-
1
-
-
77952481242
-
Production scheduling management
-
in Chinese
-
Han Guotao, Zhou Guanghui, Liu Taizong. Production scheduling management[J]. Journal of Beer Science & Technology, 2008, 37(1): 2-3(in Chinese).
-
(2008)
Journal of Beer Science & Technology
, vol.37
, Issue.1
, pp. 2-3
-
-
Han, G.1
Zhou, G.2
Liu, T.3
-
3
-
-
34047208829
-
A hybrid particle swarm optimization(PSO) algorithm schemes for integrated process planning and production scheduling
-
Beijing: Publishing House of Electronics Industry
-
Zhao Fuqing, Zhu Aihong, Yu Dongmei, et al. A hybrid particle swarm optimization(PSO) algorithm schemes for integrated process planning and production scheduling[C]//Proceedings of the 6th World Congress on Intelligent Control and Automation. Beijing: Publishing House of Electronics Industry, 2006: 6772-6776.
-
(2006)
Proceedings of the 6th World Congress on Intelligent Control and Automation
, pp. 6772-6776
-
-
Zhao, F.1
Zhu, A.2
Yu, D.3
-
4
-
-
77952533059
-
Structural theory researches based on Petri net
-
Chengdu: Xihua University, (in Chinese)
-
Yang Bo. Structural theory researches based on Petri net[D].Chengdu: Xihua University, 2008(in Chinese).
-
(2008)
-
-
Yang, B.1
-
6
-
-
67650081709
-
-
Beijing: Tsinghua University Press, (in Chinese)
-
Wang Liya, Chen Youling, Ma Hanwu, et al. Production Planning And Control[M]. Beijing: Tsinghua University Press, 2007: 135-139(in Chinese).
-
(2007)
Production Planning And Control
, pp. 135-139
-
-
Wang, L.1
Chen, Y.2
Ma, H.3
-
7
-
-
67650069495
-
Production process object modeling based on Petri nets
-
in Chinese
-
Chen Youling, Zhang Yongyang, Qin Chenghai.et al. Production process object modeling based on Petri nets[J].Computer Integrated Manufacturing Systems, 2009, 15(6): 1075-1080(in Chinese).
-
(2009)
Computer Integrated Manufacturing Systems
, vol.15
, Issue.6
, pp. 1075-1080
-
-
Chen, Y.1
Zhang, Y.2
Qin, C.3
-
8
-
-
16644381187
-
Research on priority scheduling algorithm based on bottleneck analysis
-
in Chinese
-
Li Li, Cheng Ye, Yuan Shouhua. Research on priority scheduling algorithm based on bottleneck analysis[J]. Computer Integrated Manufacturing Systems, 2005, 11(2): 247-250(in Chinese).
-
(2005)
Computer Integrated Manufacturing Systems
, vol.11
, Issue.2
, pp. 247-250
-
-
Li, L.1
Cheng, Y.2
Yuan, S.3
-
9
-
-
33745130104
-
Application of the analytic method of fuzzy optimization and dynamic programming among multiple-objectives in the allocation of the planar resources
-
in Chinese
-
Wu Kaixin, Huang Tianmin, Guo Qianqian. Application of the analytic method of fuzzy optimization and dynamic programming among multiple-objectives in the allocation of the planar resources[J].Journal of Hainan Normal University: Natural Science, 2006, 19(2): 111-115(in Chinese).
-
(2006)
Journal of Hainan Normal University: Natural Science
, vol.19
, Issue.2
, pp. 111-115
-
-
Wu, K.1
Huang, T.2
Guo, Q.3
-
10
-
-
77952480441
-
Grid resource distribution based on fuzzy multi-objective decision making
-
in Chinese
-
Feng Jianhong, Liu Ying, Luo Ying, et al, Grid resource distribution based on fuzzy multi-objective decision making[J]. Journal of Computer Applications, 2008, 28(6): 1588-1590(in Chinese).
-
(2008)
Journal of Computer Applications
, vol.28
, Issue.6
, pp. 1588-1590
-
-
Feng, J.1
Liu, Y.2
Luo, Y.3
et al4
|