-
1
-
-
0030219108
-
'Just-in-time' production of large assemblies
-
Agrawal A., Harhalakis G., Minis I., and Nagi R. 'Just-in-time' production of large assemblies. IIE Transactions 28 8 (1996) 653-667
-
(1996)
IIE Transactions
, vol.28
, Issue.8
, pp. 653-667
-
-
Agrawal, A.1
Harhalakis, G.2
Minis, I.3
Nagi, R.4
-
2
-
-
0021428250
-
An integrated model for master scheduling, lot sizing and capacity requirements planning
-
Bahl A.C., and Ritzman L.P. An integrated model for master scheduling, lot sizing and capacity requirements planning. Journal of the Operational Research Society 35 5 (1984) 389-399
-
(1984)
Journal of the Operational Research Society
, vol.35
, Issue.5
, pp. 389-399
-
-
Bahl, A.C.1
Ritzman, L.P.2
-
3
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker R., and Scudder G.D. Sequencing with earliness and tardiness penalties: A review. Operation Research 38 1 (1990) 22-36
-
(1990)
Operation Research
, vol.38
, Issue.1
, pp. 22-36
-
-
Baker, R.1
Scudder, G.D.2
-
4
-
-
0020832935
-
Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
-
Billington P.J., McClain J.D., and Thomas L.J. Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction. Management Science 29 10 (1983) 1126-1141
-
(1983)
Management Science
, vol.29
, Issue.10
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.D.2
Thomas, L.J.3
-
5
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng T.C.E., and Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38 2 (1989) 156-166
-
(1989)
European Journal of Operational Research
, vol.38
, Issue.2
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
6
-
-
0028413489
-
Scheduling products with bills of materials using an improved Lagrangian relaxation technique
-
Czerwinski C.S., and Luh P.B. Scheduling products with bills of materials using an improved Lagrangian relaxation technique. IEEE Transactions on Robotics and Automation 10 2 (1994) 99-111
-
(1994)
IEEE Transactions on Robotics and Automation
, vol.10
, Issue.2
, pp. 99-111
-
-
Czerwinski, C.S.1
Luh, P.B.2
-
7
-
-
0028769399
-
On practical resource allocation for production planning and scheduling with period overlapping setups
-
Dillenberger C., Escudero L.F., Wollensak A., and Zhang W. On practical resource allocation for production planning and scheduling with period overlapping setups. European Journal of Operational Research 75 2 (1994) 275-286
-
(1994)
European Journal of Operational Research
, vol.75
, Issue.2
, pp. 275-286
-
-
Dillenberger, C.1
Escudero, L.F.2
Wollensak, A.3
Zhang, W.4
-
8
-
-
0023343801
-
Scheduling tasks with due dates in a fabrication/assembly process
-
Faaland B., and Schmitt T. Scheduling tasks with due dates in a fabrication/assembly process. Operations Research 35 3 (1987) 378-388
-
(1987)
Operations Research
, vol.35
, Issue.3
, pp. 378-388
-
-
Faaland, B.1
Schmitt, T.2
-
9
-
-
0037118177
-
A survey of the state-of-the-art of common due date assignment and scheduling research
-
Gordon V., Proth J.M., and Chu C.B. A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research 139 1 (2002) 1-25
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.1
, pp. 1-25
-
-
Gordon, V.1
Proth, J.M.2
Chu, C.B.3
-
10
-
-
0020206915
-
Schedule based MRP: An integrated approach to production scheduling and material requirements planning
-
Hastings N.A.J., Marshall P., and Willis R.J. Schedule based MRP: An integrated approach to production scheduling and material requirements planning. Journal of the Operational Research Society 3 11 (1982) 1021-1029
-
(1982)
Journal of the Operational Research Society
, vol.3
, Issue.11
, pp. 1021-1029
-
-
Hastings, N.A.J.1
Marshall, P.2
Willis, R.J.3
-
11
-
-
0030244109
-
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
-
Kim J.U., and Kim Y.D. Simulated annealing and genetic algorithms for scheduling products with multi-level product structure. Computers and Operations Research 23 9 (1996) 857-868
-
(1996)
Computers and Operations Research
, vol.23
, Issue.9
, pp. 857-868
-
-
Kim, J.U.1
Kim, Y.D.2
-
12
-
-
0034516883
-
Integration of assembly and fabrication for make-to-order production
-
Kolish R. Integration of assembly and fabrication for make-to-order production. International Journal of Production Economics 38 3 (2000) 287-306
-
(2000)
International Journal of Production Economics
, vol.38
, Issue.3
, pp. 287-306
-
-
Kolish, R.1
-
13
-
-
0000429764
-
An integrated model for job-shop planning and scheduling
-
Lasserre J.B. An integrated model for job-shop planning and scheduling. Management Science 38 8 (1992) 1201-1211
-
(1992)
Management Science
, vol.38
, Issue.8
, pp. 1201-1211
-
-
Lasserre, J.B.1
-
14
-
-
3142777327
-
Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
-
Moon C., Kim J.S., and Gen M. Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research 42 15 (2004) 2941-2955
-
(2004)
International Journal of Production Research
, vol.42
, Issue.15
, pp. 2941-2955
-
-
Moon, C.1
Kim, J.S.2
Gen, M.3
-
15
-
-
0141636312
-
The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
-
Pongcharoen P., Hicks C., and Braiden P.M. The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure. European Journal of Operational Research 152 1 (2004) 215-225
-
(2004)
European Journal of Operational Research
, vol.152
, Issue.1
, pp. 215-225
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
-
16
-
-
84990557283
-
A new framework for manufacturing planning and control systems
-
Sum C.C., and Hill A.V. A new framework for manufacturing planning and control systems. Decision Sciences 24 4 (1993) 739-760
-
(1993)
Decision Sciences
, vol.24
, Issue.4
, pp. 739-760
-
-
Sum, C.C.1
Hill, A.V.2
-
17
-
-
0031126052
-
Integrating MRP and finite capacity planning
-
Taal M., and Wortmann J.C. Integrating MRP and finite capacity planning. Production Planning and Control 8 3 (1997) 245-254
-
(1997)
Production Planning and Control
, vol.8
, Issue.3
, pp. 245-254
-
-
Taal, M.1
Wortmann, J.C.2
-
19
-
-
0029346791
-
Earliness/tardiness production planning approaches for manufacturing systems
-
Wang D.W. Earliness/tardiness production planning approaches for manufacturing systems. Computers and Industrial Engineering 28 3 (1995) 425-436
-
(1995)
Computers and Industrial Engineering
, vol.28
, Issue.3
, pp. 425-436
-
-
Wang, D.W.1
|