-
1
-
-
0041763613
-
On 2 × n sequencing problem with transportation times of jobs
-
Maggu PL, Das G. On 2 × n sequencing problem with transportation times of jobs. Pure and Applied Mathematika Sciences 1980; 12:1-6.
-
(1980)
Pure and Applied Mathematika Sciences
, vol.12
, pp. 1-6
-
-
Maggu, P.L.1
Das, G.2
-
2
-
-
0003075019
-
Optimal two- And three-stage production schedules with setup times included
-
Johnson SM. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1954; 1:61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
3
-
-
0041587599
-
On equivalent job-for-job block in 2 × n sequencing problem with transportation times
-
Maggu PL, Das G, Kumar R. On equivalent job-for-job block in 2 × n sequencing problem with transportation times. Journal of the OR Society of Japan 1981; 24:136-146.
-
(1981)
Journal of the or Society of Japan
, vol.24
, pp. 136-146
-
-
Maggu, P.L.1
Das, G.2
Kumar, R.3
-
4
-
-
0039140289
-
On an automated two-machine flowshop scheduling problem with infinite buffer
-
Kise H. On an automated two-machine flowshop scheduling problem with infinite buffer. Journal of the Operations Research Society of Japan 1991; 34:354-361.
-
(1991)
Journal of the Operations Research Society of Japan
, vol.34
, pp. 354-361
-
-
Kise, H.1
-
7
-
-
0026188481
-
Scheduling of a two-machine flowshop with travel time between machines
-
Panwalkar SS. Scheduling of a two-machine flowshop with travel time between machines. Journal of the Operational Research Society 1991; 42:609-613.
-
(1991)
Journal of the Operational Research Society
, vol.42
, pp. 609-613
-
-
Panwalkar, S.S.1
-
9
-
-
0001551888
-
Sequencing n jobs on two machines with arbitrary time lags
-
Mitten LG. Sequencing n jobs on two machines with arbitrary time lags. Management Science 1959; 5: 293-298.
-
(1959)
Management Science
, vol.5
, pp. 293-298
-
-
Mitten, L.G.1
-
10
-
-
0344427188
-
On n-job, 2-machine flow-shop scheduling problem with arbitrary time lags and transportation times of jobs
-
Maggu PL, Singhal ML, Mohammad N, Yadav SK. On n-job, 2-machine flow-shop scheduling problem with arbitrary time lags and transportation times of jobs. Journal of the OR Society of Japan 1982; 25:219-227.
-
(1982)
Journal of the or Society of Japan
, vol.25
, pp. 219-227
-
-
Maggu, P.L.1
Singhal, M.L.2
Mohammad, N.3
Yadav, S.K.4
-
11
-
-
0023379505
-
Interstage transportation planning in the deterministic flow-shop environment
-
Langston MA. Interstage transportation planning in the deterministic flow-shop environment. Operations Research 1987; 35:556-564.
-
(1987)
Operations Research
, vol.35
, pp. 556-564
-
-
Langston, M.A.1
-
13
-
-
0001662666
-
Analysis of a heuristic for one machine sequencing with release dates and delivery times
-
Potts CM. Analysis of a heuristic for one machine sequencing with release dates and delivery times. Operations Research 1980; 28:1436-1441.
-
(1980)
Operations Research
, vol.28
, pp. 1436-1441
-
-
Potts, C.M.1
-
14
-
-
0003162664
-
Jackson's rule for single-machine scheduling: Making a good heuristic better
-
Hall LA, Shmoys DB. Jackson's rule for single-machine scheduling: making a good heuristic better. Mathematics of Operations Research 1992; 17:22-35.
-
(1992)
Mathematics of Operations Research
, vol.17
, pp. 22-35
-
-
Hall, L.A.1
Shmoys, D.B.2
-
15
-
-
21844520793
-
Heuristics for parallel machine scheduling with delivery times
-
Woeginger GJ. Heuristics for parallel machine scheduling with delivery times. Acta Informatica 1994; 31:503-512.
-
(1994)
Acta Informatica
, vol.31
, pp. 503-512
-
-
Woeginger, G.J.1
-
16
-
-
0027906623
-
On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date
-
Herrmann JW, Lee C-Y. On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date. European Journal of Operational Research 1993; 70:272-288.
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 272-288
-
-
Herrmann, J.W.1
Lee, C.-Y.2
-
17
-
-
0030216821
-
Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
-
Chen Z-L. Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs. European Journal of Operational Research 1996; 93:49-60.
-
(1996)
European Journal of Operational Research
, vol.93
, pp. 49-60
-
-
Chen, Z.-L.1
-
19
-
-
0030270406
-
A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs
-
Yuan J. A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs. European Journal of Operational Research 1996; 94:203-205.
-
(1996)
European Journal of Operational Research
, vol.94
, pp. 203-205
-
-
Yuan, J.1
-
21
-
-
0041587598
-
Simultaneous scheduling of machines and material handling devices in automated manufacturing
-
Stecke KE, Suri R (eds). Elsevier: Amsterdam
-
Raman N, Talbot FB, Rachamadugu RV. Simultaneous scheduling of machines and material handling devices in automated manufacturing. In Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Stecke KE, Suri R (eds). Elsevier: Amsterdam, 1986; 455-465.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 455-465
-
-
Raman, N.1
Talbot, F.B.2
Rachamadugu, R.V.3
-
22
-
-
0041656168
-
Dynamic scheduling of automated guided vehicles for a certain class of systems
-
Jaikumar R, Solomon MM. Dynamic scheduling of automated guided vehicles for a certain class of systems. Journal of Manufacturing Systems 1990; 9:315-323.
-
(1990)
Journal of Manufacturing Systems
, vol.9
, pp. 315-323
-
-
Jaikumar, R.1
Solomon, M.M.2
-
23
-
-
0026124166
-
Automated two-machine flowshop scheduling: A solvable case
-
Kise H, Shioyama T, Ibaraki T. Automated two-machine flowshop scheduling: a solvable case. IIE Transactions 1991; 23:10-16.
-
(1991)
IIE Transactions
, vol.23
, pp. 10-16
-
-
Kise, H.1
Shioyama, T.2
Ibaraki, T.3
-
24
-
-
0029491089
-
Flowshop scheduling of robotic cells with job-dependent transportation and set-up effects
-
Levner E, Kogan K, Maimon M. Flowshop scheduling of robotic cells with job-dependent transportation and set-up effects. Journal of the Operational Research Society 1995; 46:1447-1455.
-
(1995)
Journal of the Operational Research Society
, vol.46
, pp. 1447-1455
-
-
Levner, E.1
Kogan, K.2
Maimon, M.3
-
25
-
-
0029404820
-
A time window approach to simultaneous scheduling of machines and material handling systems in an FMS
-
Bilge U, Ulusoy G. A time window approach to simultaneous scheduling of machines and material handling systems in an FMS. Operations Research 1995; 43:1058-1070.
-
(1995)
Operations Research
, vol.43
, pp. 1058-1070
-
-
Bilge, U.1
Ulusoy, G.2
-
26
-
-
0030289711
-
Lot scheduling in a two-machine cell with swapping devices
-
Agnetis A, Pacciarelli D, Rossi F. Lot scheduling in a two-machine cell with swapping devices. IIE Transactions 1996; 28:911-917.
-
(1996)
IIE Transactions
, vol.28
, pp. 911-917
-
-
Agnetis, A.1
Pacciarelli, D.2
Rossi, F.3
-
31
-
-
0348125053
-
Machine scheduling with transportation considerations
-
Department of Systems Engineering, University of Pennsylvania
-
Lee C-Y, Chen Z-L. Machine scheduling with transportation considerations. Working Paper, # 98-08, Department of Systems Engineering, University of Pennsylvania, 1998.
-
(1998)
Working Paper, # 98-08
, vol.98
, Issue.8
-
-
Lee, C.-Y.1
Chen, Z.-L.2
|