메뉴 건너뛰기




Volumn 8, Issue 1, 1997, Pages 31-36

Integrated procurement- production system in a just-in-time environment-modelling and analysis

Author keywords

Integration; Modelling; Procurement; Production

Indexed keywords

COST EFFECTIVENESS; MATHEMATICAL MODELS; OPTIMIZATION; PRODUCTION; PURCHASING; SCHEDULING;

EID: 0030783235     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372897235532     Document Type: Article
Times cited : (12)

References (16)
  • 1
    • 0001887653 scopus 로고
    • Economic lot size determination in multi-stage assembly systems
    • Crowston, W. B., Wagner, M., and Williams, J. F., 1973, Economic lot size determination in multi-stage assembly systems. Management Science, 19, 517-527.
    • (1973) Management Science , vol.19 , pp. 517-527
    • Crowston, W.B.1    Wagner, M.2    Williams, J.F.3
  • 4
    • 0022566175 scopus 로고
    • Use of GPSS/PC to establish manning level of proposed JIT production facility
    • FELLERS, G., 1986, Use of GPSS/PC to establish manning level of proposed JIT production facility. Computers and Industrial Engineering, 11, 382-384.
    • (1986) Computers and Industrial Engineering , vol.11 , pp. 382-384
    • Fellers, G.1
  • 9
    • 0024715832 scopus 로고
    • Integrated inventory models: The buyer-vendor coordination
    • GOYAL, S. K., and GUPTA, Y. P., 1989, Integrated inventory models: the buyer-vendor coordination. European Journal of Operations Research, 41, 261-269.
    • (1989) European Journal of Operations Research , vol.41 , pp. 261-269
    • Goyal, S.K.1    Gupta, Y.P.2
  • 10
    • 0003449926 scopus 로고
    • Cambridge, MA: Industrial Engineering and Management Press)
    • MONDEN, Y., 1983, Toyota Production System (Cambridge, MA: Industrial Engineering and Management Press).
    • (1983) Toyota Production System
    • Monden, Y.1
  • 11
    • 0025262876 scopus 로고
    • A mathematical programming approach for determining workcentre lotsizes in a JIT system with signal kanbans
    • Philipoom, P. R., Rees, L. P., Taylor, B. W., and Huang, P. Y., 1990, A mathematical programming approach for determining workcentre lotsizes in a JIT system with signal kanbans. International Journal of Production Research, 28, 1-15.
    • (1990) International Journal of Production Research , vol.28 , pp. 1-15
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3    Huang, P.Y.4
  • 12
    • 0025261570 scopus 로고
    • Recasting the traditional inventory model to implement just-in-time purchasing
    • First quarter
    • RAMASHESH, R. V., 1990, Recasting the traditional inventory model to implement just-in-time purchasing. Production and Inventory Management Journal, First quarter, 71-75.
    • (1990) Production and Inventory Management Journal , pp. 71-75
    • Ramashesh, R.V.1
  • 13
    • 0022111332 scopus 로고
    • JIT with kanban manufacturing system simulation on a microcomputer
    • SCHROER, B. J., BLACH, J. T., and ZHANG, S. X., 1985, JIT with kanban manufacturing system simulation on a microcomputer. Simulation, 45, 52-70.
    • (1985) Simulation , vol.45 , pp. 52-70
    • Schroer, B.J.1    Blach, J.T.2    Zhang, S.X.3
  • 14
    • 0001199473 scopus 로고
    • Optimal and system myopic policies for multi-echelon production/inventory assembly systems
    • SCHWARZ, L. B., and SCHRAGE, L., 1975, Optimal and system myopic policies for multi-echelon production/inventory assembly systems. Management Science, 21, 1285-1294.
    • (1975) Management Science , vol.21 , pp. 1285-1294
    • Schwarz, L.B.1    Schrage, L.2
  • 15
    • 0025243881 scopus 로고
    • Deliberately slowing down output in a family production context
    • SILVER, E. A., 1990, Deliberately slowing down output in a family production context. International Journal of Production Research, 28, 17-27.
    • (1990) International Journal of Production Research , vol.28 , pp. 17-27
    • Silver, E.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.