메뉴 건너뛰기




Volumn 143, Issue 1, 2002, Pages 115-124

Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line

Author keywords

Balancing; Flexible manufacturing systems; Mixed integer programming; Scheduling

Indexed keywords

COMPUTER AIDED ANALYSIS; FLEXIBLE MANUFACTURING SYSTEMS; INTEGER PROGRAMMING; SCHEDULING;

EID: 0037121160     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(01)00328-9     Document Type: Article
Times cited : (63)

References (10)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.