메뉴 건너뛰기




Volumn 11, Issue 2, 2002, Pages 216-230

Scheduling hybrid flowshops in printed circuit board assembly lines

Author keywords

Heuristics; Hybrid flowshops; Printed circuit board assembly; Scheduling

Indexed keywords


EID: 10444255675     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2002.tb00492.x     Document Type: Article
Times cited : (83)

References (30)
  • 1
    • 0006859287 scopus 로고
    • An Extension of Two Machine Sequencing Problem
    • ARTHANARY, T. S. AND K. G. RAMASWAMY (1971), "An Extension of Two Machine Sequencing Problem," Opsearch, 8, 1, 10-22.
    • (1971) Opsearch , vol.8 , Issue.1 , pp. 10-22
    • Arthanary, T.S.1    Ramaswamy, K.G.2
  • 3
    • 0023364612 scopus 로고
    • Scheduling Jobs with Release Dates and Tails on Identical Machines to Minimize the Makespan
    • CARLIER, J. (1987), "Scheduling Jobs with Release Dates and Tails on Identical Machines to Minimize the Makespan," European Journal of Operational Research, 29, 3, 298-306.
    • (1987) European Journal of Operational Research , vol.29 , Issue.3 , pp. 298-306
    • Carlier, J.1
  • 4
    • 0030281857 scopus 로고    scopus 로고
    • A New Heuristic for Three-Machine Flowshop Scheduling
    • CHEN, B., C. A. GLASS, C. N. POTTS, AND V. A. STRUSEVICH (1996), "A New Heuristic for Three-Machine Flowshop Scheduling," Operations Research, 44, 6, 891-898.
    • (1996) Operations Research , vol.44 , Issue.6 , pp. 891-898
    • Chen, B.1    Glass, C.A.2    Potts, C.N.3    Strusevich, V.A.4
  • 6
    • 0030085559 scopus 로고    scopus 로고
    • A GRASP for Scheduling Printed Wiring Board Assembly
    • FEO, T. A., J. F. BARD, AND S. D. HOLLAND (1996), "A GRASP for Scheduling Printed Wiring Board Assembly," IIE Transactions, 28, 2, 155-165.
    • (1996) IIE Transactions , vol.28 , Issue.2 , pp. 155-165
    • Feo, T.A.1    Bard, J.F.2    Holland, S.D.3
  • 9
    • 0031543097 scopus 로고    scopus 로고
    • Scheduling a Two-Stage Hybrid Flow Shop with Parallel Machines at the First Stage
    • GUPTA, J. N. D., A. M. A. HARIRI, AND C. N. POTTS (1997), "Scheduling a Two-Stage Hybrid Flow Shop with Parallel Machines at the First Stage," Annals of Operations Research, 69, 171-191.
    • (1997) Annals of Operations Research , vol.69 , pp. 171-191
    • Gupta, J.N.D.1    Hariri, A.M.A.2    Potts, C.N.3
  • 10
    • 0026190509 scopus 로고
    • Schedules for a Two-Stage Hybrid Flowshop with Parallel Machine at the Second Stage
    • _ AND E. A. TUNC (1991), "Schedules for a Two-Stage Hybrid Flowshop with Parallel Machine at the Second Stage," International Journal of Production Research, 29, 7, 1489-1502.
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1489-1502
    • Tunc, E.A.1
  • 11
    • 0003899269 scopus 로고    scopus 로고
    • Heuristic Algorithms for the Two-Stage Hybrid Flowshop Problem
    • HAOUARI, H. AND R. M'HALLAH (1997), "Heuristic Algorithms for the Two-Stage Hybrid Flowshop Problem," Operations Research Letters, 21, 1, 43-53.
    • (1997) Operations Research Letters , vol.21 , Issue.1 , pp. 43-53
    • Haouari, H.1    M'Hallah, R.2
  • 12
    • 0003666178 scopus 로고
    • Research No. 43, Management Science Research Project, University of California, Los Angeles, CA
    • JACKSON, J. R. (1955), Scheduling a Production Line to Minimize Maximum Tardiness, Research No. 43, Management Science Research Project, University of California, Los Angeles, CA.
    • (1955) Scheduling a Production Line to Minimize Maximum Tardiness
    • Jackson, J.R.1
  • 13
    • 0003075019 scopus 로고
    • Optimal Two- and Three-Stage Production Schedules with Setup Times Included
    • JOHNSON, S. M. (1954), "Optimal Two- and Three-Stage Production Schedules with Setup Times Included," Naval Research Logistics Quarterly, 1, 1, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 14
    • 0023379505 scopus 로고
    • Interstage Transportation Planning in the Deterministic Flow-Shop Environment
    • LANGSTON, M. A. (1987), "Interstage Transportation Planning in the Deterministic Flow-Shop Environment," Operations Research, 35, 4, 556-564.
    • (1987) Operations Research , vol.35 , Issue.4 , pp. 556-564
    • Langston, M.A.1
  • 16
  • 20
    • 0032050653 scopus 로고    scopus 로고
    • The Flow Shop with Parallel Machines: A Tabu Search Approach
    • NOWICKI, E. AND C. SMUTNICKI (1998), "The Flow Shop with Parallel Machines: A Tabu Search Approach," European Journal of Operational Research, 106, 2, 226-253.
    • (1998) European Journal of Operational Research , vol.106 , Issue.2 , pp. 226-253
    • Nowicki, E.1    Smutnicki, C.2
  • 24
    • 0032169302 scopus 로고    scopus 로고
    • A Hybrid Three-Stage Flowshop Problem: Efficient Heuristics to Minimize Makespan
    • _, _, AND _ (1998b), "A Hybrid Three-Stage Flowshop Problem: Efficient Heuristics to Minimize Makespan," European Journal of Operational Research, 109, 2, 321-329.
    • (1998) European Journal of Operational Research , vol.109 , Issue.2 , pp. 321-329
  • 27
    • 0024769054 scopus 로고
    • Scheduling Algorithm for Flexible Flowshops: Worst and Average Case Performance
    • SRISKANDARAJAH, C. AND S. P. SETHI (1989), "Scheduling Algorithm for Flexible Flowshops: Worst and Average Case Performance," European Journal of Operational Research, 43, 2, 143-160.
    • (1989) European Journal of Operational Research , vol.43 , Issue.2 , pp. 143-160
    • Sriskandarajah, C.1    Sethi, S.P.2
  • 30
    • 0346438804 scopus 로고    scopus 로고
    • Heuristics for Minimizing Total Weighted Tardiness in Flexible Flow Shops
    • YANO, Y., S. KREIPL, AND M. PINEDO (2000), "Heuristics for Minimizing Total Weighted Tardiness in Flexible Flow Shops," Journal of Scheduling, 3, 2, 89-108.
    • (2000) Journal of Scheduling , vol.3 , Issue.2 , pp. 89-108
    • Yano, Y.1    Kreipl, S.2    Pinedo, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.