메뉴 건너뛰기




Volumn 11, Issue 1, 2002, Pages 1-17

Scheduling of printed wiring board assembly in surface mount technology lines

Author keywords

Blocking scheduling; Electronics manufacturing; Flexible assembly lines; Mixed integer programming

Indexed keywords

ELECTRONICS INDUSTRY; INTEGER PROGRAMMING; MATHEMATICAL MODELS; NUMERICAL ANALYSIS; OPTIMIZATION; PRINTED CIRCUIT MANUFACTURE; SCHEDULING; SURFACE MOUNT TECHNOLOGY;

EID: 0035295251     PISSN: 09603131     EISSN: None     Source Type: Journal    
DOI: 10.1142/S096031310200028X     Document Type: Article
Times cited : (13)

References (26)
  • 22
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data - Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
    • (1999) Int. J. Production Res. , vol.37 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2
  • 23
    • 0033355662 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data - Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment
    • (1999) Int. J. Production Res. , vol.37 , pp. 4105-4117
    • Shafaei, R.1    Brunn, P.2
  • 24
    • 0034627943 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data - Part 3: A framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule
    • (2000) Int. J. Production Res. , vol.38 , pp. 85-99
    • Shafaei, R.1    Brunn, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.