메뉴 건너뛰기




Volumn 47, Issue 21, 2009, Pages 5881-5910

Monolithic versus hierarchical approach to integrated scheduling in a supply chain

Author keywords

Due dates setting; Integer programming; Multi objective optimisation; Production and supply scheduling; Supplier selection; Supply chain operations

Indexed keywords

AVAILABLE CAPACITY; COMPUTATIONAL RESULTS; CUSTOMER SERVICE LEVELS; DUE DATES SETTING; DUE-DATE SETTING; FINISHED PRODUCTS; FLEXIBLE ASSEMBLY LINES; HIERARCHICAL APPROACH; HIGH-TECH PRODUCTS; INTEGRATED SCHEDULING; MIXED INTEGER PROGRAMMING; MULTI OBJECTIVE; MULTI-OBJECTIVE OPTIMISATION; NUMERICAL EXAMPLE; OBJECTIVE FUNCTIONS; PERFORMANCE MEASURE; PROBLEM OBJECTIVE; PRODUCTION COST; PRODUCTION LINE; REAL-WORLD; SET OF CUSTOMERS; SUPPLIER SELECTION; SUPPLY CHAIN OPERATIONS;

EID: 67651187320     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802193181     Document Type: Article
Times cited : (23)

References (26)
  • 1
    • 33846316381 scopus 로고    scopus 로고
    • A review of interactive methods for multiobjective integer and mixed-integer programming
    • Alves, M.J. and Climaco, J., 2007. A review of interactive methods for multiobjective integer and mixed-integer programming. European Journal of Operational Research, 180, 99-115.
    • (2007) European Journal of Operational Research , vol.180 , pp. 99-115
    • Alves, M.J.1    Climaco, J.2
  • 4
    • 22544468772 scopus 로고    scopus 로고
    • Integrated production and distribution operations: Taxonomy, models and review
    • D. Simchi-Levi, S.D. Wu and Z.-J. Shen, eds. Boston, MA: Academic Publishers
    • Chen, Z.-L., 2004. Integrated production and distribution operations: Taxonomy, models and review. In: D. Simchi-Levi, S.D. Wu and Z.-J. Shen, eds. Handbook of quantitative supply chain analysis: Modeling in the e-business era. Boston, MA: Academic Publishers.
    • (2004) Handbook of Quantitative Supply Chain Analysis: Modeling in the E-business Era
    • Chen, Z.-L.1
  • 5
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Chen, Z.-L. and Vairaktarakis, G.L., 2005. Integrated scheduling of production and distribution operations. Management Science, 51 (4), 614-628.
    • (2005) Management Science , vol.51 , Issue.4 , pp. 614-628
    • Chen, Z.-L.1    Vairaktarakis, G.L.2
  • 6
    • 33744826037 scopus 로고    scopus 로고
    • Order assignment and scheduling in a supply chain
    • Chen, Z.-L. and Pundoor, G., 2006. Order assignment and scheduling in a supply chain. Operations Research, 54 (3), 555-572.
    • (2006) Operations Research , vol.54 , Issue.3 , pp. 555-572
    • Chen, Z.-L.1    Pundoor, G.2
  • 7
    • 38549131389 scopus 로고    scopus 로고
    • Supply chain scheduling: Conflict and cooperation in assembly system
    • Chen, Z.-L. and Hall, N.G., 2007. Supply chain scheduling: Conflict and cooperation in assembly system. Operations Research, 55 (6), 1072-1089.
    • (2007) Operations Research , vol.55 , Issue.6 , pp. 1072-1089
    • Chen, Z.-L.1    Hall, N.G.2
  • 10
    • 0030783235 scopus 로고    scopus 로고
    • Integrated procurement-production system in a just-in-time environment-modeling and analysis
    • Goyal, S.K. and Deshmukh, S.G., 1997. Integrated procurement-production system in a just-in-time environment-modeling and analysis. Production Planning and Control, 8 (1), 31-36.
    • (1997) Production Planning and Control , vol.8 , Issue.1 , pp. 31-36
    • Goyal, S.K.1    Deshmukh, S.G.2
  • 11
    • 0035019837 scopus 로고    scopus 로고
    • Scheduling with fixed delivery dates
    • Hall, N.G., Lesaoana, M., and Potts, C.N., 2001. Scheduling with fixed delivery dates. Operations Research, 49 (1), 134-144.
    • (2001) Operations Research , vol.49 , Issue.1 , pp. 134-144
    • Hall, N.G.1    Lesaoana, M.2    Potts, C.N.3
  • 12
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • Hall, N.G and Potts, C.N., 2003. Supply chain scheduling: Batching and delivery. Operations Research, 51 (4), 566-584.
    • (2003) Operations Research , vol.51 , Issue.4 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 13
    • 67651178676 scopus 로고    scopus 로고
    • Production planning and coordination in customer driven supply chains, Wybrane Zagadnienia Logistyki Stosowanej
    • Kaczmarczyk, W. et al., 2006. Production planning and coordination in customer driven supply chains, Wybrane Zagadnienia Logistyki Stosowanej. Komitet Transportu PAN, 81-89, No.3.
    • (2006) Komitet Transportu PAN , Issue.3 , pp. 81-89
    • Kaczmarczyk, W.1
  • 14
    • 0034516883 scopus 로고    scopus 로고
    • Integration of assembly and fabrication for make-to-order production
    • Kolisch, R., 2000. Integration of assembly and fabrication for make-to-order production. International Journal of Production Economics, 68, 287-306.
    • (2000) International Journal of Production Economics , vol.68 , pp. 287-306
    • Kolisch, R.1
  • 15
    • 10144234131 scopus 로고    scopus 로고
    • A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering
    • Lee, W., 2005. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering. Omega, 33, 163-174.
    • (2005) Omega , vol.33 , pp. 163-174
    • Lee, W.1
  • 16
    • 41449093762 scopus 로고    scopus 로고
    • Integrated process planning and scheduling in a supply chain
    • Moon, C. et al., 2008. Integrated process planning and scheduling in a supply chain. Computers and Industrial Engineering, 54 (4), 1048-1061.
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 1048-1061
    • Moon, C.1
  • 18
    • 0037121160 scopus 로고    scopus 로고
    • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
    • Sawik, T., 2002. Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. European Journal of Operational Research, 143 (1), 115-124.
    • (2002) European Journal of Operational Research , vol.143 , Issue.1 , pp. 115-124
    • Sawik, T.1
  • 19
    • 30844458381 scopus 로고    scopus 로고
    • Hierarchical approach to production scheduling in make-to-order assembly
    • Sawik, T., 2006. Hierarchical approach to production scheduling in make-to-order assembly. International Journal of Production Research, 44 (4), 801-830.
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 801-830
    • Sawik, T.1
  • 20
    • 33847024346 scopus 로고    scopus 로고
    • A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing
    • DOI 10.1016/j.ejor.2006.05.023, PII S0377221706003894
    • Sawik, T., 2007a. A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing. European Journal of Operational Research, 180 (3), 1060-1075. (Pubitemid 46275311)
    • (2007) European Journal of Operational Research , vol.180 , Issue.3 , pp. 1060-1075
    • Sawik, T.1
  • 21
    • 34247897041 scopus 로고    scopus 로고
    • Multi-objective master production scheduling in make-to-order manufacturing
    • DOI 10.1080/00207540600847152, PII 778110131
    • Sawik, T., 2007b. Multi-objective master production scheduling in make-to-order manufacturing. International Journal of Production Research, 45 (12), 2629-2653. (Pubitemid 46693173)
    • (2007) International Journal of Production Research , vol.45 , Issue.12 , pp. 2629-2653
    • Sawik, T.1
  • 22
    • 70449610383 scopus 로고    scopus 로고
    • A multi-objective customer orders assignment and resource leveling in make-toorder manufacturing
    • Sawik, T., 2007c. A multi-objective customer orders assignment and resource leveling in make-toorder manufacturing. International Transactions in Operational Research, 14 (6), 491-508.
    • (2007) International Transactions in Operational Research , vol.14 , Issue.6 , pp. 491-508
    • Sawik, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.