메뉴 건너뛰기




Volumn 100, Issue 1, 1997, Pages 170-179

Finite-capacity scheduling-based planning for revenue-based capacity management

Author keywords

Planning; Production; Scheduling; Simulation

Indexed keywords

COMPUTER SIMULATION; COST EFFECTIVENESS; HEURISTIC METHODS; INDUSTRIAL MANAGEMENT; PLANNING; PRODUCTION; RESOURCE ALLOCATION;

EID: 0031189321     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(96)00021-5     Document Type: Article
Times cited : (32)

References (7)
  • 3
    • 0042509979 scopus 로고
    • Under fire: Lessons from the front
    • Gray, D.A. (1994), "Under fire: Lessons from the front", OR/MS Today 21/5, 18-23.
    • (1994) OR/MS Today , vol.21 , Issue.5 , pp. 18-23
    • Gray, D.A.1
  • 5
    • 0023833632 scopus 로고
    • MRP 96: Time to rethink manufacturing logistics
    • 2nd Quarter
    • Kanet, J.J. (1988), "MRP 96: Time to rethink manufacturing logistics", Production and Inventory Management Journal, 2nd Quarter, 57-61.
    • (1988) Production and Inventory Management Journal , pp. 57-61
    • Kanet, J.J.1
  • 6
    • 0025488846 scopus 로고
    • The electronic leitstand: A new tool for shop scheduling
    • Kanet, J.J., and Sridharan, V. (1990), "The electronic leitstand: A new tool for shop scheduling", Manufacturing Review 3/3, 161-170.
    • (1990) Manufacturing Review , vol.3 , Issue.3 , pp. 161-170
    • Kanet, J.J.1    Sridharan, V.2
  • 7
    • 0025433556 scopus 로고
    • Medium to short term finite capacity scheduling: A planning methodology for capacity constrained workshops
    • McCarthy, S.W., and Barber, K.D. (1990), "Medium to short term finite capacity scheduling: A planning methodology for capacity constrained workshops", Engineering Costs and Production Economics 19, 189-199.
    • (1990) Engineering Costs and Production Economics , vol.19 , pp. 189-199
    • McCarthy, S.W.1    Barber, K.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.