메뉴 건너뛰기




Volumn 55, Issue 6, 2007, Pages 1072-1089

Supply chain scheduling: Conflict and cooperation in assembly systems

Author keywords

Cooperation: benefit; Cost of conflict; Decision making: cooperation; Supply chain scheduling

Indexed keywords

ASSEMBLY SYSTEMS; COST OF CONFLICT; NONBOTTLENECK OPERATIONS;

EID: 38549131389     PISSN: 0030364X     EISSN: 15265463     Source Type: Journal    
DOI: 10.1287/opre.1070.0412     Document Type: Article
Times cited : (118)

References (32)
  • 1
    • 33746137834 scopus 로고    scopus 로고
    • Supply chain scheduling: Sequence coordination
    • Agnetis, A., N. G. Hall, D. Pacciarelli. 2006. Supply chain scheduling: Sequence coordination. Discrete Appl. Math. 154 2044-2063.
    • (2006) Discrete Appl. Math , vol.154 , pp. 2044-2063
    • Agnetis, A.1    Hall, N.G.2    Pacciarelli, D.3
  • 2
    • 13844290525 scopus 로고    scopus 로고
    • Supply chain coordination with contracts
    • A. G. de Kok, S. C. Graves, eds, North-Holland, Amsterdam, The Netherlands
    • Cachon, G. P. 2003. Supply chain coordination with contracts. A. G. de Kok, S. C. Graves, eds. Supply Chain Management: Design, Coordination, and Operation, Vol. 11. North-Holland, Amsterdam, The Netherlands, 229-339.
    • (2003) Supply Chain Management: Design, Coordination, and Operation , vol.11 , pp. 229-339
    • Cachon, G.P.1
  • 3
    • 77950465256 scopus 로고    scopus 로고
    • Information sharing and supply chain coordination
    • A. G. de Kok, S. C. Graves, eds, North-Holland, Amsterdam, The Netherlands
    • Chen, F. 2003. Information sharing and supply chain coordination. A. G. de Kok, S. C. Graves, eds. Supply Chain Management: Design, Coordination, and Operation, Vol. 11. North-Holland, Amsterdam, The Netherlands, 341-421.
    • (2003) Supply Chain Management: Design, Coordination, and Operation , vol.11 , pp. 341-421
    • Chen, F.1
  • 5
    • 38549179606 scopus 로고    scopus 로고
    • A long march to mass customisation, 8230, July 14 63
    • The Economist. 2001. A long march to mass customisation. 360(8230, July 14) 63.
    • (2001) The Economist , vol.360
  • 6
    • 38549155327 scopus 로고    scopus 로고
    • VPT stresses standard approach for mil apps - Power supplier girds for possible defense buildup
    • 1284, October 15
    • Electronic Business News. 2001. VPT stresses standard approach for mil apps - Power supplier girds for possible defense buildup. (1284, October 15) 74.
    • (2001) Electronic Business News , pp. 74
  • 9
    • 0032665038 scopus 로고    scopus 로고
    • Value of information in capacitated supply chains
    • Gavirneni, S., R. Kapuscinski, S. Tayur. 1999. Value of information in capacitated supply chains. Management Sci. 45 16-24.
    • (1999) Management Sci , vol.45 , pp. 16-24
    • Gavirneni, S.1    Kapuscinski, R.2    Tayur, S.3
  • 10
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic machine scheduling: A survey
    • Graham, R. L., E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan. 1979. Optimization and approximation in deterministic machine scheduling: A survey. Ann. Discrete Math. 5 287-326.
    • (1979) Ann. Discrete Math , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 11
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • Hall, N. G., C. N. Potts. 2003. Supply chain scheduling: Batching and delivery. Oper. Res. 51 566-584.
    • (2003) Oper. Res , vol.51 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 12
    • 0029314136 scopus 로고
    • Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
    • Hoogeveen, J. A., S. L. van de Velde. 1995. Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time. Oper. Res. Lett. 17 205-208.
    • (1995) Oper. Res. Lett , vol.17 , pp. 205-208
    • Hoogeveen, J.A.1    van de Velde, S.L.2
  • 14
    • 0042182628 scopus 로고
    • Scheduling a production line to minimize maximum tardiness
    • Management Science Research Project, University of California, Los Angeles, CA
    • Jackson, J. R. 1955. Scheduling a production line to minimize maximum tardiness. Research Report 43, Management Science Research Project, University of California, Los Angeles, CA.
    • (1955) Research Report , vol.43
    • Jackson, J.R.1
  • 15
    • 0032201667 scopus 로고    scopus 로고
    • Probabilistic analysis and practical algorithms for the flow shop weighted completion time problem
    • Kaminsky, P., D. Simchi-Levi. 1998. Probabilistic analysis and practical algorithms for the flow shop weighted completion time problem. Oper. Res. 46 872-882.
    • (1998) Oper. Res , vol.46 , pp. 872-882
    • Kaminsky, P.1    Simchi-Levi, D.2
  • 16
    • 0002429995 scopus 로고
    • A survey of simulated annealing applications to operations research problems
    • Koulamas, C., S. R. Antony, R. Jaen. 1994. A survey of simulated annealing applications to operations research problems. Omega 22 41-56.
    • (1994) Omega , vol.22 , pp. 41-56
    • Koulamas, C.1    Antony, S.R.2    Jaen, R.3
  • 17
    • 79961203618 scopus 로고    scopus 로고
    • Working paper, Center for Research on Information Technology and Organizations, University of California, Irvine, CA
    • Kraemer, K. L., J. Dedrick. 2002. Dell computer: Organization of a global production network. Working paper, Center for Research on Information Technology and Organizations, University of California, Irvine, CA.
    • (2002) Dell computer: Organization of a global production network
    • Kraemer, K.L.1    Dedrick, J.2
  • 18
    • 0027696097 scopus 로고
    • Batching and scheduling in FMS hubs: Flow time considerations
    • Lane, D. E., J. B. Sidney. 1993. Batching and scheduling in FMS hubs: Flow time considerations. Oper. Res. 41 1091-1103.
    • (1993) Oper. Res , vol.41 , pp. 1091-1103
    • Lane, D.E.1    Sidney, J.B.2
  • 19
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Lee, C.-Y., Z.-L. Chen. 2001. Machine scheduling with transportation considerations. J. Scheduling 4 3-24.
    • (2001) J. Scheduling , vol.4 , pp. 3-24
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 20
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
    • Lee, C.-Y., T. C. E. Cheng, B. M. T. Lin. 1993. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Sci. 39 616-625.
    • (1993) Management Sci , vol.39 , pp. 616-625
    • Lee, C.-Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 22
    • 0000291018 scopus 로고
    • The bargaining problem
    • Nash, J. F. 1950. The bargaining problem. Econometrica 18 155-162.
    • (1950) Econometrica , vol.18 , pp. 155-162
    • Nash, J.F.1
  • 23
    • 0001058478 scopus 로고
    • Two-person cooperative games
    • Nash, J. F. 1953. Two-person cooperative games. Econometrica 21 128-140.
    • (1953) Econometrica , vol.21 , pp. 128-140
    • Nash, J.F.1
  • 24
    • 0037941513 scopus 로고    scopus 로고
    • Batch scheduling with controllable setup and processing times to minimize total completion time
    • Ng, C. T. D., T. C. E. Cheng, M. Y. Kovalyov. 2003. Batch scheduling with controllable setup and processing times to minimize total completion time. J. Oper. Res. Soc. 54 499-506.
    • (2003) J. Oper. Res. Soc , vol.54 , pp. 499-506
    • Ng, C.T.D.1    Cheng, T.C.E.2    Kovalyov, M.Y.3
  • 25
    • 0003136655 scopus 로고
    • A cooperative scheduling system
    • M. D. Oliff, ed, Elsevier Science Publishing, Amsterdam, The Netherlands
    • Ow, P. S., S. F. Smith, R. Howie. 1988. A cooperative scheduling system. M. D. Oliff, ed. Expert Systems and Intelligent Manufacturing. Elsevier Science Publishing, Amsterdam, The Netherlands, 43-56.
    • (1988) Expert Systems and Intelligent Manufacturing , pp. 43-56
    • Ow, P.S.1    Smith, S.F.2    Howie, R.3
  • 28
    • 0345820065 scopus 로고    scopus 로고
    • Have U.S. manufacturing inventories really decreased? An empirical study
    • Rajagopalan, S., A. Malhotra. 2001. Have U.S. manufacturing inventories really decreased? An empirical study. Manufacturing Service Oper. Management 3 14-24.
    • (2001) Manufacturing Service Oper. Management , vol.3 , pp. 14-24
    • Rajagopalan, S.1    Malhotra, A.2
  • 29
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production-distribution systems
    • Sarmiento, A. M., R. Nagi. 1999. A review of integrated analysis of production-distribution systems. IIE Trans. 31 1061-1074.
    • (1999) IIE Trans , vol.31 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 30
    • 0002066821 scopus 로고
    • Various optimizers for single stage production
    • Smith, W. E. 1956. Various optimizers for single stage production. Naval Res. Logist. Quart. 3 59-66.
    • (1956) Naval Res. Logist. Quart , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 32
    • 0041760308 scopus 로고    scopus 로고
    • Coordinated supply chain management
    • Thomas, D. J., P. M. Griffin. 1996. Coordinated supply chain management. Eur. J. Oper. Res. 94 1-15.
    • (1996) Eur. J. Oper. Res , vol.94 , pp. 1-15
    • Thomas, D.J.1    Griffin, P.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.