|
Volumn 143, Issue 1, 2002, Pages 115-124
|
Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
|
Author keywords
Balancing; Flexible manufacturing systems; Mixed integer programming; Scheduling
|
Indexed keywords
COMPUTER AIDED ANALYSIS;
FLEXIBLE MANUFACTURING SYSTEMS;
INTEGER PROGRAMMING;
SCHEDULING;
FLEXIBLE ASSEMBLY LINE (FAL);
OPERATIONS RESEARCH;
|
EID: 0037121160
PISSN: 03772217
EISSN: None
Source Type: Journal
DOI: 10.1016/S0377-2217(01)00328-9 Document Type: Article |
Times cited : (63)
|
References (10)
|