An Extension of Two Machine Sequencing Problem
-
ARTHANARY, T. S. AND K. G. RAMASWAMY (1971), "An Extension of Two Machine Sequencing Problem," Opsearch, 8, 1, 10-22.
-
(1971)
Opsearch
, vol.8
, Issue.1
, pp. 10-22
-
-
Arthanary, T.S.1
Ramaswamy, K.G.2
-
2
-
-
0003279343
-
Annealing Method for PCB Assembly Scheduling on Two Sequential Machines
-
BEN-ARIEH, D. AND O. MAIMON (1992), "Annealing Method for PCB Assembly Scheduling on Two Sequential Machines," International Journal of Computer Integrated Manufacturing, 5, 6, 361-367.
-
(1992)
International Journal of Computer Integrated Manufacturing
, vol.5
, Issue.6
, pp. 361-367
-
-
Ben-Arieh, D.1
Maimon, O.2
-
3
-
-
0023364612
-
Scheduling Jobs with Release Dates and Tails on Identical Machines to Minimize the Makespan
-
CARLIER, J. (1987), "Scheduling Jobs with Release Dates and Tails on Identical Machines to Minimize the Makespan," European Journal of Operational Research, 29, 3, 298-306.
-
(1987)
European Journal of Operational Research
, vol.29
, Issue.3
, pp. 298-306
-
-
Carlier, J.1
-
4
-
-
0030281857
-
A New Heuristic for Three-Machine Flowshop Scheduling
-
CHEN, B., C. A. GLASS, C. N. POTTS, AND V. A. STRUSEVICH (1996), "A New Heuristic for Three-Machine Flowshop Scheduling," Operations Research, 44, 6, 891-898.
-
(1996)
Operations Research
, vol.44
, Issue.6
, pp. 891-898
-
-
Chen, B.1
Glass, C.A.2
Potts, C.N.3
Strusevich, V.A.4
-
5
-
-
0011714888
-
The Two-Stage Flowshop Scheduling Problem with m Machines at Each Stage
-
DEAL, D. E. AND J. L. HUNSUCKER (1991), "The Two-Stage Flowshop Scheduling Problem with m Machines at Each Stage," Journal of the Information and Optimization Sciences, 12, 3, 407-417.
-
(1991)
Journal of the Information and Optimization Sciences
, vol.12
, Issue.3
, pp. 407-417
-
-
Deal, D.E.1
Hunsucker, J.L.2
-
6
-
-
0030085559
-
A GRASP for Scheduling Printed Wiring Board Assembly
-
FEO, T. A., J. F. BARD, AND S. D. HOLLAND (1996), "A GRASP for Scheduling Printed Wiring Board Assembly," IIE Transactions, 28, 2, 155-165.
-
(1996)
IIE Transactions
, vol.28
, Issue.2
, pp. 155-165
-
-
Feo, T.A.1
Bard, J.F.2
Holland, S.D.3
-
7
-
-
0003722376
-
-
Addison-Wesley, Menlo Park, CA
-
GOLDBERG, D. E. (1989), Genetic Algorithm in Search, Optimization, and Machine Learning, Addison-Wesley, Menlo Park, CA.
-
(1989)
Genetic Algorithm in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
8
-
-
0030149222
-
A Computational Study of Heuristics for Two-Stage Flexible Flowshop
-
GUINET, A., M. M. SOLOMON, P. K. KEDIA, AND A. DUSSAUCHOY (1996), "A Computational Study of Heuristics for Two-Stage Flexible Flowshop," International Journal of Production Research, 34, 5, 1399-1415.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.5
, pp. 1399-1415
-
-
Guinet, A.1
Solomon, M.M.2
Kedia, P.K.3
Dussauchoy, A.4
-
9
-
-
0031543097
-
Scheduling a Two-Stage Hybrid Flow Shop with Parallel Machines at the First Stage
-
GUPTA, J. N. D., A. M. A. HARIRI, AND C. N. POTTS (1997), "Scheduling a Two-Stage Hybrid Flow Shop with Parallel Machines at the First Stage," Annals of Operations Research, 69, 171-191.
-
(1997)
Annals of Operations Research
, vol.69
, pp. 171-191
-
-
Gupta, J.N.D.1
Hariri, A.M.A.2
Potts, C.N.3
-
10
-
-
0026190509
-
Schedules for a Two-Stage Hybrid Flowshop with Parallel Machine at the Second Stage
-
_ AND E. A. TUNC (1991), "Schedules for a Two-Stage Hybrid Flowshop with Parallel Machine at the Second Stage," International Journal of Production Research, 29, 7, 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1489-1502
-
-
Tunc, E.A.1
-
11
-
-
0003899269
-
Heuristic Algorithms for the Two-Stage Hybrid Flowshop Problem
-
HAOUARI, H. AND R. M'HALLAH (1997), "Heuristic Algorithms for the Two-Stage Hybrid Flowshop Problem," Operations Research Letters, 21, 1, 43-53.
-
(1997)
Operations Research Letters
, vol.21
, Issue.1
, pp. 43-53
-
-
Haouari, H.1
M'Hallah, R.2
-
12
-
-
0003666178
-
-
Research No. 43, Management Science Research Project, University of California, Los Angeles, CA
-
JACKSON, J. R. (1955), Scheduling a Production Line to Minimize Maximum Tardiness, Research No. 43, Management Science Research Project, University of California, Los Angeles, CA.
-
(1955)
Scheduling a Production Line to Minimize Maximum Tardiness
-
-
Jackson, J.R.1
-
13
-
-
0003075019
-
Optimal Two- and Three-Stage Production Schedules with Setup Times Included
-
JOHNSON, S. M. (1954), "Optimal Two- and Three-Stage Production Schedules with Setup Times Included," Naval Research Logistics Quarterly, 1, 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
14
-
-
0023379505
-
Interstage Transportation Planning in the Deterministic Flow-Shop Environment
-
LANGSTON, M. A. (1987), "Interstage Transportation Planning in the Deterministic Flow-Shop Environment," Operations Research, 35, 4, 556-564.
-
(1987)
Operations Research
, vol.35
, Issue.4
, pp. 556-564
-
-
Langston, M.A.1
-
15
-
-
0345901561
-
Sequencing and Scheduling: Algorithms and Complexity
-
S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds.), North Holland, Amsterdam, New York
-
LAWLER, E. L., K. L. JAN, H. G. R. K. ALEXANDER, AND B. S. DAVID (1993), "Sequencing and Scheduling: Algorithms and Complexity," in Handbooks in Operations Research and Management Science, Logistics of Production and Inventory, S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds.), North Holland, Amsterdam, New York, 4, 445-522.
-
(1993)
Handbooks in Operations Research and Management Science, Logistics of Production and Inventory
, vol.4
, pp. 445-522
-
-
Lawler, E.L.1
Jan, K.L.2
Alexander, H.G.R.K.3
David, B.S.4
-
16
-
-
0028529503
-
Minimizing Makespan in Hybrid Flowshops
-
LEE, C.-Y. AND G. VAIRAKTARAKIS (1994), "Minimizing Makespan in Hybrid Flowshops," Operations Research Letters, 16, 3, 149-158.
-
(1994)
Operations Research Letters
, vol.16
, Issue.3
, pp. 149-158
-
-
Lee, C.-Y.1
Vairaktarakis, G.2
-
19
-
-
0020699921
-
A Heuristic Algorithm for the m-Machine, n-Job Flow-Shop Sequencing Problem
-
NAWAZ, M., E. E. ENSCORE, JR., AND I. HAM (1983), "A Heuristic Algorithm for the m-Machine, n-Job Flow-Shop Sequencing Problem," OMEGA The International Journal of Management Science, 11, 1, 91-95.
-
(1983)
OMEGA the International Journal of Management Science
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
20
-
-
0032050653
-
The Flow Shop with Parallel Machines: A Tabu Search Approach
-
NOWICKI, E. AND C. SMUTNICKI (1998), "The Flow Shop with Parallel Machines: A Tabu Search Approach," European Journal of Operational Research, 106, 2, 226-253.
-
(1998)
European Journal of Operational Research
, vol.106
, Issue.2
, pp. 226-253
-
-
Nowicki, E.1
Smutnicki, C.2
-
21
-
-
0002470532
-
A Study of Permutation Crossover Operators on the Traveling Salesman Problem
-
OLIVER, I. M., D. J. SMITH, AND J. R. C. HOLLAND (1987), "A Study of Permutation Crossover Operators on the Traveling Salesman Problem," Proceedings of 2nd International Conference on Genetic Algorithm, 224-230.
-
(1987)
Proceedings of 2nd International Conference on Genetic Algorithm
, pp. 224-230
-
-
Oliver, I.M.1
Smith, D.J.2
Holland, J.R.C.3
-
22
-
-
0028426236
-
Learning-Based Scheduling in a Flexible Manufacturing Flow Line
-
PIRAMUTHU, S., N. RAMAN, AND M. J. SHAW (1994), "Learning-Based Scheduling in a Flexible Manufacturing Flow Line," IEEE Transactions on Engineering Management, 41, 2, 172-182.
-
(1994)
IEEE Transactions on Engineering Management
, vol.41
, Issue.2
, pp. 172-182
-
-
Piramuthu, S.1
Raman, N.2
Shaw, M.J.3
-
23
-
-
84889105951
-
-
Research Report, North Carolina State University, Raleigh, CA, June
-
RIANE, F., H. ARTIBA, AND S. E. ELMAGHRABY (1998a), Sequencing Hybrid Two-Stage Flowshops with Dedicated Machines, Research Report, North Carolina State University, Raleigh, CA, June.
-
(1998)
Sequencing Hybrid Two-Stage Flowshops with Dedicated Machines
-
-
Riane, F.1
Artiba, H.2
Elmaghraby, S.E.3
-
24
-
-
0032169302
-
A Hybrid Three-Stage Flowshop Problem: Efficient Heuristics to Minimize Makespan
-
_, _, AND _ (1998b), "A Hybrid Three-Stage Flowshop Problem: Efficient Heuristics to Minimize Makespan," European Journal of Operational Research, 109, 2, 321-329.
-
(1998)
European Journal of Operational Research
, vol.109
, Issue.2
, pp. 321-329
-
-
-
25
-
-
0029636121
-
Global Lower Bounds for Flowshop with Multiple Processors
-
SANTOS, D. L., J. L. HUNSUCKER, AND D. E. DEAL (1995), "Global Lower Bounds for Flowshop with Multiple Processors," European Journal of Operational Research, 80, 1, 112-120.
-
(1995)
European Journal of Operational Research
, vol.80
, Issue.1
, pp. 112-120
-
-
Santos, D.L.1
Hunsucker, J.L.2
Deal, D.E.3
-
26
-
-
0003904902
-
-
Unpublished Ph.D. thesis, North Carolina State University, Raleigh, NC
-
SOEWANDI, H. (1998), Sequencing Jobs on Two- and Three-Stage Hybrid Flowshop to Minimize Makespan, Unpublished Ph.D. thesis, North Carolina State University, Raleigh, NC.
-
(1998)
Sequencing Jobs on Two- and Three-Stage Hybrid Flowshop to Minimize Makespan
-
-
Soewandi, H.1
-
27
-
-
0024769054
-
Scheduling Algorithm for Flexible Flowshops: Worst and Average Case Performance
-
SRISKANDARAJAH, C. AND S. P. SETHI (1989), "Scheduling Algorithm for Flexible Flowshops: Worst and Average Case Performance," European Journal of Operational Research, 43, 2, 143-160.
-
(1989)
European Journal of Operational Research
, vol.43
, Issue.2
, pp. 143-160
-
-
Sriskandarajah, C.1
Sethi, S.P.2
-
28
-
-
0002976163
-
Comparison of Heuristics for Flow Shop Sequencing
-
TURNER, S. AND D. BOOTH (1987), "Comparison of Heuristics for Flow Shop Sequencing," OMEGA The International Journal of Management Science, 15, 1, 75-78.
-
(1987)
OMEGA the International Journal of Management Science
, vol.15
, Issue.1
, pp. 75-78
-
-
Turner, S.1
Booth, D.2
-
30
-
-
0346438804
-
Heuristics for Minimizing Total Weighted Tardiness in Flexible Flow Shops
-
YANO, Y., S. KREIPL, AND M. PINEDO (2000), "Heuristics for Minimizing Total Weighted Tardiness in Flexible Flow Shops," Journal of Scheduling, 3, 2, 89-108.
-
(2000)
Journal of Scheduling
, vol.3
, Issue.2
, pp. 89-108
-
-
Yano, Y.1
Kreipl, S.2
Pinedo, M.3
|