Volumn , Issue , 2010, Pages 193-231

Hoist Scheduling Problem

Author keywords

Electrolytic baths; Electroplating systems; Scheduling problems; Scientific community; Scientific literature

Indexed keywords


EID: 84880191829     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1002/9780470611050.ch8     Document Type: Chapter
Times cited : (10)

References (65)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • ADAMS J., BALAS E. and ZAWACK D., "The shifting bottleneck procedure for job shop scheduling", Management Science, vol. 34, no. 3, p. 391-401, 1988.
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0004907103 scopus 로고
    • A bounding scheme for deriving the minimal cycle time of a single-transporter n-stage process with time-window constraints
    • ARMSTRONG R., LEI L. and SHANHONG G., "A bounding scheme for deriving the minimal cycle time of a single-transporter n-stage process with time-window constraints", European Journal of Operational Research, vol. 75, p. 1-11, 1994.
    • (1994) European Journal of Operational Research , vol.75 , pp. 1-11
    • Armstrong, R.1    Lei, L.2    Shanhong, G.3
  • 3
    • 0030145165 scopus 로고    scopus 로고
    • A greedy algorithm to determine the number of transporters in a cyclic electroplating process
    • ARMSTRONG R., GU S. and LEI L., "A greedy algorithm to determine the number of transporters in a cyclic electroplating process", Institute of Industrial Engineers Transactions, vol. 28, no. 5, p. 347-355, 1996.
    • (1996) Institute of Industrial Engineers Transactions , vol.28 , Issue.5 , pp. 347-355
    • Armstrong, R.1    Gu, S.2    Lei, L.3
  • 5
    • 0037496863 scopus 로고    scopus 로고
    • Hoist scheduling problem: state-of-the-art
    • Fourth International Federation of Automatic Control Workshop on Intelligent Manufacturing Systems, Seoul, Korea
    • BLOCH C., BACHELU A., VARNIER C. and BAPTISTE P., "Hoist scheduling problem: state-of-the-art", Fourth International Federation of Automatic Control Workshop on Intelligent Manufacturing Systems, Seoul, Korea, p. 177-185, 1997.
    • (1997) , pp. 177-185
    • Bloch, C.1    Bachelu, A.2    Varnier, C.3    Baptiste, P.4
  • 6
    • 0038510811 scopus 로고    scopus 로고
    • A taboo search combined with a modified shifting bottleneck heuristic for solving a blocking scheduling problem with bounded processing times
    • 15th Conference of the International Federation of Operational Research Societies, Beijing, China
    • BLOCH C., VARNIER C. and BAPTISTE P., "A taboo search combined with a modified shifting bottleneck heuristic for solving a blocking scheduling problem with bounded processing times", 15th Conference of the International Federation of Operational Research Societies, Beijing, China, p. 125-126, 1999.
    • (1999) , pp. 125-126
    • Bloch, C.1    Varnier, C.2    Baptiste, P.3
  • 8
    • 0029427108 scopus 로고
    • Couplage méthodes d'ordonnancement - simulation pour l'ordonnancement de systèmes industriels de traitement de surface
    • CAUX C., FLEURY G., GOURGAND M. and KELLERT P., "Couplage méthodes d'ordonnancement - simulation pour l'ordonnancement de systèmes industriels de traitement de surface", RAIRO-Recherche Opérationnelle, vol. 29, no. 4, p. 391, 1995.
    • (1995) RAIRO-Recherche Opérationnelle , vol.29 , Issue.4 , pp. 391
    • Caux, C.1    Fleury, G.2    Gourgand, M.3    Kellert, P.4
  • 9
    • 0037496866 scopus 로고    scopus 로고
    • Solving a hoist scheduling problem as a sequencing problem
    • International Federation of Automatic Control/International Federation for Information Processing Conference on Management and Control of Production and Logistics, Campinas, Brazil
    • CAUX C. and PIERREVAL H., "Solving a hoist scheduling problem as a sequencing problem", International Federation of Automatic Control/International Federation for Information Processing Conference on Management and Control of Production and Logistics, Campinas, Brazil, p. 372-376, 1997.
    • (1997) , pp. 372-376
    • Caux, C.1    Pierreval, H.2
  • 12
    • 0031072439 scopus 로고    scopus 로고
    • A tabu search heuristic for the vehicle routing problem with backhauls and time windows
    • DUHAMEL C., POTVIN J.Y. and ROUSSEAU J.M., "A tabu search heuristic for the vehicle routing problem with backhauls and time windows", Transportation Science, vol. 31, no. 1, p. 49-59, 1997.
    • (1997) Transportation Science , vol.31 , Issue.1 , pp. 49-59
    • Duhamel, C.1    Potvin, J.Y.2    Rousseau, J.M.3
  • 13
    • 0018995327 scopus 로고
    • Characterizing the set of feasible sequences for n jobs to be carried out on a single machine
    • ERSCHLER J., ROUBELLAT F. and VERNHES J.-P., "Characterizing the set of feasible sequences for n jobs to be carried out on a single machine", European Journal of Operational Research, vol. 4, no. 3, p. 189-194, 1980.
    • (1980) European Journal of Operational Research , vol.4 , Issue.3 , pp. 189-194
    • Erschler, J.1    Roubellat, F.2    Vernhes, J.-P.3
  • 14
    • 0025840039 scopus 로고
    • A genetic algorithm for job shop
    • Institute of Electrical and Electronics Engineers International Conference on Robotics and Automation
    • FALKENAUER E. and BOUFFOUIX S., "A genetic algorithm for job shop", Institute of Electrical and Electronics Engineers International Conference on Robotics and Automation, p. 824-829, 1991.
    • (1991) , pp. 824-829
    • Falkenauer, E.1    Bouffouix, S.2
  • 15
    • 0035368650 scopus 로고    scopus 로고
    • Handling soft constraints in hoist scheduling problems: the fuzzy approach
    • FARGIER H., and LAMOTHE J., "Handling soft constraints in hoist scheduling problems: the fuzzy approach", Engineering Applications of Artificial Intelligence, vol. 14, p. 387-399, 2001.
    • (2001) Engineering Applications of Artificial Intelligence , vol.14 , pp. 387-399
    • Fargier, H.1    Lamothe, J.2
  • 16
    • 0010776912 scopus 로고
    • Applications de méthodes stochastiques inspirées du recuit simulé à des problèmes d'ordonnancement
    • FLEURY G., "Applications de méthodes stochastiques inspirées du recuit simulé à des problèmes d'ordonnancement", Automatique productique informatique industrielle, vol. 29, no. 4-5, p. 445-470, 1995.
    • (1995) Automatique productique informatique industrielle , vol.29 , Issue.4-5 , pp. 445-470
    • Fleury, G.1
  • 17
    • 0035889165 scopus 로고    scopus 로고
    • Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)
    • FLEURY G., GOURGAND M. and LACOMME P., "Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)", International Journal of Production Research, vol. 39, no. 15, p. 3419-3457, 2001.
    • (2001) International Journal of Production Research , vol.39 , Issue.15 , pp. 3419-3457
    • Fleury, G.1    Gourgand, M.2    Lacomme, P.3
  • 18
    • 0001179988 scopus 로고
    • Crane scheduling with time windows in circuit board production lines
    • GE Y. and YIH Y., "Crane scheduling with time windows in circuit board production lines", International Journal of Production Research, vol. 33, no. 5, p. 1187-1189, 1995.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1187-1189
    • Ge, Y.1    Yih, Y.2
  • 19
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling theory: a survey
    • GRAHAM. R.L., LAWLER E.L., LENSTRA J.K. and RINNOOY KAN A.H.G., "Optimization and approximation in deterministic sequencing and scheduling theory: a survey", Ann. Discrete Math., vol. 5, p. 287-326, 1979.
    • (1979) Ann. Discrete Math. , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 20
    • 0031198423 scopus 로고    scopus 로고
    • The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line
    • GRUNDER O., BAPTISTE P. and CHAPPE D., "The relationship between the physical layout of the work stations and the productivity of a saturated single-hoist production line", International Journal of Production Research, vol. 35, no. 8, p. 2189- 2211, 1997.
    • (1997) International Journal of Production Research , vol.35 , Issue.8 , pp. 2189-2211
    • Grunder, O.1    Baptiste, P.2    Chappe, D.3
  • 21
    • 0011758398 scopus 로고
    • Ordonnancement cyclique d'un robot sur une ligne de galvanoplastie: modèles et algorithmes
    • LITP/IBP, Pierre and Marie Curie University, Paris, LITP research report 93.30
    • HANEN C. and MUNIER A., Ordonnancement cyclique d'un robot sur une ligne de galvanoplastie: modèles et algorithmes, LITP/IBP, Pierre and Marie Curie University, Paris, LITP research report 93.30, 1993.
    • (1993)
    • Hanen, C.1    Munier, A.2
  • 22
    • 0004844636 scopus 로고
    • Periodic scheduling of several hoists
    • Fourth International Workshop on Project Management and Scheduling, Leuven, Belgium
    • HANEN C., "Periodic scheduling of several hoists", Fourth International Workshop on Project Management and Scheduling, Leuven, Belgium, p. 108-110, 1994.
    • (1994) , pp. 108-110
    • Hanen, C.1
  • 23
    • 3242735620 scopus 로고    scopus 로고
    • A constraint propagation heuristic for the single hoist, multiple products scheduling problem
    • HINDI K. S. and FLESZAR K., "A constraint propagation heuristic for the single hoist, multiple products scheduling problem", Computers and Industrial Engineering, vol. 47, p. 91-101, 2004.
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 91-101
    • Hindi, K.S.1    Fleszar, K.2
  • 24
    • 28544441283 scopus 로고    scopus 로고
    • A contract net based intelligent agent system for solving the reactive hoist scheduling problems
    • JÉGOU D., KIM D.-W., BAPTISTE P. and LEE KWANG H., "A contract net based intelligent agent system for solving the reactive hoist scheduling problems", Expert Systems with Applications, vol. 30, p. 156-167, 2006.
    • (2006) Expert Systems with Applications , vol.30 , pp. 156-167
    • Jégou, D.1    Kim, D.-W.2    Baptiste, P.3    Lee Kwang, H.4
  • 25
    • 30544443075 scopus 로고    scopus 로고
    • Environmentally Conscious Hoist Scheduling for Electroplating Facilities
    • KUNTAY I., XU Q., UYGUN K. and HUANG Y. L., "Environmentally Conscious Hoist Scheduling for Electroplating Facilities", Chemical Engineering Communications, vol. 193, p. 273-292, 2006.
    • (2006) Chemical Engineering Communications , vol.193 , pp. 273-292
    • Kuntay, I.1    Xu, Q.2    Uygun, K.3    Huang, Y.L.4
  • 26
    • 0004071883 scopus 로고    scopus 로고
    • Optimisation des systèmes de production: méthodes stochastiques et approche multi-agents
    • PhD thesis, Clermont-Ferrand
    • LACOMME P., Optimisation des systèmes de production: méthodes stochastiques et approche multi-agents, PhD thesis, Clermont-Ferrand, 1998.
    • (1998)
    • Lacomme, P.1
  • 27
    • 0037834346 scopus 로고    scopus 로고
    • Une approche pour l'ordonnancement dynamique d'un atelier de traitement de surface
    • PhD Thesis, Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse
    • LAMOTHE J., Une approche pour l'ordonnancement dynamique d'un atelier de traitement de surface, PhD Thesis, Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, 1996.
    • (1996)
    • Lamothe, J.1
  • 29
    • 0011780965 scopus 로고
    • On the optimal cyclic schedules of single hoist electroplating processes
    • Rutgers University, Research report no. 89-0006
    • LEI L. and WANG T.-J., On the optimal cyclic schedules of single hoist electroplating processes, Rutgers University, Research report no. 89-0006, 1989.
    • (1989)
    • Lei, L.1    Wang, T.-J.2
  • 30
    • 0003569152 scopus 로고
    • A proof: the cyclic hoist scheduling problem is NPcomplete
    • Rutgers University, Research report no. 89-0016
    • LEI L. and WANG T.-J., A proof: the cyclic hoist scheduling problem is NPcomplete, Rutgers University, Research report no. 89-0016, 1989.
    • (1989)
    • Lei, L.1    Wang, T.-J.2
  • 31
    • 0000402860 scopus 로고
    • The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints
    • LEI L. and WANG T.-J., "The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints", Management Science, vol. 37, no. 12, p. 1629-1639, 1991.
    • (1991) Management Science , vol.37 , Issue.12 , pp. 1629-1639
    • Lei, L.1    Wang, T.-J.2
  • 32
    • 0027684058 scopus 로고
    • Determining the optimal starting time in a cyclic schedule with a given route
    • LEI L., "Determining the optimal starting time in a cyclic schedule with a given route", Computers and Operations Research, vol. 20, no. 8, p. 807-816, 1993.
    • (1993) Computers and Operations Research , vol.20 , Issue.8 , pp. 807-816
    • Lei, L.1
  • 33
    • 0027663342 scopus 로고
    • Minimizing the fleet size with dependent time-window and single-track constraint
    • LEI L., ARMSTRONG R and GU S., "Minimizing the fleet size with dependent time-window and single-track constraint", Operations Research Letters, vol. 14, p. 91-98, 1993.
    • (1993) Operations Research Letters , vol.14 , pp. 91-98
    • Lei, L.1    Armstrong, R.2    Gu, S.3
  • 34
    • 0028396353 scopus 로고
    • Determining the optimal cyclic hoist schedules in a single-hoist electroplating line
    • LEI L. and WANG T.-J., "Determining the optimal cyclic hoist schedules in a single-hoist electroplating line", Institute of Industrial Engineers Transactions, vol. 2, p. 25-33, 1994.
    • (1994) Institute of Industrial Engineers Transactions , vol.2 , pp. 25-33
    • Lei, L.1    Wang, T.-J.2
  • 36
    • 0031375139 scopus 로고    scopus 로고
    • A genetic algorithm for a single hoist scheduling in the printed-circuitboard electroplating line
    • LIM J.-M., "A genetic algorithm for a single hoist scheduling in the printed-circuitboard electroplating line", Computers and Industrial Engineering, vol. 33, no. 3-4, p. 789- 792, 1997.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3-4 , pp. 789-792
    • Lim, J.-M.1
  • 37
    • 0036778727 scopus 로고    scopus 로고
    • Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution
    • LIU J., JIANG Y., and ZHOU Z., "Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution". IIE Transactions, vol. 34, no. 10, p. 905-914, 2002.
    • (2002) IIE Transactions , vol.34 , Issue.10 , pp. 905-914
    • Liu, J.1    Jiang, Y.2    Zhou, Z.3
  • 38
    • 0002784150 scopus 로고
    • Etat de l'art: ordonnancement de robots de manutention en galvanoplastie
    • MANIER M.-A. and BAPTISTE P., "Etat de l'art: ordonnancement de robots de manutention en galvanoplastie", Automatique productique informatique industrielle, vol. 28, no. 1, p. 7-35, 1994.
    • (1994) Automatique productique informatique industrielle , vol.28 , Issue.1 , pp. 7-35
    • Manier, M.-A.1    Baptiste, P.2
  • 39
    • 0038510813 scopus 로고
    • Contribution à l'ordonnancement cyclique du système de manutention d'une ligne de galvanoplastie
    • PhD Thesis, Besançon
    • MANIER-LACOSTE M.-A., Contribution à l'ordonnancement cyclique du système de manutention d'une ligne de galvanoplastie, PhD Thesis, Besançon, 1994.
    • (1994)
    • Manier-Lacoste, M.-A.1
  • 40
    • 0034175276 scopus 로고    scopus 로고
    • Constraint-based Model for the cyclic Multi-Hoists Scheduling Problem
    • MANIER M.-A., VARNIER C. and BAPTISTE P., "Constraint-based Model for the cyclic Multi-Hoists Scheduling Problem", Production Planning and Control, vol. 11, no. 3, p. 244-257, 2000.
    • (2000) Production Planning and Control , vol.11 , Issue.3 , pp. 244-257
    • Manier, M.-A.1    Varnier, C.2    Baptiste, P.3
  • 43
  • 46
    • 84889203435 scopus 로고    scopus 로고
    • Hoist scheduling in a chemical line to produce batches with identical sizes of different products
    • Sixième Conférence Francophone de Modélisation et Simulation: Modélisation, Optimisation et Simulation des Systèmes (MOSIM'06), Rabat, Morocco
    • MATEO M. and COMPANYS R., "Hoist scheduling in a chemical line to produce batches with identical sizes of different products", Sixième Conférence Francophone de Modélisation et Simulation: Modélisation, Optimisation et Simulation des Systèmes (MOSIM'06), Rabat, Morocco, p. 677-684, 2006.
    • (2006) , pp. 677-684
    • Mateo, M.1    Companys, R.2
  • 49
    • 0001839035 scopus 로고
    • No-wait periodic scheduling of non-identical parts in flexible manufacturing lines with fuzzy processing times
    • International Workshop on Intelligent Scheduling of Robots and Flexible Manufacturing Systems, Center for Technological Education, Holon Press, Holon, Israel
    • PTUSKIN A.S., "No-wait periodic scheduling of non-identical parts in flexible manufacturing lines with fuzzy processing times", International Workshop on Intelligent Scheduling of Robots and Flexible Manufacturing Systems, Center for Technological Education, Holon Press, Holon, Israel, p. 210-222, 1995.
    • (1995) , pp. 210-222
    • Ptuskin, A.S.1
  • 50
    • 0036437171 scopus 로고    scopus 로고
    • An Improved Hybrid Model for the Generic Hoist Scheduling Problem
    • RIERA D. and YORKE-SMITH N., "An Improved Hybrid Model for the Generic Hoist Scheduling Problem", Annals of Operations Research, vol. 115, p. 173-191, 2002.
    • (2002) Annals of Operations Research , vol.115 , pp. 173-191
    • Riera, D.1    Yorke-Smith, N.2
  • 51
    • 84889187317 scopus 로고    scopus 로고
    • Contribution à l'ordonnancement dynamique de lignes de traitement de surface
    • PhD Thesis, Besançon
    • ROSSE-BLOCH C., Contribution à l'ordonnancement dynamique de lignes de traitement de surface, PhD Thesis, Besançon, 1999.
    • (1999)
    • Rosse-Bloch, C.1
  • 55
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line
    • SUBAI C., BAPTISTE P. and NIEL E., "Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line", International Journal of Production Economics, vol. 99, p. 74-87, 2006.
    • (2006) International Journal of Production Economics , vol.99 , pp. 74-87
    • Subai, C.1    Baptiste, P.2    Niel, E.3
  • 56
    • 0000168684 scopus 로고
    • An expert scheduling system for material handling hoists
    • THESEN A. and LEI L., "An expert scheduling system for material handling hoists", Journal of Manufacturing Systems, vol. 9, no. 3, p. 247-252, 1990.
    • (1990) Journal of Manufacturing Systems , vol.9 , Issue.3 , pp. 247-252
    • Thesen, A.1    Lei, L.2
  • 57
    • 0031124354 scopus 로고    scopus 로고
    • A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
    • ULUSOY G., SIVRIKAYA-SERIFOGLU F. and BILGE U., "A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles", Computers and Operations Research, vol. 24, no. 4, p. 335-351, 1997.
    • (1997) Computers and Operations Research , vol.24 , Issue.4 , pp. 335-351
    • Ulusoy, G.1    Sivrikaya-Serifoglu, F.2    Bilge, U.3
  • 58
    • 0042373626 scopus 로고    scopus 로고
    • Extensions du "Hoist Scheduling Problem" cyclique
    • Résolution basée sur un traitement des contraintes disjonctives en programmation en logique avec contraintes, PhD Thesis, Besançon
    • VARNIER C., Extensions du "Hoist Scheduling Problem" cyclique. Résolution basée sur un traitement des contraintes disjonctives en programmation en logique avec contraintes, PhD Thesis, Besançon, 1996.
    • (1996)
    • Varnier, C.1
  • 60
    • 84889206915 scopus 로고    scopus 로고
    • A cyclic approach for the multi-product HSP
    • 7th Workshop on Project Management and Scheduling, Osnabrück, Germany
    • VARNIER C., JEUNEHOMME N., "A cyclic approach for the multi-product HSP", 7th Workshop on Project Management and Scheduling, Osnabrück, Germany, 2000.
    • (2000)
    • Varnier, C.1    Jeunehomme, N.2
  • 61
    • 11144256163 scopus 로고    scopus 로고
    • Graph-Assisted Cyclic Hoist Scheduling for Environmentally Benign Electroplating
    • XU Q. and HUANG Y., "Graph-Assisted Cyclic Hoist Scheduling for Environmentally Benign Electroplating", Industrial and Engineering Chemistry Research, vol. 43, no. 26, p. 8307-8316, 2004.
    • (2004) Industrial and Engineering Chemistry Research , vol.43 , Issue.26 , pp. 8307-8316
    • Xu, Q.1    Huang, Y.2
  • 62
    • 0034890160 scopus 로고    scopus 로고
    • Solving multiple hoist scheduling problems by use of simulated annealing
    • YANG G.W., JU D.P., ZHENG W.M. and LAM K., "Solving multiple hoist scheduling problems by use of simulated annealing", Ruan Jian Xue Bao/Journal of Software, vol. 12, no. 1, p. 11-17, 2001.
    • (2001) Ruan Jian Xue Bao/Journal of Software , vol.12 , Issue.1 , pp. 11-17
    • Yang, G.W.1    Ju, D.P.2    Zheng, W.M.3    Lam, K.4
  • 63
    • 0027562597 scopus 로고
    • Robot scheduling in a circuit board production line: an OR/ANN approach
    • YIH Y., LIANG T.P. and MOSKOWITZ H., "Robot scheduling in a circuit board production line: an OR/ANN approach", Institute of Industrial Engineers Transactions, vol. 25, no. 2, p. 26-33, 1993.
    • (1993) Institute of Industrial Engineers Transactions , vol.25 , Issue.2 , pp. 26-33
    • Yih, Y.1    Liang, T.P.2    Moskowitz, H.3
  • 64
    • 0028395989 scopus 로고
    • An algorithm for hoist scheduling problems
    • YIH Y., "An algorithm for hoist scheduling problems", International Journal of Production Research, vol. 32, no. 3, p. 501-516, 1994.
    • (1994) International Journal of Production Research , vol.32 , Issue.3 , pp. 501-516
    • Yih, Y.1
  • 65
    • 0037404554 scopus 로고    scopus 로고
    • Single hoist cyclic scheduling with multiple tanks: a material handling solution
    • ZHOU Z. and LI L., "Single hoist cyclic scheduling with multiple tanks: a material handling solution", Computers & Operations Research, vol. 30, no. 6, p. 811-819, 2003.
    • (2003) Computers & Operations Research , vol.30 , Issue.6 , pp. 811-819
    • Zhou, Z.1    Li, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.