메뉴 건너뛰기




Volumn 18, Issue 11, 2012, Pages 2554-2561

Close-loop prediction method of logistics bottleneck based on bottleneck polymorphism

Author keywords

Bottleneck closed loop prediction; Bottleneck polymorphism; Bottleneck shifting index; Production logistics

Indexed keywords

BOTTLENECK SHIFTING INDEX; CLOSE LOOP; CLOSED-LOOP PREDICTIONS; DECISION MECHANISM; MANUFACTURING UNITS; POLYMORPHISM ANALYSIS; PREDICTION METHODS; PREDICTION PROBLEM; PRODUCTION LOGISTICS; STATISTIC ANALYSIS; TECHNOLOGICAL SUPPORTS; UNCERTAIN ENVIRONMENTS;

EID: 84871442508     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (6)

References (19)
  • 1
    • 18844410306 scopus 로고    scopus 로고
    • Application of the theory of constraints to a bottleneck operation in a manufacturing plant
    • PEGELS C, WATROUS C. Application of the theory of constraints to a bottleneck operation in a manufacturing plant [J]. Journal of Manufacturing Technology Management, 2005, 16(3): 302-311.
    • (2005) Journal of Manufacturing Technology Management , vol.16 , Issue.3 , pp. 302-311
    • Pegels, C.1    Watrous, C.2
  • 2
    • 33646357251 scopus 로고    scopus 로고
    • Method of shifting bottleneck analysis in knowledge-oirented manufacturing system
    • Chinese source
    • SHI Wenwu, YAN Hongsen. Method of shifting bottleneck analysis in knowledge-oirented manufacturing system [J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 271-279(in Chinese).
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.2 , pp. 271-279
    • Shi, W.1    Yan, H.2
  • 4
    • 70449688157 scopus 로고    scopus 로고
    • Data-driven bottleneck detection of manufacturing systems
    • LI L, CHANG Q, NI J. Data-driven bottleneck detection of manufacturing systems [J]. International Journal of Production Research, 2009, 47(18): 5019-5036.
    • (2009) International Journal of Production Research , vol.47 , Issue.18 , pp. 5019-5036
    • Li, L.1    Chang, Q.2    Ni, J.3
  • 7
    • 77953730287 scopus 로고    scopus 로고
    • Multi-reentrant manufacturing system scheduling based on layered bottleneck analysis
    • Chinese source
    • QIAO Fei, MA Yumin, LI Li, et al. Multi-reentrant manufacturing system scheduling based on layered bottleneck analysis [J]. Computer Integrated Manufacturing Systems, 2010, 16(4): 855-860(in Chinese).
    • (2010) Computer Integrated Manufacturing Systems , vol.16 , Issue.4 , pp. 855-860
    • Qiao, F.1    Ma, Y.2    Li, L.3
  • 8
    • 80051553712 scopus 로고    scopus 로고
    • Optimal scheduling of semiconductor manufacturing system based on improved Petri net model
    • Chinese source
    • SU Guojun, WANG Xionghai. Optimal scheduling of semiconductor manufacturing system based on improved Petri net model [J]. Systems Engineering-Theory&Practice, 2011, 31(7): 1372-1377(in Chinese).
    • (2011) Systems Engineering-Theory&Practice , vol.31 , Issue.7 , pp. 1372-1377
    • Su, G.1    Wang, X.2
  • 9
    • 44449114278 scopus 로고    scopus 로고
    • Real-time scheduling of dynamic bottleneck facilities of wafer fabrication processes
    • Chinese source
    • LI Xiaohong, ZHOU Binghai. Real-time scheduling of dynamic bottleneck facilities of wafer fabrication processes [J]. Journal of Shanghai Jiaotong University, 2008, 42(4): 599-606(in Chinese).
    • (2008) Journal of Shanghai Jiaotong University , vol.42 , Issue.4 , pp. 599-606
    • Li, X.1    Zhou, B.2
  • 10
    • 77951529618 scopus 로고    scopus 로고
    • A bottleneck detection and dynamic dispatching strategy for semiconductor wafer fabrication facilities
    • Washington, D.C., USA: IEEE
    • ZHOU Z G, ROSE O. A bottleneck detection and dynamic dispatching strategy for semiconductor wafer fabrication facilities [C]//Proceedings of the 2009 Winter Simulation Conference. Washington, D.C., USA: IEEE, 2009: 1646-1656.
    • (2009) Proceedings of the 2009 Winter Simulation Conference , pp. 1646-1656
    • Zhou, Z.G.1    Rose, O.2
  • 11
    • 79551649350 scopus 로고    scopus 로고
    • Influence of bottleneck utilization on job shop scheduling under random disturbance
    • Chinese source
    • WANG Junqiang, CHEN Jian, ZHAI Yingni, et al. Influence of bottleneck utilization on job shop scheduling under random disturbance [J]. Computer Integrated Manufacturing Systems, 2010, 16(12): 2680-2687(in Chinese).
    • (2010) Computer Integrated Manufacturing Systems , vol.16 , Issue.12 , pp. 2680-2687
    • Wang, J.1    Chen, J.2    Zhai, Y.3
  • 12
    • 79551628560 scopus 로고    scopus 로고
    • Machine bottleneck identification for Job Shop operation management
    • Chinese source
    • WANG Gang, WANG Junqiang, SUN Shudong, et al. Machine bottleneck identification for Job Shop operation management [J]. Mechanical Science and Technology for Aerospace Engineering, 2010, 29(12): 1697-1702(in Chinese).
    • (2010) Mechanical Science and Technology for Aerospace Engineering , vol.29 , Issue.12 , pp. 1697-1702
    • Wang, G.1    Wang, J.2    Sun, S.3
  • 13
    • 79957655562 scopus 로고    scopus 로고
    • Scheduling algorithm based on bottleneck operations decomposition for large-scale Job Shop scheduling problems
    • Chinese source
    • ZHAI Yingni, SUN Shudong, WANG Junqiang, et al. Scheduling algorithm based on bottleneck operations decomposition for large-scale Job Shop scheduling problems [J]. Computer Integrated Manufacturing Systems, 2011, 17(4): 826-831(in Chinese).
    • (2011) Computer Integrated Manufacturing Systems , vol.17 , Issue.4 , pp. 826-831
    • Zhai, Y.1    Sun, S.2    Wang, J.3
  • 14
    • 78149397827 scopus 로고    scopus 로고
    • Bottleneck detection method based on orthogonal experiment for Job Shop
    • Chinese source
    • ZHAI Yingni, SUN Shudong, WANG Junqiang, et al. Bottleneck detection method based on orthogonal experiment for Job Shop [J]. Computer Integrated Manufacturing Systems, 2010, 16(9): 1945-1952(in Chinese).
    • (2010) Computer Integrated Manufacturing Systems , vol.16 , Issue.9 , pp. 1945-1952
    • Zhai, Y.1    Sun, S.2    Wang, J.3
  • 15
    • 80051553873 scopus 로고    scopus 로고
    • Multi-bottleneck scheduling algorithm for large-scale Job Shop
    • Chinese source
    • ZHAI Yingni, SUN Shudong, YANG Hong'an, et al. Multi-bottleneck scheduling algorithm for large-scale Job Shop [J]. Computer Integrated Manufacturing Systems, 2011, 17(7): 1486-1493(in Chinese).
    • (2011) Computer Integrated Manufacturing Systems , vol.17 , Issue.7 , pp. 1486-1493
    • Zhai, Y.1    Sun, S.2    Yang, H.3
  • 16
    • 84855443042 scopus 로고    scopus 로고
    • Bottleneck machine identification method based on constraint transformation for job shop scheduling with genetic algorithms
    • ZHANG R, WU C. Bottleneck machine identification method based on constraint transformation for job shop scheduling with genetic algorithms [J]. Information Sciences, 2012, 188(7): 236-252.
    • (2012) Information Sciences , vol.188 , Issue.7 , pp. 236-252
    • Zhang, R.1    Wu, C.2
  • 17
    • 70749099497 scopus 로고    scopus 로고
    • Dynamic prediction method of production logistics bottleneck based on bottleneck index
    • LIU M Z, TANG J, GE M G, et al. Dynamic prediction method of production logistics bottleneck based on bottleneck index [J]. Chinese Journal of Mechanical Engineering, 2009, 22(5): 710-716.
    • (2009) Chinese Journal of Mechanical Engineering , vol.22 , Issue.5 , pp. 710-716
    • Liu, M.Z.1    Tang, J.2    Ge, M.G.3
  • 18
    • 77952500498 scopus 로고    scopus 로고
    • Factory agile production scheduling modeling based on Petri net
    • Chinese source
    • CHEN Youling, ZHANG Yongyang, SUN Ya'nan, et al. Factory agile production scheduling modeling based on Petri net [J]. Computer Integrated Manufacturing Systems, 2010, 16(3): 598-602(in Chinese).
    • (2010) Computer Integrated Manufacturing Systems , vol.16 , Issue.3 , pp. 598-602
    • Chen, Y.1    Zhang, Y.2    Sun, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.