메뉴 건너뛰기




Volumn 180, Issue 3, 2007, Pages 1060-1075

A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing

Author keywords

Flexible flowshop; Integer programming; Make to order manufacturing; Multi objective optimization; Production scheduling

Indexed keywords

COMPUTER SIMULATION; CUSTOMER SATISFACTION; ELECTRONICS INDUSTRY; INTEGER PROGRAMMING; OPTIMIZATION; SCHEDULING; STRATEGIC PLANNING;

EID: 33847024346     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.05.023     Document Type: Article
Times cited : (25)

References (21)
  • 1
    • 11144277627 scopus 로고    scopus 로고
    • A survey of cellular manufacturing practices
    • Irani S. (Ed), John Wiley, New York
    • Askin R.G., and Strada S. A survey of cellular manufacturing practices. In: Irani S. (Ed). Handbook of Cellular Manufacturing Systems (1999), John Wiley, New York
    • (1999) Handbook of Cellular Manufacturing Systems
    • Askin, R.G.1    Strada, S.2
  • 2
    • 0033325198 scopus 로고    scopus 로고
    • The simultaneous planning of production, capacity, and inventory in seasonal demand environments
    • Bradley J.R., and Arntzen B.C. The simultaneous planning of production, capacity, and inventory in seasonal demand environments. Operations Research 47 6 (1999) 795-806
    • (1999) Operations Research , vol.47 , Issue.6 , pp. 795-806
    • Bradley, J.R.1    Arntzen, B.C.2
  • 4
    • 0032071138 scopus 로고    scopus 로고
    • Scheduling with finite capacity output buffers
    • Hall N.G., Posner M.E., and Potts C.N. Scheduling with finite capacity output buffers. Operations Research 46 Suppl. 3 (1998) S84-S89
    • (1998) Operations Research , vol.46 , Issue.SUPPL. 3
    • Hall, N.G.1    Posner, M.E.2    Potts, C.N.3
  • 6
    • 27344450977 scopus 로고    scopus 로고
    • Serial agile production systems with automation
    • Hopp J.W., Iravani S.M.R., and Shou B. Serial agile production systems with automation. Operations Research 53 5 (2005) 852-866
    • (2005) Operations Research , vol.53 , Issue.5 , pp. 852-866
    • Hopp, J.W.1    Iravani, S.M.R.2    Shou, B.3
  • 8
    • 0034516883 scopus 로고    scopus 로고
    • Integration of assembly and fabrication for make-to-order production
    • Kolisch R. Integration of assembly and fabrication for make-to-order production. International Journal of Production Economics 68 (2000) 287-306
    • (2000) International Journal of Production Economics , vol.68 , pp. 287-306
    • Kolisch, R.1
  • 9
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS: An automated production planning and delivery quotation system at Harris Corporation - semiconductor sector
    • Leachman R.C., Benson R.F., Liu C., and Raar D.J. IMPReSS: An automated production planning and delivery quotation system at Harris Corporation - semiconductor sector. Interfaces 26 (1996) 6-37
    • (1996) Interfaces , vol.26 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 12
    • 0032657381 scopus 로고    scopus 로고
    • Resource levelling for projects with schedule-dependent time windows
    • Neumann K., and Zimmermann J. Resource levelling for projects with schedule-dependent time windows. European Journal of Operational Research 117 (1999) 591-605
    • (1999) European Journal of Operational Research , vol.117 , pp. 591-605
    • Neumann, K.1    Zimmermann, J.2
  • 14
    • 0032095129 scopus 로고    scopus 로고
    • A lexicographic approach to bi-objective loading of a flexible assembly system
    • Sawik T. A lexicographic approach to bi-objective loading of a flexible assembly system. European Journal of Operational Research 107 (1998) 658-668
    • (1998) European Journal of Operational Research , vol.107 , pp. 658-668
    • Sawik, T.1
  • 15
    • 18844387410 scopus 로고    scopus 로고
    • Integer programming approach to production scheduling for make-to-order manufacturing
    • Sawik T. Integer programming approach to production scheduling for make-to-order manufacturing. Mathematical and Computer Modelling 41 1 (2005) 99-118
    • (2005) Mathematical and Computer Modelling , vol.41 , Issue.1 , pp. 99-118
    • Sawik, T.1
  • 16
    • 30844458381 scopus 로고    scopus 로고
    • A hierarchical approach to production scheduling in make-to-order assembly
    • Sawik T. A hierarchical approach to production scheduling in make-to-order assembly. International Journal of Production Research 44 4 (2006) 801-830
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 801-830
    • Sawik, T.1
  • 17
    • 77957088268 scopus 로고
    • Mathematical programming models and methods for production planning and scheduling
    • Graves S.C., Rinnooy Kan A.H.G., and Zipkin P.H. (Eds), North-Holland, Amsterdam
    • Shapiro J.F. Mathematical programming models and methods for production planning and scheduling. In: Graves S.C., Rinnooy Kan A.H.G., and Zipkin P.H. (Eds). Handbook in Operations Research and Management Science: Logistics of Production and Inventory (1993), North-Holland, Amsterdam
    • (1993) Handbook in Operations Research and Management Science: Logistics of Production and Inventory
    • Shapiro, J.F.1
  • 20
    • 0024731874 scopus 로고
    • A review of the dual resource constraint systems research
    • Treleven M. A review of the dual resource constraint systems research. IIE Transactions 21 (1989) 279-777
    • (1989) IIE Transactions , vol.21 , pp. 279-777
    • Treleven, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.