machines using evolutionary algorithms, IEEE Transactions on Electronics Packaging Manufacturing 22(2), 137-146.
-
(2000)
IEEE Transactions on Electronics Packaging Manufacturing
, vol.22
, Issue.2
, pp. 137-146
-
-
Wang, W.1
Nelson, P.C.2
Tirpak, T.M.3
-
211
-
-
0026880663
-
Order acceptance strategies in a production-to-order environment with setup times and due dates
-
Wester, F.A.W., J. Wijngaard and W.H.M. Zijm (1992). Order acceptance strategies in a production-to-order environment with setup times and due dates, International Journal of Production Research 30(4), 1313-1326.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.4
, pp. 1313-1326
-
-
Wester, F.A.W.1
Wijngaard, J.2
Zijm, W.H.M.3
-
212
-
-
84974875749
-
Alternative formulations of a flow-shop scheduling problem
-
Wilson, J.M. (1989). Alternative formulations of a flow-shop scheduling problem, Journal of the Operational Research Society 40, 395-399.
-
(1989)
Journal of the Operational Research Society
, vol.40
, pp. 395-399
-
-
Wilson, J.M.1
-
214
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock, R.J. (1988). An adaptable scheduling algorithm for flexible flow lines, Operations Research 36, 445-453.
-
(1988)
Operations Research
, vol.36
, pp. 445-453
-
-
Wittrock, R.J.1
-
215
-
-
0004180332
-
Integer Programming
-
John Wiley & Sons, New York
-
Wolsey, L.A. (1998). Integer Programming, John Wiley & Sons, New York.
-
(1998)
-
-
Wolsey, L.A.1
-
216
-
-
46849113224
-
Supply chain risk, simulation, and vendor selection
-
Wu, D. and D.L. Olson (2008). Supply chain risk, simulation, and vendor selection, International Journal of Production Economics 114, 646-655.
-
(2008)
International Journal of Production Economics
, vol.114
, pp. 646-655
-
-
Wu, D.1
Olson, D.L.2
-
217
-
-
33751509315
-
Supplier selection with multiple criteria in volume discount environments
-
Xia, W. and Z. Wu (2007). Supplier selection with multiple criteria in volume discount environments, Omega: The International Journal of Management Science 35, 494-504.
-
(2007)
Omega: The International Journal of Management Science
, vol.35
, pp. 494-504
-
-
Xia, W.1
Wu, Z.2
-
218
-
-
56549091922
-
Single or dual sourcing: Decision-making in the presence of supply chain disruption risks
-
Yu, H., A.Z. Zeng and L. Zhao (2009). Single or dual sourcing: Decision-making in the presence of supply chain disruption risks, Omega: The International Journal of Management Science 37, 788-800.
-
(2009)
Omega: The International Journal of Management Science
, vol.37
, pp. 788-800
-
-
Yu, H.1
Zeng, A.Z.2
Zhao, L.3
-
219
-
-
70649087042
-
Selecting sourcing partners for a make-to-order supply chain
-
Yue, J., Y. Xia and T. Tran (2010). Selecting sourcing partners for a make-to-order supply chain, Omega: The International Journal of Management Science 38(3-4), 136-144.
-
(2010)
Omega: The International Journal of Management Science
, vol.38
, Issue.3-4
, pp. 136-144
-
-
Yue, J.1
Xia, Y.2
Tran, T.3
-
220
-
-
0003860705
-
Foundations of Inventory Management
-
McGraw-Hill, New York
-
Zipkin, P.H. (2000). Foundations of Inventory Management, McGraw-Hill, New York.
-
(2000)
-
-
Zipkin, P.H.1
-
221
-
-
39649122099
-
Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis
-
Zorzini, M., D. Corti and A. Pozzetti (2008). Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis, International Journal of Production Economics 112, 919-933.
-
(2008)
International Journal of Production Economics
, vol.112
, pp. 919-933
-
-
Zorzini, M.1
Corti, D.2
Pozzetti, A.3
|