-
1
-
-
0019562318
-
A guaranteed-accuracy round-ofT algorithm for cyclic scheduling and set covering
-
Bartholdi, J.J. (1981) A guaranteed-accuracy round-ofT algorithm for cyclic scheduling and set covering. Operations Research, 29(3), 501-510.
-
(1981)
Operations Research
, vol.29
, Issue.3
, pp. 501-510
-
-
Bartholdi, J.J.1
-
2
-
-
0000410538
-
Scheduling of re-entrant flowshops
-
Graves, S.C., Meal, H.C., Stefak, D. and Zeghmi, A.H. (1983) Scheduling of re-entrant flowshops. Journal of Operations Management, 3, 197-207.
-
(1983)
Journal of Operations Management
, vol.3
, pp. 197-207
-
-
Graves, S.C.1
Meal, H.C.2
Stefak, D.3
Zeghmi, A.H.4
-
3
-
-
0010906391
-
-
Technical report 956, SORIE, Cornell University, Ithaca, NY.
-
Rao, U.S. and Jackson, P.L. Subproblems in identical job cyclic scheduling: properties, complexity, and solution approaches. Technical report 956, SORIE, Cornell University, Ithaca, NY.
-
Subproblems in Identical Job Cyclic Scheduling: Properties, Complexity, and Solution Approaches.
-
-
Rao, U.S.1
Jackson, P.L.2
-
4
-
-
0000885127
-
Cyclic schedules for job shops with identical jobs
-
Roundy, R.O. (1992) Cyclic schedules for job shops with identical jobs. Mathematics of Operations Research, 17(4), 842-865.
-
(1992)
Mathematics of Operations Research
, vol.17
, Issue.4
, pp. 842-865
-
-
Roundy, R.O.1
-
5
-
-
0030691565
-
Performance measures and schedules in periodic job shops
-
Lee, T.-E. and Posner, M.E. (1997) Performance measures and schedules in periodic job shops. Operations Research, 45(1), 72-91.
-
(1997)
Operations Research
, vol.45
, Issue.1
, pp. 72-91
-
-
Lee, T.-E.1
Posner, M.E.2
-
6
-
-
0000402860
-
The minimum common-cycle algorithm for cyclic scheduling of two hoists with time window constraints
-
Lei, L. and Wang, T.J. (1991) The minimum common-cycle algorithm for cyclic scheduling of two hoists with time window constraints. Management Science, 37(12), 1629-1639.
-
(1991)
Management Science
, vol.37
, Issue.12
, pp. 1629-1639
-
-
Lei, L.1
Wang, T.J.2
-
7
-
-
0342901348
-
-
Working paper, Management Sciences Department, School of Business, University of British Columbia, Vancouver BC, Canada.
-
McCormick, S.T., Pinedo, M.L. and Wolf, B. (1987) The complexity of scheduling a flexible assembly system. Working paper, Management Sciences Department, School of Business, University of British Columbia, Vancouver BC, Canada.
-
(1987)
The Complexity of Scheduling a Flexible Assembly System.
-
-
McCormick, S.T.1
Pinedo, M.L.2
Wolf, B.3
-
8
-
-
0024770469
-
Sequencing in an assembly line with blocking to minimize cycle time
-
McCormick, ST., Pinedo, M.L., Shenker, S. and Wolf, B. (1989) Sequencing in an assembly line with blocking to minimize cycle time. Operations Research, 37(6), 925-935.
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 925-935
-
-
McCormick, S.T.1
Pinedo, M.L.2
Shenker, S.3
Wolf, B.4
-
9
-
-
0025498065
-
Cyclic sequencing problems in the twomachine permutation flowshop: Complexity, worst-case and average-case analysis
-
Matsuo, H. (1990) Cyclic sequencing problems in the twomachine permutation flowshop: complexity, worst-case and average-case analysis. Naval Research Logistics Quarterly, 37, 679-694.
-
(1990)
Naval Research Logistics Quarterly
, vol.37
, pp. 679-694
-
-
Matsuo, H.1
-
10
-
-
0000757511
-
Cyclic scheduling in flow lines: Modeling observations, effective heuristics and an optimal solution procedure
-
Karabati, S. and Kouvelis, P. (1996) Cyclic scheduling in flow lines: modeling observations, effective heuristics and an optimal solution procedure. Naval Research Logistics, 43, 211-231.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 211-231
-
-
Karabati, S.1
Kouvelis, P.2
-
11
-
-
33749890935
-
-
Working paper, St. John's University, CBA, Jamaica, New York.
-
Fuxman, L. (1997) Productivity improvement using teams in mixed-model cyclic assembly lines. Working paper, St. John's University, CBA, Jamaica, New York.
-
(1997)
Productivity Improvement Using Teams in Mixed-model Cyclic Assembly Lines.
-
-
Fuxman, L.1
-
12
-
-
0028769398
-
Cyclic scheduling to minimize inventory in a batch flow line
-
Dobson, G. and Yano, C.A. (1994) Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research, 75, 441-461.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 441-461
-
-
Dobson, G.1
Yano, C.A.2
-
13
-
-
0001360372
-
Level schedules for mixed-model assembly lines in JIT production systems
-
Miltenburg, J. (1989) Level schedules for mixed-model assembly lines in JIT production systems. Management Science, 35(2), 192207.
-
(1989)
Management Science
, vol.35
, Issue.2
, pp. 192207
-
-
Miltenburg, J.1
-
15
-
-
0000172494
-
Algorithms for scheduling multi-level JIT production systems
-
Miltenburg, J. and Sinnamon, G. (1992) Algorithms for scheduling multi-level JIT production systems. HE Transactions, 24(2), 121-130.
-
(1992)
HE Transactions
, vol.24
, Issue.2
, pp. 121-130
-
-
Miltenburg, J.1
Sinnamon, G.2
-
16
-
-
0000298775
-
Sequencing to minimize work overload in assembly lines with product options
-
Yano, C.A. and Rachamadugu, R. (1991) Sequencing to minimize work overload in assembly lines with product options. Management Science, 37(5), 572-586.
-
(1991)
Management Science
, vol.37
, Issue.5
, pp. 572-586
-
-
Yano, C.A.1
Rachamadugu, R.2
-
17
-
-
0026745702
-
An analytic framework for sequencing mixed model assembly lines
-
Bard, J.F., Dar-El, E. and Shtub, A. (1992) An analytic framework for sequencing mixed model assembly lines. International Journal of Production Research, 30(1), 35-48.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
, pp. 35-48
-
-
Bard, J.F.1
Dar-El, E.2
Shtub, A.3
-
18
-
-
0028439141
-
Sequencing jobs on an automobile assembly line: Objectives and procedures
-
Bolat, A. (1994) Sequencing jobs on an automobile assembly line: objectives and procedures. International Journal of Production Research, 32(5), 1219-1236.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.5
, pp. 1219-1236
-
-
Bolat, A.1
-
19
-
-
0000363908
-
Sequencing mixedmodel assembly lines to level parts usage and minimize line length
-
Bard, J.F., Shtub, A. and Joshi, S.B. (1994) Sequencing mixedmodel assembly lines to level parts usage and minimize line length. International Journal of Production Research, 32(10), 2431-2454.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.10
, pp. 2431-2454
-
-
Bard, J.F.1
Shtub, A.2
Joshi, S.B.3
-
20
-
-
0000544268
-
Survey, development, and application of algorithms for sequencing paced assembly lines
-
Yano, C.A. and Bolat, A. (1989) Survey, development, and application of algorithms for sequencing paced assembly lines. Journal of Manufacturing and Operations Management, 2(3), 172-198.
-
(1989)
Journal of Manufacturing and Operations Management
, vol.2
, Issue.3
, pp. 172-198
-
-
Yano, C.A.1
Bolat, A.2
|