-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
ADAMS J., BALAS E. and ZAWACK D., "The shifting bottleneck procedure for job shop scheduling", Management Science, vol. 34, no. 3, p. 391-401, 1988.
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0004907103
-
A bounding scheme for deriving the minimal cycle time of a single-transporter n-stage process with time-window constraints
-
ARMSTRONG R., LEI L. and SHANHONG G., "A bounding scheme for deriving the minimal cycle time of a single-transporter n-stage process with time-window constraints", European Journal of Operational Research, vol. 75, p. 1-11, 1994.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 1-11
-
-
Armstrong, R.1
Lei, L.2
Shanhong, G.3
-
3
-
-
0030145165
-
A greedy algorithm to determine the number of transporters in a cyclic electroplating process
-
ARMSTRONG R., GU S. and LEI L., "A greedy algorithm to determine the number of transporters in a cyclic electroplating process", Institute of Industrial Engineers Transactions, vol. 28, no. 5, p. 347-355, 1996.
-
(1996)
Institute of Industrial Engineers Transactions
, vol.28
, Issue.5
, pp. 347-355
-
-
Armstrong, R.1
Gu, S.2
Lei, L.3
-
4
-
-
0038172110
-
Résolution d'un problème d'ordonnancement avec la PLC
-
BAPTISTE P., LEGEARD B., MANIER M.-A. and VARNIER C., "Résolution d'un problème d'ordonnancement avec la PLC", European Journal of Automated Systems, vol. 30, no. 2-3, p. 201-230, 1996.
-
(1996)
European Journal of Automated Systems
, vol.30
, Issue.2-3
, pp. 201-230
-
-
Baptiste, P.1
Legeard, B.2
Manier, M.-A.3
Varnier, C.4
-
5
-
-
0037496863
-
Hoist scheduling problem: state-of-the-art
-
Fourth International Federation of Automatic Control Workshop on Intelligent Manufacturing Systems, Seoul, Korea
-
BLOCH C., BACHELU A., VARNIER C. and BAPTISTE P., "Hoist scheduling problem: state-of-the-art", Fourth International Federation of Automatic Control Workshop on Intelligent Manufacturing Systems, Seoul, Korea, p. 177-185, 1997.
-
(1997)
, pp. 177-185
-
-
Bloch, C.1
Bachelu, A.2
Varnier, C.3
Baptiste, P.4
-
6
-
-
0038510811
-
A taboo search combined with a modified shifting bottleneck heuristic for solving a blocking scheduling problem with bounded processing times
-
15th Conference of the International Federation of Operational Research Societies, Beijing, China
-
BLOCH C., VARNIER C. and BAPTISTE P., "A taboo search combined with a modified shifting bottleneck heuristic for solving a blocking scheduling problem with bounded processing times", 15th Conference of the International Federation of Operational Research Societies, Beijing, China, p. 125-126, 1999.
-
(1999)
, pp. 125-126
-
-
Bloch, C.1
Varnier, C.2
Baptiste, P.3
-
7
-
-
0033333232
-
Notation and typology for the hoist scheduling problem
-
BLOCH C. and MANIER M.-A., "Notation and typology for the hoist scheduling problem", Institute of Electrical and Electronics Engineers Systems, Man and Cybernetics Conference, Tokyo, Japan, vol. 6, p. 475-480, 1999.
-
(1999)
Institute of Electrical and Electronics Engineers Systems, Man and Cybernetics Conference, Tokyo, Japan
, vol.6
, pp. 475-480
-
-
Bloch, C.1
Manier, M.-A.2
-
8
-
-
0029427108
-
Couplage méthodes d'ordonnancement - simulation pour l'ordonnancement de systèmes industriels de traitement de surface
-
CAUX C., FLEURY G., GOURGAND M. and KELLERT P., "Couplage méthodes d'ordonnancement - simulation pour l'ordonnancement de systèmes industriels de traitement de surface", RAIRO-Recherche Opérationnelle, vol. 29, no. 4, p. 391, 1995.
-
(1995)
RAIRO-Recherche Opérationnelle
, vol.29
, Issue.4
, pp. 391
-
-
Caux, C.1
Fleury, G.2
Gourgand, M.3
Kellert, P.4
-
9
-
-
0037496866
-
Solving a hoist scheduling problem as a sequencing problem
-
International Federation of Automatic Control/International Federation for Information Processing Conference on Management and Control of Production and Logistics, Campinas, Brazil
-
CAUX C. and PIERREVAL H., "Solving a hoist scheduling problem as a sequencing problem", International Federation of Automatic Control/International Federation for Information Processing Conference on Management and Control of Production and Logistics, Campinas, Brazil, p. 372-376, 1997.
-
(1997)
, pp. 372-376
-
-
Caux, C.1
Pierreval, H.2
-
10
-
-
0029481596
-
A constraint-posting framework for scheduling under complex constraints
-
CHENG C.-C. and SMITH S. F., "A constraint-posting framework for scheduling under complex constraints", Symposium on Emerging Technologies and Factory Automation, Paris (France), vol. 1, p. 269-280, 1995.
-
(1995)
Symposium on Emerging Technologies and Factory Automation, Paris (France)
, vol.1
, pp. 269-280
-
-
Cheng, C.-C.1
Smith, S.F.2
-
11
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
CHEN H., CHU C. and PROTH J.-M., "Cyclic scheduling of a hoist with time window constraints", Institute of Electrical and Electronics Engineers Transactions on Robotics and Automation, vol. 14, no. 1, p. 144-152, 1998.
-
(1998)
Institute of Electrical and Electronics Engineers Transactions on Robotics and Automation
, vol.14
, Issue.1
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.-M.3
-
12
-
-
0031072439
-
A tabu search heuristic for the vehicle routing problem with backhauls and time windows
-
DUHAMEL C., POTVIN J.Y. and ROUSSEAU J.M., "A tabu search heuristic for the vehicle routing problem with backhauls and time windows", Transportation Science, vol. 31, no. 1, p. 49-59, 1997.
-
(1997)
Transportation Science
, vol.31
, Issue.1
, pp. 49-59
-
-
Duhamel, C.1
Potvin, J.Y.2
Rousseau, J.M.3
-
13
-
-
0018995327
-
Characterizing the set of feasible sequences for n jobs to be carried out on a single machine
-
ERSCHLER J., ROUBELLAT F. and VERNHES J.-P., "Characterizing the set of feasible sequences for n jobs to be carried out on a single machine", European Journal of Operational Research, vol. 4, no. 3, p. 189-194, 1980.
-
(1980)
European Journal of Operational Research
, vol.4
, Issue.3
, pp. 189-194
-
-
Erschler, J.1
Roubellat, F.2
Vernhes, J.-P.3
-
14
-
-
0025840039
-
A genetic algorithm for job shop
-
Institute of Electrical and Electronics Engineers International Conference on Robotics and Automation
-
FALKENAUER E. and BOUFFOUIX S., "A genetic algorithm for job shop", Institute of Electrical and Electronics Engineers International Conference on Robotics and Automation, p. 824-829, 1991.
-
(1991)
, pp. 824-829
-
-
Falkenauer, E.1
Bouffouix, S.2
-
15
-
-
0035368650
-
Handling soft constraints in hoist scheduling problems: the fuzzy approach
-
FARGIER H., and LAMOTHE J., "Handling soft constraints in hoist scheduling problems: the fuzzy approach", Engineering Applications of Artificial Intelligence, vol. 14, p. 387-399, 2001.
-
(2001)
Engineering Applications of Artificial Intelligence
, vol.14
, pp. 387-399
-
-
Fargier, H.1
Lamothe, J.2
-
16
-
-
0010776912
-
Applications de méthodes stochastiques inspirées du recuit simulé à des problèmes d'ordonnancement
-
FLEURY G., "Applications de méthodes stochastiques inspirées du recuit simulé à des problèmes d'ordonnancement", Automatique productique informatique industrielle, vol. 29, no. 4-5, p. 445-470, 1995.
-
(1995)
Automatique productique informatique industrielle
, vol.29
, Issue.4-5
, pp. 445-470
-
-
Fleury, G.1
-
17
-
-
0035889165
-
Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)
-
FLEURY G., GOURGAND M. and LACOMME P., "Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)", International Journal of Production Research, vol. 39, no. 15, p. 3419-3457, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.15
, pp. 3419-3457
-
-
Fleury, G.1
Gourgand, M.2
Lacomme, P.3
-
18
-
-
0001179988
-
Crane scheduling with time windows in circuit board production lines
-
GE Y. and YIH Y., "Crane scheduling with time windows in circuit board production lines", International Journal of Production Research, vol. 33, no. 5, p. 1187-1189, 1995.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1187-1189
-
-
Ge, Y.1
Yih, Y.2
-
19
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling theory: a survey
-
GRAHAM. R.L., LAWLER E.L., LENSTRA J.K. and RINNOOY KAN A.H.G., "Optimization and approximation in deterministic sequencing and scheduling theory: a survey", Ann. Discrete Math., vol. 5, p. 287-326, 1979.
-
(1979)
Ann. Discrete Math.
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
20
-
-
0031198423
-
The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line
-
GRUNDER O., BAPTISTE P. and CHAPPE D., "The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line", International Journal of Production Research, vol. 35, no. 8, p. 2189- 2211, 1997.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.8
, pp. 2189-2211
-
-
Grunder, O.1
Baptiste, P.2
Chappe, D.3
-
21
-
-
0011758398
-
Ordonnancement cyclique d'un robot sur une ligne de galvanoplastie: modèles et algorithmes
-
LITP/IBP, Pierre and Marie Curie University, Paris, LITP research report 93.30
-
HANEN C. and MUNIER A., Ordonnancement cyclique d'un robot sur une ligne de galvanoplastie: modèles et algorithmes, LITP/IBP, Pierre and Marie Curie University, Paris, LITP research report 93.30, 1993.
-
(1993)
-
-
Hanen, C.1
Munier, A.2
-
22
-
-
0004844636
-
Periodic scheduling of several hoists
-
Fourth International Workshop on Project Management and Scheduling, Leuven, Belgium
-
HANEN C., "Periodic scheduling of several hoists", Fourth International Workshop on Project Management and Scheduling, Leuven, Belgium, p. 108-110, 1994.
-
(1994)
, pp. 108-110
-
-
Hanen, C.1
-
23
-
-
3242735620
-
A constraint propagation heuristic for the single hoist, multiple products scheduling problem
-
HINDI K. S. and FLESZAR K., "A constraint propagation heuristic for the single hoist, multiple products scheduling problem", Computers and Industrial Engineering, vol. 47, p. 91-101, 2004.
-
(2004)
Computers and Industrial Engineering
, vol.47
, pp. 91-101
-
-
Hindi, K.S.1
Fleszar, K.2
-
24
-
-
28544441283
-
A contract net based intelligent agent system for solving the reactive hoist scheduling problems
-
JÉGOU D., KIM D.-W., BAPTISTE P. and LEE KWANG H., "A contract net based intelligent agent system for solving the reactive hoist scheduling problems", Expert Systems with Applications, vol. 30, p. 156-167, 2006.
-
(2006)
Expert Systems with Applications
, vol.30
, pp. 156-167
-
-
Jégou, D.1
Kim, D.-W.2
Baptiste, P.3
Lee Kwang, H.4
-
25
-
-
30544443075
-
Environmentally Conscious Hoist Scheduling for Electroplating Facilities
-
KUNTAY I., XU Q., UYGUN K. and HUANG Y. L., "Environmentally Conscious Hoist Scheduling for Electroplating Facilities", Chemical Engineering Communications, vol. 193, p. 273-292, 2006.
-
(2006)
Chemical Engineering Communications
, vol.193
, pp. 273-292
-
-
Kuntay, I.1
Xu, Q.2
Uygun, K.3
Huang, Y.L.4
-
26
-
-
0004071883
-
Optimisation des systèmes de production: méthodes stochastiques et approche multi-agents
-
PhD thesis, Clermont-Ferrand
-
LACOMME P., Optimisation des systèmes de production: méthodes stochastiques et approche multi-agents, PhD thesis, Clermont-Ferrand, 1998.
-
(1998)
-
-
Lacomme, P.1
-
27
-
-
0037834346
-
Une approche pour l'ordonnancement dynamique d'un atelier de traitement de surface
-
PhD Thesis, Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse
-
LAMOTHE J., Une approche pour l'ordonnancement dynamique d'un atelier de traitement de surface, PhD Thesis, Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, 1996.
-
(1996)
-
-
Lamothe, J.1
-
28
-
-
0004842097
-
A multihoist model for the real time hoist scheduling problem
-
Lille, France
-
LAMOTHE J., THIERRY C. and DELMAS J., "A multihoist model for the real time hoist scheduling problem", Computational Engineering in Systems Application Multiconference-Symposium on Discrete Events and Manufacturing Systems, Lille, France, p. 461-466, 1996.
-
(1996)
Computational Engineering in Systems Application Multiconference-Symposium on Discrete Events and Manufacturing Systems
, pp. 461-466
-
-
Lamothe, J.1
Thierry, C.2
Delmas, J.3
-
29
-
-
0011780965
-
On the optimal cyclic schedules of single hoist electroplating processes
-
Rutgers University, Research report no. 89-0006
-
LEI L. and WANG T.-J., On the optimal cyclic schedules of single hoist electroplating processes, Rutgers University, Research report no. 89-0006, 1989.
-
(1989)
-
-
Lei, L.1
Wang, T.-J.2
-
30
-
-
0003569152
-
A proof: the cyclic hoist scheduling problem is NPcomplete
-
Rutgers University, Research report no. 89-0016
-
LEI L. and WANG T.-J., A proof: the cyclic hoist scheduling problem is NPcomplete, Rutgers University, Research report no. 89-0016, 1989.
-
(1989)
-
-
Lei, L.1
Wang, T.-J.2
-
31
-
-
0000402860
-
The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints
-
LEI L. and WANG T.-J., "The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints", Management Science, vol. 37, no. 12, p. 1629-1639, 1991.
-
(1991)
Management Science
, vol.37
, Issue.12
, pp. 1629-1639
-
-
Lei, L.1
Wang, T.-J.2
-
32
-
-
0027684058
-
Determining the optimal starting time in a cyclic schedule with a given route
-
LEI L., "Determining the optimal starting time in a cyclic schedule with a given route", Computers and Operations Research, vol. 20, no. 8, p. 807-816, 1993.
-
(1993)
Computers and Operations Research
, vol.20
, Issue.8
, pp. 807-816
-
-
Lei, L.1
-
33
-
-
0027663342
-
Minimizing the fleet size with dependent time-window and single-track constraint
-
LEI L., ARMSTRONG R and GU S., "Minimizing the fleet size with dependent time-window and single-track constraint", Operations Research Letters, vol. 14, p. 91-98, 1993.
-
(1993)
Operations Research Letters
, vol.14
, pp. 91-98
-
-
Lei, L.1
Armstrong, R.2
Gu, S.3
-
34
-
-
0028396353
-
Determining the optimal cyclic hoist schedules in a single-hoist electroplating line
-
LEI L. and WANG T.-J., "Determining the optimal cyclic hoist schedules in a single-hoist electroplating line", Institute of Industrial Engineers Transactions, vol. 2, p. 25-33, 1994.
-
(1994)
Institute of Industrial Engineers Transactions
, vol.2
, pp. 25-33
-
-
Lei, L.1
Wang, T.-J.2
-
35
-
-
0020179439
-
Two-operation crane scheduling problems
-
LIEBERMAN R. W. and TURKSEN I. B., "Two-operation crane scheduling problems", Institute of Industrial Engineers Transactions, vol. 14, no. 3, p. 147-155, 1982.
-
(1982)
Institute of Industrial Engineers Transactions
, vol.14
, Issue.3
, pp. 147-155
-
-
Lieberman, R.W.1
Turksen, I.B.2
-
36
-
-
0031375139
-
A genetic algorithm for a single hoist scheduling in the printed-circuitboard electroplating line
-
LIM J.-M., "A genetic algorithm for a single hoist scheduling in the printed-circuitboard electroplating line", Computers and Industrial Engineering, vol. 33, no. 3-4, p. 789- 792, 1997.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.3-4
, pp. 789-792
-
-
Lim, J.-M.1
-
37
-
-
0036778727
-
Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution
-
LIU J., JIANG Y., and ZHOU Z., "Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution". IIE Transactions, vol. 34, no. 10, p. 905-914, 2002.
-
(2002)
IIE Transactions
, vol.34
, Issue.10
, pp. 905-914
-
-
Liu, J.1
Jiang, Y.2
Zhou, Z.3
-
38
-
-
0002784150
-
Etat de l'art: ordonnancement de robots de manutention en galvanoplastie
-
MANIER M.-A. and BAPTISTE P., "Etat de l'art: ordonnancement de robots de manutention en galvanoplastie", Automatique productique informatique industrielle, vol. 28, no. 1, p. 7-35, 1994.
-
(1994)
Automatique productique informatique industrielle
, vol.28
, Issue.1
, pp. 7-35
-
-
Manier, M.-A.1
Baptiste, P.2
-
39
-
-
0038510813
-
Contribution à l'ordonnancement cyclique du système de manutention d'une ligne de galvanoplastie
-
PhD Thesis, Besançon
-
MANIER-LACOSTE M.-A., Contribution à l'ordonnancement cyclique du système de manutention d'une ligne de galvanoplastie, PhD Thesis, Besançon, 1994.
-
(1994)
-
-
Manier-Lacoste, M.-A.1
-
40
-
-
0034175276
-
Constraint-based Model for the cyclic Multi-Hoists Scheduling Problem
-
MANIER M.-A., VARNIER C. and BAPTISTE P., "Constraint-based Model for the cyclic Multi-Hoists Scheduling Problem", Production Planning and Control, vol. 11, no. 3, p. 244-257, 2000.
-
(2000)
Production Planning and Control
, vol.11
, Issue.3
, pp. 244-257
-
-
Manier, M.-A.1
Varnier, C.2
Baptiste, P.3
-
41
-
-
0038266157
-
A Classification for Hoist Scheduling Problems
-
Kluwer Academic Publishers.
-
MANIER M.-A. and BLOCH C., "A Classification for Hoist Scheduling Problems", The International Journal of Flexible Manufacturing Systems, vol. 15, no. 1, p. 37-55, 2003, Kluwer Academic Publishers.
-
(2003)
The International Journal of Flexible Manufacturing Systems
, vol.15
, Issue.1
, pp. 37-55
-
-
Manier, M.-A.1
Bloch, C.2
-
42
-
-
40649104817
-
Design and scheduling of electroplating facilities
-
Troyes, France
-
MANIER M.-A. and LAMROUS S., "Design and scheduling of electroplating facilities", IEEE International Conference on Service Systems and Service Management, Troyes, France, p. 1114-1119, 2006.
-
(2006)
IEEE International Conference on Service Systems and Service Management
, pp. 1114-1119
-
-
Manier, M.-A.1
Lamrous, S.2
-
44
-
-
0035556817
-
A control model for multi-products processing
-
Antibes-Juan les Pins, France
-
MARTEAU S., BONHOMME P., AYGALINC P. and CALVEZ S., "A control model for multi-products processing", 8th IEEE International Conference on Emerging Technologies and Factory Automation, Antibes-Juan les Pins, France, vol. 1, p. 527-536, 2001.
-
(2001)
8th IEEE International Conference on Emerging Technologies and Factory Automation
, vol.1
, pp. 527-536
-
-
Marteau, S.1
Bonhomme, P.2
Aygalinc, P.3
Calvez, S.4
-
45
-
-
84889209786
-
Bounded cycle time for the cyclic hoist scheduling problem
-
Seville, Spain
-
MATEO M., COMPANYS R. and BAUTISTA J., "Bounded cycle time for the cyclic hoist scheduling problem", First World Conference on Production and Operations Management, Seville, Spain, p. 1-10, 2000.
-
(2000)
First World Conference on Production and Operations Management
, pp. 1-10
-
-
Mateo, M.1
Companys, R.2
Bautista, J.3
-
46
-
-
84889203435
-
Hoist scheduling in a chemical line to produce batches with identical sizes of different products
-
Sixième Conférence Francophone de Modélisation et Simulation: Modélisation, Optimisation et Simulation des Systèmes (MOSIM'06), Rabat, Morocco
-
MATEO M. and COMPANYS R., "Hoist scheduling in a chemical line to produce batches with identical sizes of different products", Sixième Conférence Francophone de Modélisation et Simulation: Modélisation, Optimisation et Simulation des Systèmes (MOSIM'06), Rabat, Morocco, p. 677-684, 2006.
-
(2006)
, pp. 677-684
-
-
Mateo, M.1
Companys, R.2
-
47
-
-
33750357201
-
A heuristic procedure for multi-item hoist production line
-
PAUL HENRIK J., BIERWIRTH C., and KOPFER H., "A heuristic procedure for multi-item hoist production line", International Journal of Production Economics", vol. 105, p. 54-69, 2007.
-
(2007)
International Journal of Production Economics"
, vol.105
, pp. 54-69
-
-
Paul Henrik, J.1
Bierwirth, C.2
Kopfer, H.3
-
48
-
-
0016962332
-
Mathematical programming solution of a hoist scheduling program
-
PHILLIPS L.W. and UNGER P.S., "Mathematical programming solution of a hoist scheduling program", American Institute of Industrial Engineers Transactions, vol. 8, no. 2, p. 219-225, 1976.
-
(1976)
American Institute of Industrial Engineers Transactions
, vol.8
, Issue.2
, pp. 219-225
-
-
Phillips, L.W.1
Unger, P.S.2
-
49
-
-
0001839035
-
No-wait periodic scheduling of non-identical parts in flexible manufacturing lines with fuzzy processing times
-
International Workshop on Intelligent Scheduling of Robots and Flexible Manufacturing Systems, Center for Technological Education, Holon Press, Holon, Israel
-
PTUSKIN A.S., "No-wait periodic scheduling of non-identical parts in flexible manufacturing lines with fuzzy processing times", International Workshop on Intelligent Scheduling of Robots and Flexible Manufacturing Systems, Center for Technological Education, Holon Press, Holon, Israel, p. 210-222, 1995.
-
(1995)
, pp. 210-222
-
-
Ptuskin, A.S.1
-
50
-
-
0036437171
-
An Improved Hybrid Model for the Generic Hoist Scheduling Problem
-
RIERA D. and YORKE-SMITH N., "An Improved Hybrid Model for the Generic Hoist Scheduling Problem", Annals of Operations Research, vol. 115, p. 173-191, 2002.
-
(2002)
Annals of Operations Research
, vol.115
, pp. 173-191
-
-
Riera, D.1
Yorke-Smith, N.2
-
51
-
-
84889187317
-
Contribution à l'ordonnancement dynamique de lignes de traitement de surface
-
PhD Thesis, Besançon
-
ROSSE-BLOCH C., Contribution à l'ordonnancement dynamique de lignes de traitement de surface, PhD Thesis, Besançon, 1999.
-
(1999)
-
-
Rosse-Bloch, C.1
-
52
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
SHAPIRO G.W. and NUTTLE H.L.W., "Hoist scheduling for a PCB electroplating facility", Institute of Industrial Engineers Transactions, vol. 20, no. 2, p. 157-167, 1988.
-
(1988)
Institute of Industrial Engineers Transactions
, vol.20
, Issue.2
, pp. 157-167
-
-
Shapiro, G.W.1
Nuttle, H.L.W.2
-
53
-
-
0029505811
-
An example for scheduling a chemical processing tank line
-
SONG W., STORCH R. L. and ZABINSKY Z. B., "An example for scheduling a chemical processing tank line", Symposium on Emerging Technologies and Factory Automation, Paris, France, vol. 1, p. 475-482, 1995.
-
(1995)
Symposium on Emerging Technologies and Factory Automation, Paris, France
, vol.1
, pp. 475-482
-
-
Song, W.1
Storch, R.L.2
Zabinsky, Z.B.3
-
54
-
-
0033153929
-
Control of an electroplating line in the Max and Min algebras
-
SPACEK P., MANIER M.-A. and EL MOUDNI A., "Control of an electroplating line in the Max and Min algebras", International Journal of Systems Science, vol. 30, no. 7, p. 759-778, 1999.
-
(1999)
International Journal of Systems Science
, vol.30
, Issue.7
, pp. 759-778
-
-
Spacek, P.1
Manier, M.-A.2
El Moudni, A.3
-
55
-
-
27644439216
-
Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line
-
SUBAI C., BAPTISTE P. and NIEL E., "Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line", International Journal of Production Economics, vol. 99, p. 74-87, 2006.
-
(2006)
International Journal of Production Economics
, vol.99
, pp. 74-87
-
-
Subai, C.1
Baptiste, P.2
Niel, E.3
-
56
-
-
0000168684
-
An expert scheduling system for material handling hoists
-
THESEN A. and LEI L., "An expert scheduling system for material handling hoists", Journal of Manufacturing Systems, vol. 9, no. 3, p. 247-252, 1990.
-
(1990)
Journal of Manufacturing Systems
, vol.9
, Issue.3
, pp. 247-252
-
-
Thesen, A.1
Lei, L.2
-
57
-
-
0031124354
-
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
-
ULUSOY G., SIVRIKAYA-SERIFOGLU F. and BILGE U., "A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles", Computers and Operations Research, vol. 24, no. 4, p. 335-351, 1997.
-
(1997)
Computers and Operations Research
, vol.24
, Issue.4
, pp. 335-351
-
-
Ulusoy, G.1
Sivrikaya-Serifoglu, F.2
Bilge, U.3
-
58
-
-
0042373626
-
Extensions du "Hoist Scheduling Problem" cyclique
-
Résolution basée sur un traitement des contraintes disjonctives en programmation en logique avec contraintes, PhD Thesis, Besançon
-
VARNIER C., Extensions du "Hoist Scheduling Problem" cyclique. Résolution basée sur un traitement des contraintes disjonctives en programmation en logique avec contraintes, PhD Thesis, Besançon, 1996.
-
(1996)
-
-
Varnier, C.1
-
59
-
-
0008941947
-
Resolution of the cyclic multi-hoist scheduling problem
-
VARNIER C., BACHELU A., BAPTISTE P., "Resolution of the cyclic multi-hoist scheduling problem", Information Systems and Operational Research, vol. 35, no. 4, p. 309-324, 1997.
-
(1997)
Information Systems and Operational Research
, vol.35
, Issue.4
, pp. 309-324
-
-
Varnier, C.1
Bachelu, A.2
Baptiste, P.3
-
60
-
-
84889206915
-
A cyclic approach for the multi-product HSP
-
7th Workshop on Project Management and Scheduling, Osnabrück, Germany
-
VARNIER C., JEUNEHOMME N., "A cyclic approach for the multi-product HSP", 7th Workshop on Project Management and Scheduling, Osnabrück, Germany, 2000.
-
(2000)
-
-
Varnier, C.1
Jeunehomme, N.2
-
61
-
-
11144256163
-
Graph-Assisted Cyclic Hoist Scheduling for Environmentally Benign Electroplating
-
XU Q. and HUANG Y., "Graph-Assisted Cyclic Hoist Scheduling for Environmentally Benign Electroplating", Industrial and Engineering Chemistry Research, vol. 43, no. 26, p. 8307-8316, 2004.
-
(2004)
Industrial and Engineering Chemistry Research
, vol.43
, Issue.26
, pp. 8307-8316
-
-
Xu, Q.1
Huang, Y.2
-
62
-
-
0034890160
-
Solving multiple hoist scheduling problems by use of simulated annealing
-
YANG G.W., JU D.P., ZHENG W.M. and LAM K., "Solving multiple hoist scheduling problems by use of simulated annealing", Ruan Jian Xue Bao/Journal of Software, vol. 12, no. 1, p. 11-17, 2001.
-
(2001)
Ruan Jian Xue Bao/Journal of Software
, vol.12
, Issue.1
, pp. 11-17
-
-
Yang, G.W.1
Ju, D.P.2
Zheng, W.M.3
Lam, K.4
-
63
-
-
0027562597
-
Robot scheduling in a circuit board production line: an OR/ANN approach
-
YIH Y., LIANG T.P. and MOSKOWITZ H., "Robot scheduling in a circuit board production line: an OR/ANN approach", Institute of Industrial Engineers Transactions, vol. 25, no. 2, p. 26-33, 1993.
-
(1993)
Institute of Industrial Engineers Transactions
, vol.25
, Issue.2
, pp. 26-33
-
-
Yih, Y.1
Liang, T.P.2
Moskowitz, H.3
-
64
-
-
0028395989
-
An algorithm for hoist scheduling problems
-
YIH Y., "An algorithm for hoist scheduling problems", International Journal of Production Research, vol. 32, no. 3, p. 501-516, 1994.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.3
, pp. 501-516
-
-
Yih, Y.1
-
65
-
-
0037404554
-
Single hoist cyclic scheduling with multiple tanks: a material handling solution
-
ZHOU Z. and LI L., "Single hoist cyclic scheduling with multiple tanks: a material handling solution", Computers & Operations Research, vol. 30, no. 6, p. 811-819, 2003.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.6
, pp. 811-819
-
-
Zhou, Z.1
Li, L.2
|